Loading...
HomeMy WebLinkAboutReso - PC - 2020.01.13 - 7CDocuSign'Envelope'lD: DEA78943-1 992-4629-840A-BECD93E45D97 i RECORDING REQUESTED BY: Planning Department City of Burlingame WHEN RECORDED MAIL TO: COMMUNITY DEVELOPMENT DEPARTMENT CITY OF BURLINGAME 501 PRIMROSE ROAD BURLINGAME, CA 94010 2A21-167767 10:30 am 'l2l}8t21 Rl Fee: NO FEE Count of Pagee 4 Recorded in Official Records CountY of San Mateo Mark Church r !ilr tl rnlimili[fl [i[uuxfitiufifiiflrtfiu U lt ltt Resolution No. 2020-01 .13-7 c 1025 & 1029 CAPUCHINO AVENUE APN 026-214-340 & 026-214-350 TITLE OF DOCUMENT I hereby certify this to be a full, true and correct copy of the document it purports to be, the original of which is on file in my office. October 2021 tr^^rtn brrUNE t.-a- Date: Kevin iner, Al , Community Development fE,HhHSSTE RESOLUTION APPROVING CATEGORICAL EXEMPTION, DESIGN REVIEW, CONDITIONAL USE PERMIT, AND VARIANCES RESOLVED, by the Planning Commission of the City of Burlingame that: WHEREAS, a categorical exemption has been proposed and application has been made for Desion Rev iew. Conditional Use Permit.and Variances for ction of a n on each re-em at 1025 anrl 1029 Cao uchino Avenue zonad R-2 Kurt Steil proDerlv owner. APN: 026-21 4-340 and 026-214-350 WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on January 13.2020. at which time it reviewed and considered the staff report and all other written materials and testimony presented at said hearing; NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that 1 On the basis of the lnitial Study and the documents submitted and reviewed, and comments received and addressed by this commission, it is hereby found that there is no substantial evidence that the project set forth above will have a significant effect on the environment, and categorical exemption, per CEQA Article .19, Section 15303 (b), which states that construction and location of limited numbers of new, small facilities or structures including a duplex or similar multi-family residential structure totaling no more than four dwelling units is exempt from environmental review. ln urbanized areas, this exemption applies to apartment, duplexes and similar structures designed for not more than six dwelling units, is hereby approved. Said Design Review, Conditional Use Permit, and Variances are approved subject to the conditions set forth in Exhibit "A" attached hereto. Findings for such Design Review, Conditional Use Permit, and Variances are set forth in the staff report, minutes, and recording of said meeting. 2 J It is further directed that a certified copy of this resolution be recorded in the official records of the County of San Mateo. Chairman ! ,, M.qtUL , Secretary of the Planning Commission of the Ciry of Burlingame, do hereby certify that the foregoing resolution was introduced and adopted at a regular meeting of the Planning commission held on the 13th dav of Januarv. 2020 by the following vote: i025 A 1029 GAPUCHI O AVE - RESO 202lt{1.13-7cAYES: CO AROTO, cAUl- LOflS, SARGENI, TSENOES: ONE ABSENT NOI{E RECUSED: TERRONES creta Grro*,- EXHIBIT'A" Conditions of Approval for Categorical Exemption, Design Review, Conditional Use permit, and Variances 1025 and 1029 Capuchino Avenue Effective January 23, 2020 that the project shall be built as shown on the plans submitted to the Planning Division date stamped November 26,2018, sheets A0.0 through 44.1, L-1 through L-2.5 and Boundary and Topographic Survey; and including aluminum clad wood windows with simulated true divided lites; 1 that any changes to building materials, exterior finishes, windows, architectural features, roof height or pitch, and amount or type of hardscape materials shall be subject to Planning Division or Planning Commission review (FYl or amendment to be determined by Planning staff); that any changes to the size or envelope of the first or second floors, or garage, which would include adding or enlarging a dormer(s), shall require an amendment to this permit; that the conditions of the Parks Division's August 3, 2017 memo and the Engineering Division's September 27, 2017 memo shall be met; J 4 6 7 8 that the Landscape plan shall include notes detailing tree protection measures for the redwood trees at the rear of 1Q29 Capuchino Avenue and shall be reviewed and approved by the Parks Department prior to the issuance of a Building permit; and that these protection measures shall be installed and inspected by a Certified Arborist and this inspection shall be documented and submitted to the Planning and Parks Divisions; that if the duplex is demolished or the front setback envelope changed at a later date, the front setback variances granted for that duplex with this project approval, as well as any other exceptions to the code granted here will become void; that any recycling containers, debris boxes or dumpsters for the construction project shall be placed upon the private property, if feasible, as determined by the Community Development Director; that demolition for removal of the existing structures and any grading or earth moving on the site shall not occur until a building permit has been issued and such site work shall be required to comply with all the regulations of the Bay Area Air Quality Management District; that prior to issuance of a building permit for construction of the project, the project construction plans shall be modified to include a cover sheet listing all conditions of approval adopted by the Planning Commission, or City Council on appeal; which shall remain a part of all sets of approved plans throughout the construction process. Compliance with all conditions of approval is required; the conditions of approval shall not be modified or changed without the approval of the Planning Commission, or City Council on appeal; that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single termination and installed on the portions of the roof not visible from the street; and that these venting details shall be included and approved in the construction plans 10. 2. o EXHIBIT "A" conditions of Approval for categorical Exemption, Design Review, condi onal use permit, and Variances 1025 and 1029 Capuchino Avenue Effective January 23, 2020 Page 2 before a Building permit is issued; 11 that the project shall comply with the Construction and Demolition Debris Recycling Ordinance which requires affected demolition, new constructio and alteration projects to submit a Waste Reduction plan and meet recycling requirements; any partial or full demolition of a structure, interior or exterior, shall require a demolition permit; that the project shall meet all the requirements of the california Building and uniform Fire Codes, 2016 Edition, as amended by the City of Burlingame; THE FOLLOWNG CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION: 13. that prior to scheduling the foundation inspection, a licensed surveyor shall locate the property corners, set the building footprint and ce(ify the first floor elevation of the new structure(s) based on the elevation at the top of the form boards per the approved plans; this survey shall be accepted by the City Engineer; 12 14. 15 '16 that prior to scheduling the framing inspection the project architect or residential designer, or another architect or residential design professional, shall provide an architectural certification that the architectural details shown in the approved design which should be evident at framing, such as window locations and bays, are built is shown on the approved plans; architectural certification documenting framing compliance with approved design shall be submitted to the Building Division before the final framing inspection shall be scheduled, that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of the roof ridge and provide certification of that height to the Building Division; and that prior to final inspection, Planning Division staff will inspect and note compliance of the architectural details (trim materials, window type, etc.) to verify that the project has been built according to the approved Planning and Building plans.