HomeMy WebLinkAboutReso - PC - 2022.05.23 - 8EDocuSigrr Envelope lD 588442D5- M7 A4220-BAC842AD3CZ772BF
RECORDING REQUESTED BY:
Planning Department
City of Burlingame
WHEN RECORDED MAIL TO:
COMMUNITY DEVELOPMENT DEPARTMENT
CITY OF BURLINGAME
501 PRIMROSE ROAD
BURLINGAME, CA 94010
2A 22-066360
3:37 pm 0910912022 Rl Fee: NO FEE
Count of Pages4
Recorded in Off icialRecords
CountY of San Mateo
Mark Church
Assesso r-Co u ntY C lerk-Recorder
4
l ll]r i r illill ilffill llll lllll lllll lilll llllltllltlllll llillllll ll lli llll*-s i o o o : z I 7 5 6 o $ *
Resolution No. 2022-05.23-8E
1369 COLUMBUS AVENUE
APN 027-153-020
TITLE OF DOCUMENT
I hereby certify this to be a full, true and conect copy of the
document it purports to be, the original of which is on file in my
office.
June 3 2022
&r^^ir,u Arkltt
bJl.,I.IE
a:
Date:
Kevin Gardiner, AICP, Community Development
-{
RESOLUTION APPROVING CATEGORICAL EXEMPTION, DESIGN REVIEW
AND SPECIAL PERMITS
RESOLVED, by the Planning Commission of the City of Burlingame that:
WHEREAS, a Categorical Exemption has been prepared and application has been made for Desiqn
Review and Special Permits for buildinq heiqht. second storv plate heiqht. and second story balconv for
a new two-storv. sinole-unit dwellinq at 1369 Columbus Avenue, Zone R-1, Anui Batra and Mishthi
Kapoor, propertv owners, APN: 027-153-020;
WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on Mav 23'
M., at which time it reviewed and considered the staff report and all other written materials and
testimony presented at said hearing;
NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that:
1. On the basis of the lnitial study and the documents submitted and reviewed, and comments
received and addressed by this Commission, it is hereby found that there is no substantial
evidence that the project r"t tortn above will have a significant effect on the environment, and
categorical"*"rpilon, per Section 15303 (a), which states that construction of a limited number
of new, small facilities or structures including one single family residence or a second dwelling
unit in a residential zone is exempt from environmental review. ln urbanized areas, up to three
single-family residences maybe constructed or converted under this exemption, is hereby
approved.
2. Said Design Review and Special permits are approved subject to the c_onditions set forth in Exhibit
,,A,, attached hereto. Findings for such Design Review and Special Permits are set forth in the
staff report, minutes, and recording of said meeting'
3.It is further directed that a certified copy of this resolution be recorded in the official records of the
County of San Mateo
Chairperson
Secretary of the Pla Commission of the City of Burlingame, dong
hereby certify that the foregoing resolution was introduced and adopted at a regular meeting of the
Planning Commission held on the 23rd dav of Mav,2022 by the following vote
1369 COLUTBUSAVENUE - RESO 2022{t5'23{E
AYES: HORAN'
LOWENTHAL, PFAFF, SCHTID' TSE
NOES: NONE
ABSENT COHAROTO,GAUL
REGUSED: NONE
EXHIBIT "A"
Conditions of Approval for Categorical Exemption, Design Review and Special Permits
1369 Columbus Avenue
Effective June 2, 2022
Page 1
1 that the project shall be built as shown on the plans submitted to the Planning Division and
date stamped May 11,2022, sheets A.1 through 4.6, N.1, L-1 through L-3, and Topographic &
Boundary Survey;
that any changes to building materials, exterior finishes, windows, architectural features, roof
height or pitch, and amount ortype of hardscape materials shall be subject to Planning Division
or Planning Commission review (FYl or amendment to be determined by planning staff);
that any changes to the size or envelope of the first or second floors which would include
adding or enlarging a dormer(s), shall require an amendment to this permit;
that any recycling containers, debris boxes or dumpsters for the construction project shall be
placed upon the private property, if feasible, as determined by the Community Development
Director;
that demolition for removal of the existing structures and any grading or earth moving on the
site shall not occur until a building permit has been issued and such site work shall be required
to comply with all the regulations of the Bay Area Air Quality Management District;
that prior to issuance of a building permit for construction of the project, the project construction
plans shall be modified to include a cover sheet listing all conditions of approval adopted by
the Planning commission, or city council on appeal; which shall remain a part of all sets of
approved plans throughout the construction process. compliance with all conditions of
approval is required; the conditions of approval shall not be modified or changed without the
approval of the Planning Commission, or City Council on appeal;
that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single
termination and installed on the portions of the roof not visible from the street; and that these
venting details shall be included and approved in the construction plans before a Building
permit is issued;
that the project shall comply with the Construction and Demolition Debris Recycling Ordinance
which requires affected demolition, new construction and alteration projects to submit a Waste
Reduction plan and meet recycling requirements; any partial or full demolition of a shucture,
interior or exterior, shall require a demolition permit;
that the project shall meet all the requirements of the California Building and Uniform Fire
Codes, in effect at time of building permit submittal, as amended by the City of Burlingame;
10. that prior to scheduling the framing inspection the applicant shall provide a certification by the
project architect or residential designer, or another architect or residential design professional,
that demonstrates that the project falls at or below the maximum approved floor area ratio for
the property;
3
4
E
b
7
8
I
THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION
PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION:
that prior to scheduling the framing inspection the project architect or residential desjgner, or
another architect or residential design professional, shall provide an architectural certificalion
that the architectural details shown in the approved design which should be evident at framing,
such as window locations and bays, are built as shown on the approved plans; architectural
certification documenting framing compliance with approved design shall be submitted to the
Building Division before the final framing inspection shall be scheduled;
that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of
the roof ridge and provide certification oI that height to the Building Division; and
14.that prior to final inspection, Planning Division staff will inspect and note compliance of the
architectural details (trim materials, window type, etc.) to verify that the project has been built
according to the approved Planning and Building plans.
12
EXHIBIT "A"
Conditions ofApprovalfor Categorical Exemption, Design Review and Special Permits
'1369 Columbus Avenue
Effective June 2, 2022
Page 2
11. that prior to scheduling the foundation inspection, a licensed surveyor shall locate the property
corners, set the building footprint and certify the first floor elevation of the new structure(s)
based on the elevation at the top of the form boards per the approved plans; this survey shall
be accepted by the City Engineer;
13.