HomeMy WebLinkAboutReso - PC - 2020.01.13 - 8BDocuSign Envelope fD: OEAZA'S+S-1992-4629-840A-BECD93E45D97
RECORDING REQUESTED BY:
Planning Department
City of Burlingame
WHEN RECORDED MAIL TO:
COMMUNITY DEVELOPMENT DEPARTMENT
CITY OF BURLINGAME
5O1 PRIMROSE ROAD
BURLINGAME, CA 94010
2021-167768
10:30 am 12tOAl21 R1 Fee: NO FEE
Count of Pages 4
Recorded in Official Records
CountY of San Mateo
Mark Church
r
1rl u
il rfliqirftrilliiuqXfiflfifii[iflrt[il t l tt t ll
Resolution No. 2020-01. 1 3-8b
228 STANLEY ROAD
APN 029-262-220
TITLE OF DOCUMENT
I hereby certify this to be a full, true and mnect copy of the
document it purports to be, the original of which is on file in my
office.
October 2021
kr^^iru htl,;au
&!rf,tile
Date:
Kevin Gardiner, AICP, Community Development
{
RESOLUTION APPROVING CATEGORICAL EXEMPTION AND DESIGN REVIEW
RESOLVED, by the Planning Commission of the City of Burlingame that:
WHEREAS, a Categorical Exemption has been prepared and application has been made for Desiqn
Review for a new, two-storv sinqle familv dwellinq and detached qaraqe at 228 Stanlev Road. zoned R-
1, 228 Stanlev Road LLC, propertv owner, APN: 029-262-220;
WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on January
13. 2020, at which time it reviewed and considered the staff report and all other written materials and
testimony presented at said hearing;
NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that:
1. On the basis of the lnitial Study and the documents submitted and reviewed, and comments
received and addressed by this Commission, it is hereby found that there is no substantial
evidence that the project set forth above will have a significant effect on the environment, and
categorical exemption, per CEQA Section 15303 (a), which states that construction of a limited
number of new, small facilities or structures including one single family residence or a second
dwelling unit in a residential zone is exempt from environmental review. In urbanized areas, up
to three single-family residences maybe constructed or converted under this exemption, is
hereby approved.
2. Said Design Review is approved subject to the conditions set forth in Exhibit "A" attached
hereto. Findings for such Design Review is set forth in the staff report, minutes, and recording of
said meeting.
3. lt is further directed that a certified copy of this
the County of San Mateo.
n be recorded in the official records of
Chairperson
V.T:=*:RON(ES Secretary of the Planning Commission of the City
of Burlingame, do hereby certify that the foregoing resolution was introduced and adopted at a regular
meeting of the Planning Commission held on the 13th dav of Januarv. 2020 by the following vote
225 STANLEY Rp - RESO 2020{t1.13{b
AYES: GAUL LOffiS,
TERRONES, TSE
NOES: NONE
ABSENT: NONE
RECUSED: COIAROTO, SARGENT
t,
z
EXHIBIT "A"
Conditions of Approval for Categorical Exemption and Design Review
228 Stanley Road
Effective January 23, 2020
that the prolect shall be built as shown on the plans submitted to the Planning Division date
stamped December 16, 2019 sheets A.'1 through 4.6 and L.1 ;
that any changes to building materials, exterior finishes, windows, architectural features, roof
height or pitch, and amount or type of hardscape materials shall be subject to Planning
Division or Planning Commission review (FYl or amendment to be determined by Planning
staff);
that any changes to the size or envelope of the first or second floors, or garage, which would
include adding or enlarging a dormer(s), shall require an amendment to this permit;
that any recycling containers, debris boxes or dumpsters for the construction project shall be
placed upon the private property, if feasible, as determined by the Community Development
Director;
that prior to issuance of a building permit for construction of the project, the project
construction plans shall be modified to include a cover sheet listing all conditions of approval
adopted by the Planning Commission, or City Council on appeal; which shall remain a part of
all sets of approved plans throughout the construction process. Compliance with all
conditions of approval is required; the conditions of approval shall not be modified or
changed without the approval of the Planning Commission, or City Council on appeal;
that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single
termination and installed on the portions of the roof not visible from the street; and that these
venting details shall be included and approved in the construction plans before a Building
permit is issued;
that the project shall comply with the Construction and Demolition Debris Recycling
Ordinance which requires affected demolition, new construction and alteration projects to
submit a Waste Reduction plan and meet recycling requirements; any partial or full
demolition of a structure, interior or exterior, shall require a demolition permit;
that the project shall meet all the requirements of the California Building and Uniform Fire
Codes, 2016 Edition, as amended by the City of Burlingame.
THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION
PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION:
10. that prior to scheduling the framing inspection the applicant shall provide a certification by the
project architect or residential designer, or another architect or residential design
professional, that demonstrates that the project falls at or below the maximum approved floor
area ratio for the property;
2
4
b
7
8
o
that demolition or removal of the existing structures and any grading or earth moving on the
site shall not occur until a building permit has been issued and such site work shall be
required to comply with all the regulations of the Bay Area Air Quality Management District;
EXHIBIT "A"
Conditions of Approval for Categorical Exemption and Design Review
228 Stanley Road
Effective January 23, 2020
11. prior to scheduling the framing inspection the project architect or residential designer, or
another architecl or residential design professional, shall provide an architectural certification
that the architectural details shown in the approved design which should be evident at
framing, such as window locations and bays, are built as shown on the approved plans;
architectural certification documenting framing compliance with approved design shall be
submitted to the Building Division before the final framing inspection shall be scheduled;
12. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of
the roof ridge and provide certification of that height to the Building Division; and
13. that prior to final inspection, Planning Division staff will inspect and note compliance of the
architectural details (trim materials, window type, etc.) to verify that the project has been built
according to the approved Planning and Building plans.