HomeMy WebLinkAboutReso - PC - 2020.11.23 - 10BDocuSign Envelope lD: DEA78943-1992{629-840A-BECD93E4SD97
RECORDING REQUESTED BY
Planning Department
City of Burlingame
WHEN RECORDED MAIL TO:
COMMUNITY DEVELOPMENT DEPARTMENT
CITY OF BURLINGAME
501 PRIMROSE ROAD
BURLINGAME, CA 94010
2021-167910
12:35 pm 12l$el21 Rl Fee: NO FEE
Count of Pages 4
Recorded in Official Records
CountY of San Mateo
Mark Church
tlru tuirfiilrjiillfi Uuxfinfiiltllfll[iut 1
tttlr
Resolution No. 2020-1 1 .23-10b
1515 LOS ALTOS DRIVE
027-043-030
TITLE OF DOCUMENT
I hereby certify this to be a full, true and correct copy of the
document it purports to be, the original of wtrich is on file in my
office.
October 2021
&rrrw hrl,i,,rtt
tjrrUr{Fl
Date:
Kevin Gardiner, AICP, Community Development
4f
RESOLUTION APPROVING GATEGORICAL EXEMPTION, AMENDMENT TO DESIGN REVIEW
AND HILLSIDE AREA CONSTRUCTION PERMIT, SPECIAL PERMIT AND VARIANCES
RESOLVED, by the Planning Commission of the City of Burlingame that:
WHEREAS, a Categorical Exemption has been prepared and application has been made for
Amendment to Desion Review and Hillside Area Construction Permit. Special Permit and Variances for
chanoes to a previouslv approved first and second storv addition to an existinq sinqle familv dwellinq at
1515 Los Altos Drive. Zoned R-1 . Stefanie Wen and Peter Wise. propertv owners. APN: 027-043-030;
WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on
November 23, 2020, at which time it reviewed and considered the staff report and all other written
materials and testimony presented at said hearing;
NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that:
1. On the basis of the lnitial Study and the documents submitted and reviewed, and comments
received and addressed by this Commission, it is hereby found that there is no substantial evidence
that the project set forth above will have a significant effect on the environment, and categorical
exemption, per CEQA Section 15303 (a), which states that construction of a limited numberof
new, small facilities or structures including one single family residence or a second dwelling unit
in a residential zone is exempt from environmental review. ln urbanized areas, up to three
single-family residences may be constructed or converted under this exception, is hereby
approved.
2 Said Amendment to Design Review, Hillside Area Construction Permit, Special Permit, and
Variances approved subject to the conditions set forth in Exhibit "A" attached hereto. Findings
for such Amendment to Design Review and Hillside Area Construction Permit, and Special
Permit, and Variances are set forth in the staff report, minutes, and recording of said meeting.
It is further directed that a certified copy of this resolution be recorded in the official records of3.
the County of San Mateo.
ai
r, f,.su+f4lb , secretary of the ptanning comm n of the City of Burlingame, do
hereby certify that the foregoing resolution was introduced and adopted at a regular meeting of the
Planning Commission held on the 23rd dav of November, 2020,by the following vote:
15_1 q_r-Os AtrQs: DR - RESO 2020-11.23_10bAYES: COilAROTO, Catn, LOEF-
SCHTID, TERRONES, TSEIIIOES: NOI{E
ABSENT: SARGEIiIT
RECUSED: NONE
EXHIBIT "A"
Conditions of Approval for Categorical Exemption, Amendment to Design Review and
Hillside Area Construction Permit, Special Permit and Variances
l515 Los Altos Drive
Effective December 3, 2020
Page 1
that the project shall be built as shown on the plans submitted to the planning Division
date stamped November 12, 2020, sheets A0.2 through A3.5;
1
2 that any changes to building materials, exterior finishes, windows, architectural features,
roof height or pitch, and amount or type of hardscape materials shall be subject to
Planning Division or Planning Commission review (FYl or amendment to be determined
by Planning staff);
that any changes to the size or envelope of the first or second floors, or garage which
would include adding or enlarging a dormer (s), shall require an amendment to this
permit;
that any recycling containers, debris boxes or dumpsters for the construction project
shall be placed upon the private property, if feasible, as determined by the Community
Development Director; that demolition or removal of the existing structures and any
grading or earth moving on the site shall not occur until a building permit has been
issued and such site work shall be required to comply with all the regulations of the Bay
Area Air Quality Management District;
that prior to issuance of a building permit for construction of the project, the project
construction plans shall be modified to include a cover sheet listing all conditions of
approval adopted by the Plannlng Commission, or City Council on appeal; which shall
remain a part of all sets of approved plans throughout the construction process.
Compliance with all conditions of approval is required; the conditions of approval shall
not be modified or changed without the approval of the Planning Commission, or City
Council on appeal;
that all air ducts, plumbing vents, and flies shall be combined, where possible, to a single
termination and installed on the portions of the roof not visible from the street; and that
these venting details shall be included and approved in the construction plans before a
Building permit is issued;
that the project shall comply with the Construction and Demolition Debris Recycling
Ordinance which requires affected demolition, new construction and alteration projects to
submit a Waste Reduction plan and meet recycling requirements; any partial or full
demolition of a structure, interior or exterior, shall require a demolition permit;
that the project shall meet all the requirements of the California Building and Uniform Fire
Codes, in effect at time of building permit submittal, as amended by the City of
Burlingame;
THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION
PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION:
J
4
q
6
7
I
o
Conditions of Approval for Categorical Exemption, Amendment to Design Review and
Hillside Area Construction Permit, Special Permit and Variances
'15'15 Los Altos Drive
Effective December 3, 2020
Page2
that prior to scheduling the framing inspection the applicant shall provide a certification
by the project architect or residential designer, or another architect or residential design
professional, that demonslrates that the project falls at or below the maximum approved
floor area ratio for the property;
10.that prior to scheduling the foundation inspection, a licensed surveyor shall locate the
property corners, set the building footprint and certify the first floor elevation of the new
structure(s) based on the elevation at the top of the form boards per the approved plans;
this survey shall be accepted by the City Engineer;
11
12
13
prior to scheduling the framing inspection the project architect or residential designer, or
another architect or residential design professional, shall provide an architectural
certification that the architectural certification that the architectural details shown in the
approved design which should be evident at framing, such as window locations and
bays, are built as shown on the approved plans; architectural certification documenting
framing compliance with approved design shall be submitted to the Building Division
before the final framing inspection shall be scheduled;
that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the
height of the roof ridge and provide certification of that height to the Buitding Division;
and
that prior to final inspection, Planning Division staff will inspect and note compliance of
the architectural details (trim materials, window type, etc.) to verify that the project has
been build according to the approved Planning and Building plans.
EXHIBIT'A"