HomeMy WebLinkAboutReso - PC - 2020.08.10 - 8BDocuSign Envetope lD: 0EA78943-1 9924629-840A-BECD93E45D97
RECORDING REQUESTED BY:
Planning Department
City of Burlingame
WHEN RECORDED MAIL TO:
COMMUNITY DEVELOPMENT DEPARTMENT
CITY OF BURLINGAME
501 PRIMROSE ROAD
BURLINGAME, CA 94010
2021-167902
12:35 pm 12lOAl21 R1 Fee: NO FEE
Count of Pages 4
Recorded in Official Records
County of San Mateo
Mark Church
r nu r r illfrm"lflfiilililiiifiilifi miliifi ifiil]ffIil il lI ll*$R0003184494$*
{rResolution No. 2020-08.1 0-8b
1345 BALBOA AVENUE
026-022-040
TITLE OF DOCUMENT
I hereby certify this to be a full, true and conect copy of the
document it purports to be, the original of which is on file in my
office.
October 25 2021
lrr,rrtn,
A
brrUHE
Date:
Kevin Gardiner, AICP, Community Development
RESOLUTION APPROVING CATEGORICAL EXEMPTION AND DESIGN REVIEW AMENDMENT
RESOLVED, by the Planning Commission of the City of Burlingame that:
WHEREAS, a Categorical Exemption has been prepared and application has been made for Desiqn
Review Amendment for as-built chanoes to a previouslv approved Desiqn Review application for a
maior renovation and first and second storv addition to an existing sinqle familv dwelling at 1345 Balboa
Avenue, zoned R-1. Ada, & Denise Steinberqer. propertv owners, APN: 026-022-040;
WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on Auqust
10, 2020, at which time it reviewed and considered the staff report and all other written materials and
testimony presented at said hearing;
NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that:
1. On the basis of the lnitial Study and the documents submitted and reviewed, and comments
received and addressed by this Commission, it is hereby found that there is no substantial evidence
that the project set forth above will have a significant effect on the environment, and categorical
exemption, per Section 15301 (eX1) of the CEQA Guidelines, which states that additions to
existing structures are exempt from environmental review, provided the addition will not result in
an increase of more than 50% of the floor area of the structures before the addition, is hereby
approved.
2. Said Design Review Amendment is approved subject to the conditions set forth in Exhibit "A"
attached hereto. Findings for such Design Review is set forth in the staff report, minutes, and
recording of said meeting.
3. lt is further directed that a certified copy of this resolution be recorded in the official records of
the County of San Mateo.
irman
T.S0.t"lM tu Secretary of the Planning Commission the City of Burlingame, do
hereby certify that the foregoing resolution was introduced and adopted at a regular meeting of the
Planning Commission held on the 1Oth dav of Auqust. 2020 by the following vote:
134L€ALBO4AVE - RESO 2o2o{r8.1cSbAYES: COilAROTO, GAUI-----
SARGEIT, SCHTID, TERRONES, TSENOES: NONE
ABSENT LOFT|S
REGUSED: NONE
Secretary
1
EXHIBIT "A"
Conditions of Approval for Categorical Exemption and Design Review Amendment
1345 Balboa Avenue
Effective August 20, 2020
Page '1
that the project shall be built as shown on the plans submitted to the Planning Division date
stamped July 15,2020, sheets A3.0 through A3.4 and plans date stamped January 12,201g,
sheets A0.0 through Xl.0;
that storage area 3 to the left of the media room, as shown on sheet A2.0, shall not be utilized as
living space and shall be bacKilled with drain rock and covered with at least one foot of concrete
with a final height limit of not more than 6-feet (5'-6" per plan);
that any changes to building materlals, exterior finishes, windows, architectural features, roof
height or pitch, and amount or type of hardscape materials shall be subject to Planning Division
or Planning Commission review (FYl or amendment to be determined by Planning staff);
that any changes to the size or envelope of the first or second floors, or garage, which would
include adding or enlarging a dormer(s), shall require an amendment to this permit;
that the conditions of the Building Division's April 26, 2016 and March 24,2016 memos, the
Parks Division's March 29,2016 memo, the Fire Division's March 28, 2016 memo and the
Stormwater Division's March 29, 2016 memo shall be met;
that any recycling containers, debris boxes or dumpsters for the construction project shall be
placed upon the private property, if feasible, as determined by the Community Development
Director;
that demolition or removal of the existing slructures and any grading or earth moving on the site
shall not occur until a building permit has been issued and such site work shall be required to
comply with all the regulations of the Bay Area Air Quality Management District;
that prior to issuance of a building permit for construction of the project, the project construction
plans shall be modified to include a cover sheet listing all conditions of approval adopted by the
Planning commission, or city council on appeal; which shall remain a part of all sets of
approved plans throughout the construction process. Compliance with all conditions of approval
is required; the conditions of approval shall not be modified or changed without the approval of
the Planning Commission, or City Council on appeal;
that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single
termination and installed on the portions of the roof not visible from the street; and that thele
venting details shall be included and approved in the construction plans before a Building permit
is issued;
10.that the project shall comply with the Construction and Demolition Debris Recycling Ordinance
which requires affected demolition, new construction and alteration projects to submit a Waste
Reduction plan and meet recycling requirements; any partial or full demolition of a structure,
interior or exterior, shall require a demolition permit;
that the project shall meet all the requirements of the California Building and Uniform Fire Codes,
2013 Edition, as amended by the City of Burlingame;
J
4
A
b
7
o
11
9
EXHIBIT "A"
Conditions of Approval for Categorical Exemption and Design Review Amendment
1345 Balboa Avenue
Effective August 20, 2020
THE FOLLOWNG CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION PROCESS
PRIOR TO THE INSPECTIONS NOTED IN EACH GONDITION:
12. that prior to scheduling the framing inspection the applicant shall provide a certification by the
project architect or residential designer, or another architect or residential design professional,
that demonstrates that the project falls at or below the maximum approved floor area ratio for the
property;
13
14.
15.
prior to scheduling the framing inspection the project architect or residential designer, or another
architect or residential design professional, shall provide an architectural certification that the
architectural details shown in the approved design which should be evident at framing, such as
window locations and bays, are built as shown on the approved plans; architectural certification
documenting framing compliance with approved design shall be submitted to the Building
Division before the final framing inspection shall be scheduled;
that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of the
roof ridge and provide certification of that height to the Building Division; and
that prior to final inspection, Planning Division staff will inspect and note compliance of the
architectural details (trim materials, window type, etc.) to verify that the project has been built
according to the approved Planning and Building plans.