Loading...
HomeMy WebLinkAboutReso - PC - 2022.05.23 - 8DDocuSign Envelope lD: 588442D5-A27 A4220-BAC842AD3C77728F RECORDI NG REQUESTED BY: Planning Department City of Burlingame WHEN RECORDED MAIL TO: COMMUNITY DEVELOPMENT DEPARTMENT CITY OF BURLINGAME 501 PRIMROSE ROAD BURLINGAME, CA 94010 2A22-066359 3:37 pm O9tOgt2O22 Rl Fee: NO FEE Count of Pages 4 Recorded in Official Records CountY of San Mateo Mark Church Assesso r-Co u ntY Clerk-Recorder 4 rIl]l! illll lifl l[rl[llu illllilllllllullllllllllllllllll! llll!] Resolution No. 2022-05.23-8D 2201 HILLSIDE DRIVE APN 027-152-010 TITLE OF DOGUMENT I hereby certify this to be a full, true and correct copy ofthe document it purports to be, the original of which is on file in my office. June3,2022 hr^^rto hrktut Date: Kevin Gardiner, AICP, Community Development Director RESOLUTION APPROVING CATEGORIGAL EXEMPTION AND DESTGN REVTEW AND FRONT SETBACK VARIANCE RESOLVED, by the Planning Commission of the City of Burlingame that: WHEREAS, a Categorical Exemption has been prepared and application has been made for Desiqn Review and a Front Setback Variance for sinqle storv additions to an existinq sinqle-unit dwellinq at2201 Hillside Drive. Zone R-1, Charles and Shirlev Paterson. propertv owners, APN: 027-152-010; WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on Mav 23, 2022, at which time it reviewed and considered the staff report and all other written materials and testimony presented at said hearing; NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that: On the basis of the lnitial Study and the documents submitted and reviewed, and comments received and addressed by this Commission, it is hereby found that there is no substantial evidence that the project set forth above will have a significant effect on the environment, and categorical exemption, per Section 15301(eX1) of the CEQA Guidelines, which states that additions to existing structures are exempt from environmental review, provided the addition would not result in an increase of more than 50o/o of the floor area of the structures before the addition, is hereby approved. Said Design Review and Front Setback Variance are approved subject to the conditions set forth in Exhibit "A" attached hereto. Findings for such Design Review and Front Setback Variance are set forth in the staff report, minutes, and recording of said meeting. 3. lt is further directed that a certified copy of this resolution be recorded in the official records of the County of San Mateo ch rperson Secretary of the Planni Commission of the City of Burlingame, do hereby certify that the foregoing resolution was introduced and adopted at a regular meeting of the Planning Commission held on the 23rd dav of Mav.2022 by the following vote: 1 2 LOWENTHAL, PFAFF, TSE NOES: SCHilIDli5enrt cotARoro,GAuL REGUSED: NONE cretary 1 EXHIBIT "A" Conditions of Approval for Categorical Exemption and Design Review and Variance 2201 Hillside Drive Effective June 2,2022 Page 1 that the project shall be built as shown on the plans submitted to the Planning Division and date stamped May 17,2022, sheets A.1 through A.8, L1.0 through L2.5, and Boundary and Topographic Survey dated July 2021; that prior to issuance of a building permit, an FYI application shall be submitted incorporating the following items: 1) redesign the exterior staiMay located to the left of the garage to a simpler design and 2) change the exterior material of the area under the balcony to match the siding on the house; that any changes to building materials, exterior finishes, windows, architectural features, roof height or pitch, and amount or type of hardscape materials shall be subject to Planning Division or Planning Commission review (FYl or amendment to be determined by Planning staff); that any changes to the size or envelope of the basemenl, first or second floors, or garage, which would include adding or enlarging a dormer(s), shall require an amendment to this permit; that any recycling containers, debris boxes or dumpslers for the construclion project shall be placed upon the private property, if feasible, as determined by the Community Development Director; that demolition for removal of the existing structures and any grading or earth moving on the site shall not occur until a building permit has been issued and such site work shall be required to comply with all the regulations of the Bay Area Air Quality Management District; that priorto issuance ofa building permit for construction ofthe project, the project construction plans shall be modified to include a cover sheet listing all conditions of approval adopted by the Planning Commission, or City Council on appeal; which shall remain a part of all sets of approved plans throughout the construction process. Compliance with all conditions of approval is required; the conditions of approval shall not be modified or changed without the approval of the Planning Commission, or City Council on appeal; that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single termination and installed on the portions of the roof not visible from the street; and that these venting details shall be included and approved in the construction plans before a Building permit is issued; that the project shall comply with the Construction and Demolition Debris Recycling Ordinance which requires affected demolition, new construction and alteration projects to submit a Waste Reduction plan and meet recycling requirements; any partial or full demolition of a structure, interior or exterior, shall require a demolition permit; that the project shall meet all the requirements of the California Building and Uniform Fire Codes, in effect at time of building permit submittal, as amended by the City of Burlingame; 2 a o 10. 3. 4. 5. 6. 7. EXHIBIT "A" Conditions of Approval for Categorical Exemption and Design Review and Variance 2201 Hillside Drive Effective June 2,2022 THE FOLLOWING CONDITIONS SHALL BE II,IET DURING THE BUILOING PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION: INSPECTION 11. that prior to scheduling the framing inspection the applicant shall provide a certification by the project architect or residential designer, or another architect or residential design professional, that demonstrates that the project falls at or below the maximum approved floor area ratio for the property; (not necessary if FAR is 200 SF + feet under max). 12.that prior to scheduling the framing inspection the project architect or residential designer, or another architect or residential design professional, shall provide an architectural certification that the architectural details shown in the approved design which should be evident at framing, such as window locations and bays, are built as shown on the approved plans; architectural certification documenting framing compliance with approved design shall be submitted to the Building Division before the final framing inspection shall be scheduled; and 13.that prior to final inspection, Planning Division staff would inspect and note compliance of the architectural details (trim materials, window type, etc.) to verify that the project has been built according to the approved Planning and Building plan