HomeMy WebLinkAboutReso - PC - 2020.05.11 - 8DDocuSign Envetipe tD: DEA78943- 19924629-8404-8ECD93E45D97
RECORDING REQUESTED BY:
Planning Department
City of Burlingame
WHEN RECORDED MAIL TO:
COMMUNITY DEVELOPMENT DEPARTMENT
CITY OF BURLINGAME
501 PRIMROSE ROAD
BURLINGAME, CA 94010
2021-167780
10:30 am 12t}Ol2'l Rl Fee: NO FEE
Count of Pages 4
Recorded in Official Records
CountY of San Mateo
Mark Church
r1lqt iliifijin[riliiiuqxfinfinfn[ilLul U
tttU
Resolution No. 2020-05.1 1 -8d
217 CHANNING ROAD
029-262-090
+(TITLE OF DOCUMENT
I hereby certify this to be a full, true and correct copy ofthe
document it purports to be, the original of which is on file in my
office.
October 2021
lrr^r'ru htkuu
TY
?AIT
a5:&B['
lffi
6JUNE
Date:
Kevin iner, AICP, Communig Development
RESOLUTION APPROVING CATEGORICAL EXEMPTION AND DESIGN REVTEW AMENDMENT
RESOLVED, by the Planning Commission of the City of Burlingame that:
WHEREAS, a Categorical Exemption has been prepared and application has been made for Desion
Review Amendment for a new, two storv sinqle familv dwellinq and detached qaraoe at 217 Channinq
Road. zoned R-1, sorat and sarah Nivooi, propertv owners, ApN: 029-262-090;
WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on Mav 11.
2020, at which time it reviewed and considered the staff report and all other written materials and
testimony presented at said hearing;
NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that:
1. On the basis of the lnitial Study and the documents submitted and reviewed, and comments
received and addressed by this Commission, it is hereby found that there is no substantial evidence
that the project set forth above will have a significant effect on the environment, and categorical
exemption, per CEQA Section 15303 (a) of the CEQA Guidelines, which statei that
construction of a limited number of new, small facilities or structures including one single family
residence or a second dwelling unit in a residential zone is exempt from environmental review,
is hereby approved.
2. Said Design Review Amendment is approved subject to the conditions set forth in Exhibit "A"
attached hereto. Findings for such Design Review is set forth in the staff report, minutes, and
recording of said meeting.
3. lt is further directed that a certified copy of this resolution be
the County of San Mateo.
in the official records of
ChairmanI sctl,Ml lb Secretary of the Planning Commission of the City of Burl ingame, do
hereby certify that the foregoing resolution was introduced and adopted at a regular m eeting of the
Planning Commission held on the 11th dav of Mav, 2020 by the foll owing vote
217 GHAIiINING RD - RESO 2020'05-11{d
AYES: COilAROTO, LOflS'
SCHMID, TERRONES, TSE
NOES: GAUL
ABSENT NONE
RECUSED: SARGENT
Secretary
t,
EXHIBIT "A"
Conditions of Approvalfor Categorical Exemption and Design Review Amendment
217 Channing Road
Effective May 21, 2020
Page 'l
1.
4.
6
that the project shall be built as shown on the revised elevation plans submitted to the planning
Division and date stamped April 27, 2020, sheets A3.0 through A3.4; and that the plans
submitted for a Building permit shall be revised to eliminate the corner boards on the second
floor cedar shingle portion;
that the tree protection measures for the existing protected size Magnolia street trees located in
the righlof-way in front of the property shall be instafled as ouflined in the certified Arborist
Report dated March 8, 2019, prior to demolition or construction on the sitei
that any changes to building materials, exterior finishes, windows, architectural features, roof
height or pitch, and amount or type of hardscape materials shall be subject to planning Division
or Planning Commission review (FYl or amendment to be determined by planning statf);
that any changes to the size or envelope of first or second floors, or garage, which would include
adding or enlarging a dormer(s), shall require an amendment to this permit;
that any recycling containers, debris boxes or dumpsters for the construction project shall be
placed upon the private property, if feasible, as determined by the Community Development
Director; that demolition or removal of the existing structures and any grading or earth moving on
the site shall not occur until a building permit has been issued and such site work shali be
required to comply with all the regulations ofthe Bay Area Air Quality Management Districi;
that prior to issuance of a building permit for construction of the project, the project construction
plans shall be modified to include a cover sheet listing all conditions of approval adopted by the
Planning Commission, or City Council on appeal; which shall remain a part of all sets of
approved plans throughout the construction process. Compliance with all conditions of approval
is required; the conditions of approval shall not be modified or changed without the approval of
the Planning Commission, or City Council on appeali
that all air ducts, plumbing vents, and flues shafl be combined, where possible, to a single
termination and installed on the portions of the roof not visible from the street; and that these
venting details shall be included and approved in the construction plans before a Building permit
is issued:
5
that the project shall comply with the Construction and Demolition Debris Recycling Ordinance
which requires affected demolition, new construction and alteration projects to submit a Waste
Reduction plan and meet recycling requirements; any partial or full d;molition of a structure,
interior or exterior, shall require a demolition permit;
T that the project shall meet all the requirements of the california Building and uniform Fire codes,
in effect at time of building permit submittal, as amended by the City of Burlingame;
THE FOLLOWNG CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION PROCESS
PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION:
2.
't.
2.
EXHIBIT "A"
Condations ofApproval for Categorical Exemption and Design Review Amendment
217 Channing Road
Effective May 21, 2020
that prior to final inspection, Planning Division staff will inspect and note comptiance of the
architectural details (trim materials, window type, etc.) to verify that the project has been built
according to the approved Planning and Building plans.
9
Page 2
8.
11
that prior to scheduling the framing inspection the applicant shall provide a certification by the
project architect or residential designer, or another architect or residential design professional,
that demonstrates that the project falls at or below the maximum approved floor area ratio for the
property;
prior to scheduling the framing inspection the project architect or residential designer, or another
architect or residential design professional, shall provide an architectural certification that the
architectural details shown in the approved design which should be evident at framing, such as
window locations and bays, are built as shown on the approved plans; architectural certification
documenting framing compliance with approved design shall be submitted to the Building
Division before the finalframing inspection shall be scheduled;
that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of the
roof ridge and provide certification of that height to the Building Divisioni and
'10.