HomeMy WebLinkAboutReso - PC - 2022.04.11 - 8C:
DocuSign Envelope lD: 5C4ABE71-FF2E-4E43-8659-i8C688164C68
RECORDING REQUESTED BY:
Planning Department
City of Burlingame
WHEN RECORDED MAIL TO:
COMMUNITY DEVELOPMENT DEPARTMENT
CITY OF BURLINGAME
501 PRIMROSE ROAD
BURLINGAME, CA 94010
2022-066353
3:37 pm 0910912022 Rl Fee: NO FEE
Count of Pages 4
Recorded in Off icialRecords
County of San Mateo
Mark Church
Assesso r-Co u nty Clerk-Recoder
I
ililil l ilililil lllll lllll lllll illll llll lllll lllll illt lilll illl l l lll llll,$Rooo3z87553$*
Resolution No. 2022-04.1 1 -8C
1536 COLUMBUS AVENUE
APN 027-141-270
TITLE OF DOCUMENT
I hereby certify this to be a full, true and conect copy of the
document it purpotu to be, the original of which is on file in my
office.
04.22.22
h^^iru i .a t
'r
Date:
Kevin Gardiner, AICP, Commu
JUNE
RESOLUTION APPROVING CATEGORICAL EXEMPTTON AND DESIGN REVIEW
RESOLVED, by the Planning Commission of the City of Burlingame that:
WHEREAS, a Categorical Exemption has been prepared and application has been made for Desiqn
Review for a first and second floor addition (maior renovation) to an existino sinqle-unit dwellinq at l_536columbus Avenue, Zoned R-1. Jackson Hsieh. propertv owner, ApN: o2z-141-27q
WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on April
11.2022, at which time it reviewed and considered the statf report and all otherwrittenhaterials and
testimony presented at said hearing;
NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that:
1. On the basis of the lnitial Study and the documents submitted and reviewed, and comments
received and addressed by this Commission, it is hereby found that there is no substantial
evidence that the project set forth above will have a significant etfect on the environment, and
categorical exemption, per CEQA Section 15301 (eX2) of the CEQA Guidelines, which states
that additions to existing structures are exempt from environmental review, provided the additionwill not result in an increase of more than 10,oOO SF in areas where all public services andfacilities are available and the area in which the project is located is not environmentally
sensitive, is hereby approved.
2. Said Design Review is approved subject to the conditions set forth in Exhibit "A" attachedhereto. Findings for such Design Review is set forth in the staff report, minutes, and recording
of said meeting.
3. lt is further directed that a certified copy of this resolution be official records of
the County of San Mateo.
Secretary of the Planning Commission of the City of
Burlingame, do hereby certify that the forego ing resolution was introduced and adopted at a regular
meeting of the Planning Commission held on the 11th dav ot April. 2022 by the foltowing vote
1S16 COLUTBUSAVEI{UE - RESO 2022{t4.11{cAYES: COUAROTO,GAUL,PFAFF,
SCHTID, TSENOES: NONE
ABSENT I{ONE
REGUSED: LOFTIS, TERROII|ES
t,
EXHIBIT "A"
2
that the project shall be built as shown on the plans submitted to the Planning Division date
stamped March21,2022, sheets T.0, BMP.1, Topographic Survey, Sp..1, DM..l, A.,l through
A.8;
that any changes to building materials, exterior finishes, windows, architectural features, roof
height or pitch, and amount or type of hardscape materials shall be subject to planning
Division or Planning commission review (Fyl or amendment to be determined by planning
staff);
that any changes to the size or envelope of the basement, first or second floors, or garage,
which would include adding or enlarging a dormer(s), shall require an amendmenito this
permit;
that any recycling containers, debris boxes or dumpsters for the construction project shall beplaced upon the private property, if feasible, as determined by the community Development
Director;
that demolition for removal of the existing structures and any grading or earth moving on thesite shall not occur until a building permit has been issued and such site work ina ue
required to comply with all the regulations of the Bay Area Air euality Management District;
that prior to issuance of a building permit for construction of the project, the project
construction plans shall be modified to include a cover sheet listing all conditions of approval
adopted by-the Planning commission, or city council on appeal; which snall remain a part ofall sets of approved plans throughout the construction process. compliance with allconditions of approval is required; the conditions of approval shall not be modified or
changed without the approval of the planning Commission, or City Council on appeal;
that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single
termination and installed on the portions of the roof not visible from the sireet; and that theseventing details shall be included and approved in the construction plans before a Buildingpermit is issued;
that the project shall comply with the construction and Demolition Debris Recycling
ordinance which requires affected demolition, new construction and alteration pro;ects tosubmit a waste Reduction plan and meet recycling requirements; any partial'or full
demolition of a structure, interior or exterior, shall require a demolition permit;
that the proiect shall meet all the requirements of the California Building and Uniform Firecodes, in effect at time of building permit submittal, as amended by the ciiy of Burlingame;
2
4
b
7
8
I
Conditions of Approval for Categorical Exemption and Design Review
1536 Columbus Avenue
Effective April 21, 2022
Page 1
EXHIBIT "A"
Conditions of Approval for Categorical Exemption and Design Review
1536 Columbus Avenue
Effective April 21, 2022
Page 2
THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION
PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION:
10. that prior to scheduling the framing inspection the applicant shall provide a certification by the
project architect or residential designer, or another architect or residential design professional,
that demonstrates that the project falls at or below the maximum approved floor area ratio for
the property;
11. that prior to scheduling the framing inspection the project architect or residential designer, or
another architect or residential design professional, shall provide an architectural certification
that the architectural details shown in the approved design which should be evident at
framing, such as window locations and bays, are built as shown on the approved plans;
architectural certification documenting framing compliance with approved design shall be
submitted to the Building Division before the final framing inspection shall be scheduled;
12. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of
the roof ridge and provide certification of that height to the Building Division; and
13. that prior to final inspection, Planning Division staff will inspect and note compliance of the
architectural details (trim materials, window type, etc.) to verify that the project has been built
according to the approved Planning and Building plans.