HomeMy WebLinkAboutReso - PC - 2020.11.23 - 10ADocuSign Envelope lD: DEA78943-19924629-840A-BECD93E45D97
RECORDING REQUESTED BY:
Planning Department
City of Burlingame
WHEN RECORDED MAIL TO:
COMMUNITY DEVELOPMENT DEPARTMENT
CITY OF BURLINGAME
501 PRIMROSE ROAD
BURLINGAME, CA 94010
2021_167909
12:3i pm 12tOAt21 Rl Fee: NO FEE
Count of pages 4
Recorded in Official Records
County of San Mateo
Mark Church
xtl1r ilfl tfiiili,riruflffiiltllryfl tiltiiltiltry ilfl
4{Resolution No. 2020-1 1 .23-1Oa
29 HUMBOLDT ROAD
029-305-070
TITLE OF DOGUMENT
I hereby certify this to be a full, true and correct copy ofthe
document it purports to be, the original of which is on file in my
office.
October 2021
k*'ru
A
brr{l}dE
Date:
Kevin Gardiner, AICP, Community Development
RESOLUTION APPROVING CATEGORICAL EXEMPTTON AND DESTGN REVIEW
RESOLVED, by the Planning Commission of the City of Burlingame that:
WHEREAS, a Categorical Exemption has been prepared and application has been made for Desiqn
Review for a new. two-storv sinole familv dwellinq and a detached qaraqe at 29 Humboldt Road. Zoned
R-1, Ariun Dutt and Ritu Vohra. propertv owners. APN: 029-305-070;
WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on
November 23. 2020, at which time it reviewed and considered the staff report and all other written
materials and testimony presented at said hearing;
NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that:
1. On the basis of the lnitial Study and the documents submitted and reviewed, and comments
received and addressed by this Commission, it is hereby found that there is no substantial evidence
that the project set forth above will have a significant effect on the environment, and categorical
exemption, per CEQA Section 15303 (a) of the CEQA Guidelines, which states that
construction of a limited number of new, small facilities or structures including one single family
residence or a second dwelling unit in a residential zone is exempt from environmental review
is hereby approved.
2. Said Design Review is approved subject to the conditions set forth in Exhibit "A" attached
hereto. Findings for such Design Review are set forth in the staff report, minutes, and recording
of said meeting.
3. lt is further directed that a certified copy of this resolution be recorded in the official records of
the County of San Mateo
irman
f,,scl+Mtb Secretary of the Planning Commission of City of Burlingame, do
hereby certify that the foregoing resolution was introduced and adopted at a regular meeting of the
Planning Commission held on the 23rd dav of November. 2020 by the following vote:
29 HUMBOLDT RD - RESO 2020-11.23-10aAYES: COIIAROTO, GAUL,
SCHUID, TERRONES, TSEIIIOES: LOFTIS
ABSENT SARGENT
RECUSED: NONE
r
t,
1
EXHIBIT "A"
Conditions of Approval for Categorical Exemption and Design Review
29 Humboldt Road
Effective December 3, 2020
Page 1
that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single
termination and installed on the portions of the roof not visible from the street; and that these
venting details shall be included and approved in the construction plans before a Building permit
is issued;
that the project shall be built as shown on the plans submitted to the Planning Division date
stamped November 9, 2020, sheets A-0 through A-9;
that prior to issuance of a building permit, the applicant shall submit an Fyl which includes
reducing the size of the stairwell window along the left side of the house;
that any changes to building materials, exterior finishes, windows, architectural features, roof
height or pitch, and amount or type of hardscape materials shall be subject to Planning Division
or Planning Commission review (FYl or amendment to be determined by planning staff);
that any changes to the size or envelope of the basement, first or second floors, or garage,
which would include adding or enlarging a dormer(s), shall require an amendment to ttris permit;
that any recycling containers, debris boxes or dumpsters for the construction project shall be
placed upon the private property, if feasible, as determined by the Community Development
Director;
that demolition for removal of the existing structures and any grading or earth moving on the site
shall not occur until a building permit has been issued and such site work shall be required to
comply with all the regulations of the Bay Area Air Quality Management District;
that prior to issuance of a building permit for construction of the p@ect, the project construction
plans shall be modified to include a cover sheet listing all conditions of approval adopted by the
Planning commission, or city council on appeal; which shall remain a part of all sets of
approved plans throughout the construction process. Compliance with all conditions of approval
is required; the conditions of approval shall not be modified or changed without the approval of
the Planning Commission, or City Council on appeal;
4
E
6
7
J
8
o that the project shall comply with the Construction and Demolition Debris Recycling Ordinance
which requires affected demolition, new construction and alteration projects to submit a Waste
Reduction plan and meet recycling requirements; any partial or full demolition of a structure,
interior or enerior, shall require a demolition permit;
10. that the project shall meet all the requirements of the California Building and Uniform Fire
codes, in effect at time of building permit submittal, as amended by the city of Burlingame;
THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION
PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION:
Conditions of Approval for Categorical Exemption and Design Review
29 Humboldt Road
Effective December 3, 2020
Page 2
11
12.
13
14
15
that prior to scheduling the framing inspection the applicant shall provide a certification by the
project architect or residential designer, or another architecl or residential design professional,
that demonstrates that the project falls at or below the maximum approved floor area ratio for
the property;
that prior to scheduling the foundation inspection, a licensed suryeyor shall locate the property
corners, set the building footprint and certify the first floor elevation of the new shucture(s)
based on the elevation at the top of the form boards per the approved plans; this survey shall be
accepted by the City Engineer;
that.prior to scheduling the framing inspection the project architect or residential designer, or
another architect or residential design professional, shall provide an architectural certification
that the architectural details shown in the approved design which should be evident at framing,
such as window locations and bays, are built as shown on the approved plans; architectural
certification documenting framing compliance with approved design shall be submitted to the
Building Division before the final framing inspection shall be scheduled;
that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of
the roof ridge and provide certification of that height to the Building Division; and
that prior to final inspection, Planning Division staff will inspect and note compliance of the
architectural details (trim materials, window type, etc.) to verify that the project has been built
according to the approved Planning and Building plans.
EXHIBIT "A"