HomeMy WebLinkAboutReso - PC - 2020.10.13 - 8BEocuSign Lnvelq.4 lD: ADE44F56-D548-4529-B6EE-6622ED8A1 682
RECORDING REQUESTED BY:
Planning Department
City of Burlingame
WHEN RECORDED MAIL TO:
COMMUNITY DEVELOPMENT DEPARTMENT
CITY OF BURLINGAME
501 PRIMROSE ROAD
BURLINGAME, CA 94010
2021-167904
12:35 pm 12t00t21 Rl Fee: NO FEE
Count of pages 4
Recorded in Official Records
CountyofSan Mateo
Mark Church
t1l riu4liiljfuinttr1 ilu1 ilfl f ififf li[ilU rUuUn
Resolution No. 2020-10. 1 3-8b
3 CANANEA PLACE
027-047-010
TITLE OF DOGUMENT
I hereby certify this to be a full, true and correct copy of the
document it purports to be, the original of which is on file in my
office.
October 2021
kxirn" hrh,ru
b\,UNE
Date:
Kevin Gardiner, AICP, Community
{
RESOLUTION APPROVING CATEGORICAL EXEMPTION, DESIGN REVIEW,
AND HILLSIDE AREA CONSTRUCTION PERMIT
RESOLVED, by the Planning Commission of the City of Burlingame that:
WHEREAS, a Categorical Exemption has been prepared and application has been made for Desiqn
Review and Hillside Area Construction Permit for a new deck and addition on the main level alonq tfie
left side and rear of an existinq sinqle familv dwelling at 3 Cananea Place, Zoned R-1. yan panct.
propertv owner, APN: 027-047-010;
WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on October
13, 2020, at which time it reviewed and considered the staff report and all other written materials and
testimony presented at said hearing;
NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that:
1. On the basis of the lnitial Study and the documents submitted and reviewed, and comments
received and addressed by this Commission, it is hereby found that there is no substantial evidence
that the project set forth above will have a significant effect on the environment, and categorical
exemption, per CEQA Section 15301 (eX1) of the CEQA Guidelines, which states that additions
to existing structures are exempt from environmental review, provided the addition will not result
in an increase of more than 50% of the floor area of the structures before the addition, is hereby
approved.
2. Said Design Review and Hillside Area Construction Permit are approved subject to the
conditions set forth in Exhibit "A" attached hereto. Findings for such Design Review and Hillside
Area Construction Permit are set forth in the staff report, minutes, and recording of said
meeting.
3. lt is further directed that a certified copy of
the County of San Mateo.
hereby certify that the foregoing resoluti
Planning Commission held on the
resolutio the official records of
on was introduced and adopted at a regular meeting of the
13th dav of October. 2020 by the following vote:
Cha
M\.6AtJt,,Secretary of the Planning Commission of the City of Burlingame, do
3 GANANEA PL - RESO 2O2O-10.13.8bAYES: GAUI- LOffiS
SARGEilT, SCHMIDNOES: NONE
ABSENT COMAROTO,TERRONES,TSE
RECUSED: NONE
EXHIBIT "4"
Conditions of Approval for Categorical Exemption, Design Review, and Hillside Area Construction Permit
3 Cananea Place
Effective October 23, 2020
Page 1
that the proiect shall be built as shown on the plans submitted to the Planning Division date
stamped September 29, 2020, sheets A1.0 through A5.4 and L-1;
that prior to issuance of a building permit, the applicant shall submit an FYI to include a
landscape plan for the project which shows an evergreen privacy hedge to be planted along
the left side property between the subject property and 1 Cananea Place;
that any changes to building materials, exterior finishes, windows, architectural features, roof
height or pitch, and amount or type of hardscape materials shall be subject to Planning
Division or Planning Commission review (FYl or amendment to be determined by planning
staff);
that any changes to the size or envelope of the first or second floors, or garage which would
include adding or enlarging a dormer (s), shall require an amendment to this permit;
that any recycling containers, debris boxes or dumpsters for the construction project shall be
placed upon the private property, if feasible, as determined by the Community Development
Director; that demolition or removal of the existing structures and any grading or earth moving
on the site shall not occur until a building permit has been issued and such site work shall be
required to comply with all the regulations of the Bay Area Air Quality Management District;
that prior to issuance of a building permit for construction of the project, the project
construction plans shall be modified to include a cover sheet listing all conditions of approval
adopted by the Planning Commission, or City Council on appeal; which shall remain a part of
all sets of approved plans throughout the construction process. Compliance with all
conditions of approval is required; the conditions of approval shall not be modified or changed
without the approval of the Planning Commission, or City Council on appeal;
that all air ducts, plumbing vents, and flies shall be combined, where possible, to a single
termination and installed on the portions of the roof not visible from the street; and that these
venting details shall be included and approved in the construction plans before a Building
permit is issued;
that the project shall comply with the construction and Demolition Debris Recycling
Ordinance which requires affected demolition, new construction and alteration projects to
submit a Waste Reduction plan and meet recycling requirements; any partial or full demolition
of a structure, interior or exterior, shall require a demolition permit;
that the project shall meet all the requirements of the California Building and Uniform Fire
Codes, in effect at time of building permit submittal, as amended by the City of Burlingame;
1
2
2
4
E
b
7
I
o
EXHIBIT "A"
Conditions ofApprovalfor Categorical Exemption, Design Review, and Hillside Area Construction permit
3 Cananea Place
Effective October 23, 2020
Page 2
THE FOLLOWNG CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION
PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION:
10. that prior to scheduling the framing inspection the applicant shall provide a certification by the
project architect or residential designer, or another architect or residential design
professional, that demonstrates that the project falls at or below the maximum approved floor
area ratio for the property;
11
12
13
prior to scheduling the framing inspection the project architect or residential designer, or
another architect or residential design professional, shall provide an architectural certification
that the architectural certification that the architectural details shown in the approved design
which should be evident at framing, such as window locations and bays, are built as shown
on the approved plans; architectural certification documenting framing compljance with
approved design shall be submitted to the Building Divasion before the final framing
inspection shall be scheduled;
that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of
the roof ridge and provide certification of that height to the Building Division; and
that prior to final inspection, Planning Division staff will inspect and note compliance of the
architectural details (trim materials, windowtype, etc.) to verify that the project has been build
according to the approved Planning and Building plans.