Loading...
HomeMy WebLinkAboutReso - PC - 2022.05.23 - 8ADocuSign EqFlope lO: 588442D5-A27 A4220-BAC8-42AD3C77728F RECORDING REQUESTED BY: Planning Department City of Burlingame WHEN RECORDED MAIL TO: COMMUNITY DEVELOPMENT DEPARTMENT CITY OF BURLINGAME 501 PRIMROSE ROAD BURLINGAME, CA 94010 2,022-066356 3:37 pm 0910912022 Rl Fee: NO FEE Count of Pages4 Recorded in Off icialRecords County of San Mateo Mark Church Assesso r-Co u nty Clerk-Recorder 4 Ill]tI IilillltilililililIt]ltiilitililtililIililtffi ilil1 ililIItiiffi*$R0003287556$* Resolution No. 2022-05.23-8A 1928 DEVEREUX DRIVE APN 025-122-270 TITLE OF DOCUMENT I hereby certify this to be a full, true and correct copy of the document it purports to be, the original of which is on file in my office. June 3 2022 &rrr,ru hrl,inr*Rff JA \,UNE \) Date: Kevin Gardiner, AICP, Community Development Director RESOLUTION APPROVING CATEGORIGAL EXEMPTION AND DESIGN REVIEW RESOLVED, by the Planning Commission of the City of Burlingame that WHEREAS, a Categorical Exemption has been prepared and application has been made for Desiqn Reviewfor a first and second storv addition to an existino sinqle-unit dwellinq at 1928 Devereux Drive, Zoned R-1. Michael and Jino Liu.owners, APN : 025- 122-27 0: WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on Mav 23. 2022, at which time it reviewed and considered the staff report and all other written materials and testimony presented at said hearing; NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that: On the basis of the lnitial Study and the documents submitted and reviewed, and comments received and addressed by this Commission, it is hereby found that there is no substantial evidence that the project set forth above will have a significant effect on the environment, and categorical exemption, per CEQA Section 15301(eX2), which states that additions to existing structures are exempt from environmental review, provided the addition will not result in an increase of more than 10,000 SF in areas where all public services and facilities are available and the area in which the project is located is not environmentally sensitive, is hereby approved. Said Design Review is approved subject to the conditions set forth in Exhibit "A" attached hereto. Findings for such Design Review are set forth in the staff report, minutes, and recording of said meeting. 3. lt is further directed that a certified copy of this resolution be recorded in the official records of the County of San Mateo irperson 1 2 r,5.k)h)EA[T*A,(- , hereby certify that the foregoi Planning Commission held Secretary of the Planning Commission of the ng resolution was introduced and adopted at aon the 2-3! day of May, 2022 by City of Burlingame, do regular meeting of thethe following vote: 1928 DE\TEREUX ORIVE - RESO 2022{15'23{A AYES: HORAN' LOWENTHAL, PFAFF, SGHUID' TSE NOES: NONE ABSENT: COMAROTO,GAUL REGUSED: NONE Secretary EXHIBIT "A" Conditions of Approval for Categorical Exemption and Design Review 1928 Devereux Drive Effective June 2, 2022 Page 1 1 that the project shall be built as shown on the plans submitted to the Planning Division date stamped May 12, 2022, sheets GO, A1 .0 through A4.0, and site survey sheet; that the existing nonconforming wall and foundation, located within the left side setback at 3'- 3" where 5'-0" is required per code and measuring 21'-0" in length, shall not be removed during construction; if any wall studs or foundation, or both, along the existing nonconforming length are removed during construction, either an application for a Side Setback Variance will be required to replace the wall at the same location or an application for a Design Review Amendment will be required showing compliance with cunent setback requirements; that the existing nonconforming wall and foundation, located within the front setback (garage wall) at 15'-3" where 35'-0" is required per code for a two-car attached garage and measuring 18'-0" in length, shall not be removed during construction; if any wall studs or foundation, or both, along the existing nonconforming length are removed during construction, either an application for a Front Setback Variance will be required to replace the wall at the same location or an application for a Design Review Amendment will be required showing compliance with current setback requirements; that any changes to building materials, exterior finishes, windows, architectural features, roof height or pitch, and amount or type of hardscape materials shall be subject to Planning Division or Planning Commission review (FYl or amendment to be determined by Planning staff); that prior to issuance of a building permit for construction of the project, the p@ect construction plans shall be modified to include a cover sheet listing all conditions of approval adopted by the Planning Commission, or City Council on appeal; which shall remain a part of all sets of approved plans throughout the construction process. Compliance with all conditions of approval is required; the conditions of approval shall not be modified or changed without the approval of the Planning Commission, or City Council on appeal; that any changes to the size or envelope of the first or second floors, or garage, which would include adding or enlarging a dormer(s), shall require an amendment to this permit; that any recycling containers, debris boxes or dumpsters for the construction project shall be placed upon the private property, if feasible, as determined by the Community Development Director; that demolition for removal of the existing structures and any grading or earth moving on the site shall not occur until a building permit has been issued and such site work shall be required to comply with all the regulations of the Bay Area Air Quality Management District; that prior to issuance of a building permit for construction of the poect, the project construction plans shall be modified to include a cover sheet listing all conditions of approval adopted by the Planning Commission, or City Council on appeal; which shall remain a part of all sets of approved plans throughout the construction process. Compliance with all conditions of approval is required; the conditions of approval shall not be modified or changed without the approval of the Planning Commission, or City Council on appeal; 2 2 4 E 6 7 8 I EXHIBIT "A" Conditions of Approval for Categorical Exemption and Design Review 1928 Devereux Drive Effective June 2, 2022 10. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single termination and installed on the portions of the roof not visible from the street; and that these venting details shall be included and approved in the construction plans before a Building permit is issued; 11. that the project shall comply with the Construction and Demolition Debris Recycling Ordinance which requires affected demolition, new construction and alteration projects to submit a Waste Reduction plan and meet recycling requirements; any partial or full demolition of a structure, interior or exterior, shall require a demolition permit; 12. that the project shall meet all the requirements of the California Building and Uniform Fire Codes, in effect at time of building permit submittal, as amended by the City of Burlingame; THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION PROCESS PRIOR TO THE INSPEGTIONS NOTED IN EACH CONDITION: 13.that prior to scheduling the framing inspection the applicant shall provide a certification by the project architect or residential designer, or another architect or residential design professional, that demonstrates thal the project falls at or below the maximum approved floor area ratio for the property; 14 that prior to scheduling the framing inspection the project architect or residential designer, or another architect or residential design professional, shall provide an architectural certification that the architectural details shown in the approved design which should be evident at framing, such as window locations and bays, are built as shown on the approved plans; architectural certification documenting framing compliance with approved design shall be submitted to the Building Division before the final framing inspection shall be scheduled; 15 that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of the roof ridge and provide certification of that height to the Building Division; and 16.that prior to final inspection, Planning Division staff will inspect and note compliance of the architectural details (trim materials, window type, etc.) to verify that the project has been built according to the approved Planning and Building plans.