Resolution No. 2020-05.26-8a
818 ACACIA DRIVE
029-016-190 +r
TITLE OF DOCUMENT
I hereby certify this to be a full, true and correct copy of the
document it purports to be, the original of which is on file in my
office.
October 25 2021
&r*'tn" earhn*
@rrUNE
'a:
Date:
Kevin Gardiner, AICP, Community Development
RESOLUTION APPROVING CATEGORICAL EXEMPTION, DESIGN REVIEW, AND SPECIAL
PERMITS
RESOLVED, by the Planning Commission of the City of Burlingame that:
WHEREAS, a Categorical Exemption has been prepared and application has been made for Desiqn
Review and Special Permits for a new, two-story sinole familv dwellinq with an attached qaraoe and a
direct exit from a basement at 818 Acacia Drive, Zoned R-1. Eric and Karen Jue. propertv owners,
APN: 029-016-190;
WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on Mav 26,
2020, at which time it reviewed and considered the staff report and all other written materials and
testimony presented at said hearing;
NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that:
1. On the basis of the lnitial Study and the documents submitted and reviewed, and comments
received and addressed by this Commission, it is hereby found that there is no substantial evidence
that the project set forth above will have a significant effect on the environment, and categorical
exemption, per CEQA Section 15303 (a), which states that construction of a limited number of
new, small facilities or structures including one single family residence or a second dwelling unit
in a residential zone is exempt from environmental review. ln urbanized areas, up to three
single-family residences may be constructed or converted under this exception, is hereby
approved.
2. Said Design Review and Special Permits are approved subject to the conditions set forth in
Exhibit "A" attached hereto. Findings for such Design Review and Special Permits are set forth
in the staff report, minutes, and recording of said meeting.
3. lt is further directed that a certified copy of this resolution
the County of San Mateo.
in the official records of
Chairman
l, C.SC\fMlb , Secretary of the Planning Commission of the city of Burtingame, do
hereby certify that the foregoing resolution was introduced and adopted at a regular meeting of the
Planning Commission held on the 26th dav of May, 2020 by the following vote:
818 AGAGIA DR - RESO 2020{t5.26{a
AYES: COilAROTO, GAUL, LOFTIS,
SARGENT, SCHTID, TSE
NOES: NONE
ABSET{T TERRONES
REGUSED: NONE
2
EXHIBIT "A"
Conditions ofApproval for Categorical Exemption, Design Review, and Special Permits
818 Acacia Drive
Effective June 5, 2020
Page 1
1.that the project shall be built as shown on the plans submitted to the Planning Division date
stamped May 5, 2020, sheets Al through A6, L'l, and Boundary and Topographjc Survey dated
March 27, 2019
that any changes to building materials, exterior finishes, windows, architectural features, roof
height or pitch, and amount or type of hardscape materials shall be subject to planning Division
or Planning Commission review (FYl or amendment to be determined by ptanning staff);
that any changes to the size or envelope ofthe basement, first or second floors, or garage, which
would include adding or enlarging a dormer(s), shall require an amendment to this permit;
that any recycling containers, debris boxes or dumpsters for the construction project shall be
placed upon the private property, if feasible, as determined by the Community Development
Director;
that demolition for removal of the existing structures and any grading or earth moving on the site
shall not occur until a building permit has been issued and such site work shall be required to
comply with all the regulations of the Bay Area Air Quality Management District;
that prior to issuance of a building permit for construction of the project, the project construction
plans shall be modified to include a cover sheet listing all conditions of approval adopted by the
Planning Commission, or City Council on appeal; which shall remain a part of all sets of
approved plans throughout the construction process. Compliance with all conditions of approval
is required; the conditjons of approval shall not be modifled or changed without the approval of
the Planning Commission, or City Council on appeal;
that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single
termination and installed on the portions of the roof not visible from the street; and that these
venting details shall be included and approved in the construction plans before a Building permit
is issued;
that the project shall comply with the Construction and Demolition Debris Recycling Ordinance
which requires affected demolition, new construction and alteration projects to submit a Waste
Reduction plan and meet recycling requirements; any partial or full demolition of a structure,
interior or exterior, shall require a demolition pemit;
9. that the project shall meet all the requirements of the California Building and Uniform Fire Codes,
in effecl at time of building permit submittal, as amended by the City of Burlingame;
THE FOLLOWNG CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION PROCESS
PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION:
3
4
5
6.
7
10. that prior to scheduling the framing inspection the applicant shall provide a certification by the
project architect or residential designer, or another architect or residential design professional,
that demonstrates that the project falls at or below the maximum approved floor area ratio for the
property;
I
Page 2
11.
EXHIBIT "A"
Conditions of Approval for Categorical Exemption, Design Review, and Special permits
818 Acacia Drive
Effective June 5, 2020
12.
that prior to scheduling the foundation inspection, a licensed surveyor shall locate the property
corners, set the building footprint and certify the first floor elevation of the new structure(s) based
on the elevation at the top of the form boards per the approved plans; this survey shall be
accepted by the City Engineer;
that prior to scheduling the framing inspection the project architect or residential designer, or
another architect or residential design professional, shall provide an architectural certification that
the architectural details shown in the approved design which should be evident at framing, such
as window locations and bays, are built as shown on the approved plans; architectural
certification documenting framing compliance with approved design shall be submitted to the
Building Division before the final framing inspeclion shall be scheduled;
that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of the
roof ridge and provide certification of that height to the Building Division; and
that prior to final inspection, Planning Division staff will inspect and note compliance of the
architectural details (trim materials, window type, etc.) to verify that the project has been built
according to the approved Planning and Building plans.
13.
14