HomeMy WebLinkAboutReso - PC - 2020.09.14 - 8B:
DocuSig n Envelope I D : DEA78943- 1 9924629-840A-8 EC D93 E45D97
RECORDING REQUESTED BY:
Planning Department
City of Burlingame
WHEN RECORDED MAIL TO
COMMUNITY DEVELOPMENT DEPARTMENT
CITY OF BURLINGAME
501 PRIMROSE ROAD
BURLINGAME, CA 94010
2021-167906
12:35 Pm 'l2l0Bl2'l R1 Fee: NO FEE
Count of Pages 4
Recorded in Official Records
CountY of San Mateo
Mark Church
r1lr
1
rfiifulffiuqxfimt1nilififllfllq1 tttlr
Resolution No. 2020-09.1 4-8b
624 LEXINGTON WAY
029-181-170
TITLE OF DOCUMENT
I hereby certify this to be a full, true and correct copy of the
document it purports to be, the original of wtrich is on file in my
office.
October 25 2021
&rxiw hrkrot
aFt'
.!i
i: f#u*l:"
{
.t
Date:
Kevin Gardiner, AICP, Community
f P:t'&;;, .,..i;,.
RESOLUTION APPROVING CATEGORICAL EXEMPTION
AND AMENDMENT TO DESIGN REVIEW
RESOLVED, by the Planning Commission of the City of Burlingame that:
WHEREAS, a Categorical Exemption has been prepared and application has been made for
Amendment to Desiqn Review for chanqes to a previouslv approved maior renovation for a first and
second storv addition to a single familv dwellino at 624 Lexinoton Wav, zoned R-1. Dave and Kelsev
Armstronq, propertv owners, APN: 029-1 81 -1 70;
WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on
September 14, 2020, at which time it reviewed and considered the staff report and all other written
materials and testimony presented at said hearing;
NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that:
1. On the basis of the lnitial Study and the documents submitted and reviewed, and comments
received and addressed by this Commission, it is hereby found that there is no substantial evidence
that the project set forth above will have a significant effect on the environment, and categorical
exemption, per Section 15301 (eX2), which states that additions to existing structures are
exempt from environmental review, provided the addition will not result in an increase of more
than 10,000 SF in areas where all public services and facilities are available and the area in
which the project is located is not environmentally sensitive, is hereby approved.
2. Said Amendment to Design Review is approved subject to the conditions set forth in Exhibit "A"
attached hereto. Findings for such Design Review is set forth in the staff report, minutes, and
recording of said meeting.
3. It is further directed that a certified copy of this resolution be recorded in the official records of
the County of San Mateo.
irperson
t,Secretary of the Planning Commission of the City of Burlingame, do
hereby certify that the foregoing resolution was introduced and adopted at a regular meeting of the
Planning Commission held on the 14th dav of September. 2020 by the following vote:
624 LEXTNGTON WY - RESO 2020{0-14{b
AYES: COIIAROTO, GAUL' LOffiS
SARGENT, SGHTID, TERRONES' TSE
NOES: NONE
ABSENT NONE
RECUSED: NONE
r.5Cr${rb:,
EXHIBIT "A"
Conditions of Approval for Amendment to Design Review
624 Lexington Way
Effective September 24, 2020
Page I
1 that the project shall be built as shown on the plans submitted to the Planning Division date
stamped November 21 , 20'17 , sheets A0. 1 through A9.0 (except sheets A3.0 to A3.3) and Ll .1 ,
and revised sheet A0.0 date stamped December 22,2017 and revised sheets A3.0 to A3.3 date
stamped Ju\y24,2020;
4
q
A
7
2
J
I
that prior to issuance of a final inspection, the applicant shall submit an FYI showing the window
shutters on the sides and rear of the house to be retained, and the brick cladding at the base of
the house be changed to a ledger brick and be continued along the sides of the house to a point
beyond the fence line;
that any changes to building materials, exterior finishes, windows, architectural features, roof
height or pitch, and amount or type of hardscape materials shall be subject to Planning Division
or Planning Commission review (FYl or amendment to be determined by Planning staff);
that any changes to the size or envelope of the first or second floors, or garage, which would
include adding or enlarging a dormer(s), shall require an amendment to this permit;
that any recycling containers, debris boxes or dumpsters for the construction project shall be
placed upon the private property, if feasible, as determined by the Community Development
Director;
that demolition or removal of the existing structures and any grading or earth moving on the site
shall not occur until a building permit has been issued and such site work shall be required to
comply with all the regulations of the Bay Area Air Quality Management District;
that prior to issuance of a building permit for construction of the project, the project construction
plans shall be modified to include a cover sheet listing all conditions of approval adopted by the
Planning Commission, or City Council on appeal; which shall remain a part of all sets of
approved plans throughout the construction process. Compliance with all conditions of approval
is required; the conditions of approval shall not be modified or changed without the approval of
the Planning Commission, or City Council on appeal;
that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single
termination and installed on the portions of the roof not visible from the street; and that these
venting details shall be included and approved in the construction plans before a Building permit
is issued;
that the project shall comply with the Construction and Demolition Debris Recycling Ordinance
which requires affected demolition, new construction and alteration projects to submit a Waste
Reduction plan and meet recycling requirements; any partial or full demolition of a structure,
interior or exterior, shall require a demolition permit;
that the p@ect shall meet all the requirements of the California Building and Uniform Fire Codes,
in effect at the time of building permit submittal, as amended by the City of Burlingame;
10
EXHIBIT "A"
Conditions of Approval for Amendment to Design Review
624 Lexington Way
Effective September 24, 2020
Page 2
THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION PROCESS
PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION:
11. that prior to scheduling the framing inspection the applicant shall provide a certification by the
project architect or residential designer, or another architect or residential design professional,
that demonstrates that the project falls at or below the maximum approved floor area ratio for the
property;
12 prior to scheduling the framing inspection the project architect or residential designer, or another
architect or residential design professional, shall provide an architectural certification that the
architectural details shown in the approved design which should be evident at framing, such as
window locations and bays, are built as shown on the approved plans; architectural certification
documenting framing compliance with approved design shall be submitted to the Building
Division before the final framing inspection shall be scheduled;
that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of the
roof ridge and provide certification of that height to the Building Division; and
14 that prior to final inspection, Planning Division staff will inspect and note compliance of the
architectural details (trim materials, window type, etc.) to verify that the proiect has been built
according to the approved Planning and Building plans.
'13