HomeMy WebLinkAboutReso - PC - 2020.08.10 - 7ADocuSign Envelope iD: DEA78943-1 992-4629-840A-BECD93E45D97
RECORDING REQUESTED BY:
Planning Department
City of Burlingame
WHEN RECORDED MAIL TO:
COMMUNITY DEVELOPMENT DEPARTMENT
CITY OF BURLINGAME
501 PRIMROSE ROAD
BURLINGAME, CA 94010
2021-167809
10:37 am 12l0Bl2'l Rl Fee: NO FEE
Count of Pages 4
Recorded in Official Records
County of San Mateo
Mark Church
Assessor-County Clerk-Recorder
I ll]t I Iil!ilt ilt lilt ilillilt ilillilt ilil ]]t tillililt ilt I I ilt ll]*$R0003'1 84469 g*
Resolution No. 2020-08.10-7 a
1 O BANCROFT ROAD
029-304-180
TITLE OF DOCUMENT
I hereby certify this to be a full, true and correct copy of the
document it purports to be, the original of which is on file in my
office.
October 2021
&rrrit," ht/,iw.r
€ynLlffry$F4E
JUHE
Date:
Kevin Gardiner, AICP, Community Development
+{
RESOLUTION APPROVING CATEGORICAL EXEMPTION, DESIGN REVIEW, SPECIAL PERMIT,
AND HILLSIDE AREA CONSTRUCTION PERMIT
RESOLVED, by the Planning Commission of the City of Burlingame that:
WHEREAS, a Categorical Exemptio n has been prepared and application has been made for Desiqn
Review for new two-st si mt tn at 10 Ban croft Road. Zo ned R-1 Gti P tes LLC
orooertv owner.APN: 029-304-180
WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on Auoust
10.2020, at which time it reviewed and considered the staff report and all other written materials ind
testimony presented at said hearing;
NOW, THEREFORE, it is RESOLVED and DETERMTNED by this ptanning Commission that:
2. Said Design Review is approved subject to the conditions set forth in Exhibit "A" attached
hereto. Findings for such Design Review, Special Permit, and Hillside Area Construction Permit
are set forth in the staff report, minutes, and recording of said meeting.
3. lt is further directed that a certified copy of this resolution be recorded in the official records of
the County of San Mateo
hairperson
t. Sttlrt'dlb , Secretary of the Planning Commission of the City of Burlingame, dot,
hereby
Plannin
certify that the foregoig Commission held
ng resolution was introduced and adopted at aon the 10th dav of Auous 2020 by
regular meeting of the
the following vote:
10 BAI{CROFT RD - RESO 202H18-1G7aAYES: COIAROTO, GAUL
SARGE]iT, SCHl,lo, TERROI{ES, TSENOES: NONE
ABSENT LOFTIS
RECUSED: NONE
Secret
1. On the basis of the Initial Study and the documents submitted and reviewed, and comments
received and addressed by this Commission, it is hereby found that there is no substantial evidence
that the project set forth above will have a significant effect on the environment, and categorical
exemption, per CEQA Section 15303 (a), which states that construction of a limited number of
new, small facilities or structures including one single family residence or a second dwelling unit
in a residential zone is exempt from environmental review. ln urbanized areas, up to three
single-family residences may be constructed or converted under this exception, is hereby
approved.
EXHIBIT "A"
Conditions ofApprovalfor Categorical Exemption & Design Review
10 Bancrott Road
Effective August 20, 2020
Page 1
2.
that the project shall be built as shown on the plans submitted to the planning Division date
stamped June 30, 2020, sheets A.1 through A.6, N.1, L.'1 and site survey;
that any changes to building materials, exterior finishes, windows, architectural features, roof
height or pitch, and amount or type of hardscape materials shall be subject to ptanning
Division or Planning Commission review (FYl or amendment to be determined by planning
stafo;
that any changes to the size or envelope of the first or second floors, or garage which would
include adding or enlarging a dormer (s), shall require an amendment to this permit;
3
4
5.
that any recycling containers, debris boxes or dumpsters for the construction project shall be
placed upon the private property, if feasible, as determined by the Community Development
Director; that demolition or removal ofthe existing structures and any grading or earth moving
on the site shall not occur until a building permit has been issued and such site work sha be
required to comply with all the regulations of the Bay Area Air Quality Management District;
that prior to issuance of a building permit for construction of the project, the project
construction plans shall be modified to include a cover sheet listing all conditions of approval
adopted by the Planning Commission, or City Council on appeal; which shall remain a part ofall sets of approved plans throughout the construction process. Compliance with all
conditions of approval is required; the conditions of approvat shall not be modified or changed
without the approval of the Planning Commission, or City Council on appeal;
7
that all air ducts, plumbing vents, and flies shall be combined, where possible, to a single
termination and installed on the portions of the roof not visibte from the street; and that these
venting details shall be included and approved in the construction ptans before a Building
permit is issued;
that the project shall comply with the Construction and Demolition Debris Recycling
Ordinance which requires affected demolition, new construction and alteration projects to
submit a Waste Reduction plan and meet recycling requirements; any partial or full demotition
of a structure, interior or exterior, shall require a demolition permit;
that demolition for removal of the existing structures and any grading or earth moving on the
site shall not occur until a building permit has been issued and such site work ahall be
requjred to comply wjth all the regulations ofthe Bay Area Air Quality Management District;
that the project shall meet all the requirements of the California Building and Uniform Fire
Codes, in effect at time of building permit submittal, as amended by the City of Budingame;
8.
9
THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION
PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION:
12. that prior to scheduling the framing inspection the applicant shall provide a certjfication by the
project architect or residential designer, or another architect or residential design
6.
EXHIBIT "A"
Conditions of Approval for Categorical Exemption & Design Review
10 Bancroft Road
Effective August 20, 2020
Page 2
professional, that demonstrates that the project falls at or below the maximum approved floor
area ratlo for the property;
13
14.
15.
16
that prior to scheduling the foundation inspection, a licensed surveyor shall locate the
property corners, set the building footprint and certify the first floor elevation of the new
structure(s) based on the elevation at the top of the form boards per the approved plans; this
survey shall be accepted by the City Engineer;
prior to scheduling the framing inspection the project architect or residential designer, or
another architect or residential design professional, shall provide an architectural certification
that the architectural certification that the architectural details shown in the approved design
which should be evident at framing, such as window locations and bays, are built as shown
on the approved plans; architectural certification documenting framing compliance with
approved design shall be submitted to the Building Division before the final framing
inspection shall be scheduled;
that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of
the roof ridge and provide certification of that height to the Building Division; and
that prior to final inspection, Planning Division staff will inspect and note compliance of the
architectural details (trim materials, window type, etc.) to verify that the project has been build
according to the approved Planning and Building plans.