HomeMy WebLinkAboutReso - PC - 2020.01.13 - 7A, DocuSign Envelope D: DEA78943-1992-462$.840A-BECD93E45D97
RECORDING REQUESTED BY:
Planning Department
City of Burlingame
WHEN RECORDED MAIL TO:
COMMUNIW DEVELOPMENT DEPARTMENT
CITY OF BURLINGAME
501 PRIMROSE ROAD
BURLINGAME, CA 94010
2021-167765
10:30 am 12l0gl21 Rl Fee: NO FEE
Count of Pages 4
Recorded in Official Records
CountY of San Mateo
Mark Church
t1tilll r1iu,llffiuqXfinfi t[fl[1[[ry up
Resof ution No. 2020-01.13-Ta
2225 DAVIS DRIVE
APN 025-192-010
TITLE OF DOCUMENT
I hereby certify this to be a full, true and correct copy ofthe
document it purports to be, the original of which is on file in my
office.
October 2021
&,rrru hrl,it,tr
UUft,E
Date:
Kevin Gardiner, AICP, Community
4(
RESOLUTION APPROVING CATEGORICAL EXEMPTION AND DESIGN REVIEW
RESOLVED, by the Planning Commission of the City of Burlingame that:
WHEREAS, a Categorical Exemption has been prepared and application has been made for Desiqn
Review for a first and second s at 2225 Davis Drive.
zoned R-1. Jeffrev Walker & Anqela Fano. propertv owners. APN: 025-192-010.
WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on January
13. 2020, at which time it reviewed and considered the staff report and all other written materials and
testimony presented at said hearing;
NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that:
1. On the basis of the lnitial Study and the documents submitted and reviewed, and comments
received and addressed by this Commission, it is hereby found that there is no substantial
evidence that the project set forth above will have a significant effect on the environment, and
categorical exemption, per CEQA Section 15301 (eX1) of the CEQA Guidelines, which states
that additions to existing structures are exempt from environmental review, provided the addition
will not result in an increase of more than 50 percent of the floor area of the structures before
the addition, or 2,500 square feet, whichever is less, is hereby approved.
2. Said Design Review approved subject to the conditions set forth in Exhibit "A" attached hereto.
Findings for such Design Review are set forth in the statf report, minutes, and recording of said
meeting.
3. lt is further directed that a certified copy of this resolution be recorded in the official records of
the County of San Mateo.
,.b**
Chairman
t,'?r,t*rnNES Secretary of the Planning Commission of the City of Burlingame, do
hereby certify that the foregoing resolution was introduced and adopted at a regular meeting of the
Planning Commission held on the 13th dav of Januarv, 2020. by the following vote:
2225 DAVIS DR - RESO 2020{t1.13-7a
AYES: COiIAROTO, GAUL, LOffiS,
SARGENT, TERRONES, TSE
NOES: NONE
ABSENT NONE
RECUSED: NONE
Secretary
EXHIBIT "A"
Conditions of Approval for Categorical Exemption and Design Review
2225 Davis Drive
Effective January 23, 2020
Page 1
1 that the project shall be built as shown on the plans submitted to the planning Division
date stamped December 19,2019, sheets A1 through A8;
that any changes to building materials, exterior finishes, windows, architectural features,
roof height or pitch, and amount or type of hardscape materials shall be subject to
Planning Division or Planning Commission review (FYl or amendment to be determined
by Planning staff);
that any changes to the size or envelope of the basement, first or second floors, or
garage, which would include adding or enlarging a dormer(s), shall require an
amendment to this permit;
that any recycling containers, debris boxes or dumpsters for the construction project
shall be placed upon the private properly, if feasible, as determined by the Community
Development Director;
that demolition for removal of the existing structures and any grading or earth moving on
the site shall not occur until a building permit has been issued and such site work shall
be required to comply with all the regulations of the Bay Area Air Quality Management
District;
that prior to issuance of a building permit for construction of the project, the project
construction plans shall be modified to include a cover sheet listing all conditions of
approval adopted by the Planning Commission, or City Council on appeal; which shall
remain a part of all sets of approved plans throughout the construction process.
Compliance with all conditions of approval is required; the conditions of approval shall
not be modified or changed without the approval of the Planning Commission, or City
Council on appeal;
that all air ducts, plumbing vents, and flues shall be combined, where possible, to a
single termination and installed on the portions of the roof not visible from the street; and
that these venting details shall be included and approved in the construction plans
before a Building permit is issued;
that the project shall comply with the Construction and Demolition Debris Recycling
Ordinance which requires affected demolition, new construction and alteration pro.iects
to submit a Waste Reduction plan and meet recycling requirements; any partial or full
demolition of a structure, interior or exterior, shall require a demolition permit;
that the project shall meet all the requirements of the California Building and Uniform
Fire Codes, in effect at time of building permit submittal, as amended by the City of
Burlingame;
4
5
2
I
7
6.
o
EXHIBIT "A"
10. that prior to scheduling the framing inspection the applicant shall provide a certification
by the project architect or residential designer, or another architect or residential design
professional, that demonstrates that the project falls at or below the maximum approved
floor area ratio for the property;
11
12
13.
that prior to scheduling the framing inspection the project architect or residential
designer, or another architect or residential design professional, shall provide an
architectural certification that the architectural details shown in the approved design
which should be evident at framing, such as window locations and bays, are built isshown on the approved plans; architectural certification documenting framing
compliance with approved design shall be submitted to the Building Division before the
final framing inspection shall be scheduled;
that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the
height of the roof ridge and provide certification of that height to the Building Division;
and
that prior to final inspection, Planning Division staff will inspect and note compliance of
the architectural details (trim materials, window type, etc.) to verify that the project has
been built according to the approved Planning and Building plans.
Conditions of Approval for Categorical Exemption and Design Review
2225 Davis Drive
Effective Jan uary 23, 2020
THE FOLLOWNG CONDITIONS SHALL BE TUIET DURING THE BUILDTNG INSPECTION
PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION: