HomeMy WebLinkAboutReso - PC - 2020.10.13 - 8ADocuSign Envelope lD: DEA78943-i S92a62d-B 0A-BECD93E4SD97
COMMUNITY DEVELOPMENT DEPARTMENT
CITY OF BURLINGAME
501 PRIMROSE ROAD
BURLINGAME, CA 94010
2021_167777
10:30 am 1?l}gt21 Rl Fee: NO FEE
Count of pagee 4
Recorded in Officlal Records
County of San Mateo
Mark Church
[rilt1 ilflfiiir[ifl
itmfliq filfi qlfi iltililqll1r ilr1l
Resolution No. 2020-10. 1 3-8a
1OO COSTA RICA AVENUE
028-293-190
TITLE OF DOCUMENT
I hereby certify this to be a full, true and correct copy of the
document it purports to be, the original of which is on file in my
office.
October 25,2021
turrn" htkwy
orrUNS
Date:
Kevin Gardiner, AICP, Community Development Director
RECORDING REQUESTED BY:
Planning Department
City of Burlingame
WHEN RECORDED MAIL TO:
+(
RESOLUTION APPROVING CATEGORICAL EXEMPTION, DESIGN REVIEW
AND CONDITIONAL PERMITS,
RESOLVED, by the Planning Commission of the City of Burlingame that:
WHEREAS, a Categorical Exemption has been prepared and applicati on has been made for Desiqn
Review for and second sto addition n onal Use Permi detached atI
100 Costa Rica Aven . Zoned R-1 . Kristine Furrer. oroDertv . APN: 028-293-190:
WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on October
13.2020, at which time it reviewed and considered the staff report and all other written materials and
testimony presented at said hearing;
NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that:
1- On the basis of the lnitial Study and the documents submitted and reviewed, and comments
received and addressed by this Commission, it is hereby found that there is no substantial evidence
that the project set forth above will have a significant effect on the environment, and categorical
exemption, per CEQA Section 1530'l (e)(1) of the CEQA Guidelines, which states that additions
to existing structures are exempt from environmental review, provided the addition will not result
in an increase of more than 50% of the floor area of the structures before the addition, is hereby
approved.
2. Said Design Review and Conditional Use Permits are approved subject to the conditions set
forth in Exhibit "A" attached hereto- Findings for such Design Review and Conditional Use
Permits are set forth in the staff report, minutes, and recording of said meeting.
3. lt is further directed that a
the County of San Mateo.
certified copy of thi resolution be record the official records of
Chairpe
t,t , Secretary of the Planning Commission of the City of
Burlingame, do hereby certify that the foregoing resolution was introduced and adopted at a regular
meeting of the Planning Commission held on the 13th dav of October. 2020 by the following vote:
i00 cosTA RrcA - REso 2020-r0.134aAYES: GAUL LOmS
SARGENI SCH IDNOES: NOI{E
ABSENT COiIAROTO, TERROI{ES, TSE
RECUSED: NONE
Secretary
EXHIBIT "A"
conditions of Approval for categorical Exemption, Design Review, and conditional Use permits
100 Costa Rica Avenue
Effective October23, 2020
Page 1
1 that the project shall be built as shown on the plans submitted to the Planning Division date
stamped September 2'1, 2020, sheets A1.0 through A.5.1 and L1;
that prior to issuance of a building permit, the applicant shall submit an Fyl noting on the
plans that the project will include simulated true divided lite windows; the Fyl shall also
include a sample or photographs of the proposed concrete tile roofing material and an
address of a house in Burlingame where the proposed concrete tile roofing has been
installed;
2
J
4
(
I
that any changes to building materials, exterior finishes, windows, architectural features, roof
height or pitch, and amount or type of hardscape materials shall be subject to planning
Division or Planning Commission review (FYl or amendment to be determaned by planning
staff);
that any changes to the size or envelope of the first or second floors, or garage which would
include adding or enlarging a dormer (s), shall require an amendment to this permit;
that any recycling containers, debris boxes or dumpsters for the construction project shall be
placed upon the private property, if feasible, as determined by the Community Development
Director; that demolition or removal of the existing structures and any grading or earth moving
on the site shall not occur until a building permit has been issued and such site work shall be
required to comply with all the regulations of the Bay Area Air Quality Management District;
that prior to issuance of a building permit for construction of the project, the project
construction plans shall be modified to include a cover sheet listing all conditions of approval
adopted by the Planning Commission, or City Council on appeal; which shall remain a part ofall sets of approved plans throughout the construction process. Compliance with all
conditions of approval is required; the conditions of approval shall not be modified or changed
without the approval of the Planning Commission, or City Council on appeal;
that all air ducts, plumbing vents, and flies shall be combined, where possible, to a single
termination and installed on the portions of the roof not visible from the street; and that these
venting details shall be included and approved in the construction plans before a Building
permit is issued;
that the project shall comply with the construction and Demolition Debris Recycling
ordinance which requires affected demolition, new construction and alteration projects to
submit a waste Reduction plan and meet recycling requirements; any partial or full demolition
of a structure, interior or exterior, shall require a demolition permit;
that demolition for removal of the existing structures and any grading or earth moving on the
site shall not occur until a building permit has been issued and such site work shall be
required to comply with all the regulations of the Bay Area Air euality Management District;
that the project shall meet all the requirements of the California Building and Uniform Fire
Codes, in effect at time of building permit submittal, as amended by the City of Burlingame;
10
b.
7.
EXHIBIT "A"
conditions of Approval for categorical Exemption, Design Review, and conditional Use permits
100 Costa Rica Avenue
Effective October23, 2020
THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION
PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION:
10. that prior lo scheduling the framing inspection the applicant shall provide a certification by theproject architect or residential designer, or another architect or residential design
professional, that demonstrates that the project falls at or below the maximum approved flobr
area ratio for the property;
11
12
13.
14
that prior to scheduling the foundation inspection, a licensed surveyor shall locate the
property corners, set the building footprint and certify the first floor elevation of the new
structure(s) based on the elevation at the top of the form boards per the approved plans; this
survey shall be accepted by the City Engineer;
prior to scheduling the framing inspection the project architect or residential designer, or
another architect or residential design professional, shall provide an architectural certification
that the architectural certification that the architectural details shown in the approved design
which should be evident at framing, such as window locations and bays, are built as shown
on the approved plans; architectural certification documenting framing compliance with
approved design shall be submitted to the Building Division before the final framing
inspection shall be scheduled;
that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of
the roof ridge and provide certification of that height to the Building Division; and
that prior to final inspection, Planning Division staff will inspect and note compliance of the
architectural details (trim materials, window type, etc.) to verify that the project has been build
according to the approved Planning and Building plans.