Loading...
HomeMy WebLinkAboutReso - PC - 2022.01.10 - 8AD6cuSi g n Envelope I D : 7 1 AO.B459-3938+J BC-BD EA- E4OS}ZT 44BEB RECORDING REQUESTED BY: Planning Department City of Burlingame WHEN RECORDED MAIL TO: COMMUNITY DEVELOPMENT DEPARTMENT CITY OF BURLINGAME 501 PRIMROSE ROAD BURLINGAME, CA 94010 2022-020902 'l:24 pm 03tO9t2Z Rl Fee: NO FEE Count of pages 4Recorded in Officlal Records County of San Mateo Mark Church iililrtiltiliflLiirLifi Lrmtlflil[ili[ilfl1rilnipr1ilp Resolution No. 2022-01 .24-8A 1357 BERNAL AVENUE APN 026-058-070 TITLE OF DOCUMENT kN I hereby certify this to be a full, true and mrrect copy of the document it purports to be, the original of wtrich is on file in my office. 7 2022 hrrr'ru hrhut A 6JUNE Date: Kevin Gardiner,nity Development RESOLUTION APPROVING CATEGORICAL EXEMPTION, DESIGN REVIEW, AND SPEGIAL PERMIT RESOLVED, by the Planning Commission of the City of Burlingame that: WHEREAS, a Categorical Exemption has been prepared and application has been made for Desiqn Review and Special Permit for buildinq heiqht for a new, two-storv sinqle-unit dwellino and detached qaraqe at 1357 BernalAvenue. Zoned R-1. Archimedes Martinez. propertv owner, APN: 026-058-070; WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on January 24, 2022, at which time it reviewed and considered the staff report and all other written materials and testimony presented at said hearing; NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that: 1. On the basis of the lnitial Study and the documents submitted and reviewed, and comments received and addressed by this Commission, it is hereby found that there is no substantial evidence that the project set forth above will have a significant effect on the environment, and categorical exemption, per Section 15303 (a), which states that construction of a limited number of new, small facilities or structures including one single family residence or a second dwelling unit in a residential zone is exempt from environmental review. ln urbanized areas, up to three single-family residences maybe constructed or converted under this exemption, is hereby approved. Said Design Review and Special Permit are approved subject to the conditions set forth in Exhibit "A" attached hereto. Findings for such Design Review and Special Permit are set forth in the staff report, minutes, and recording of said meeting. 3. lt is further directed that a certified copy of this resolution be I records of the County of San Mateo. 2 Secretary of the Planning Commission of the of Burli ngame, do of thehereby certify that the foregoing resolution was introduced and adopted at a reg Planning Commission held on the 24th dav of Januarv.2022 by the following vote: 1357 BERNAL AVENUE . RESO 2022{11.24-84 AYES: COMAROTO, GAUL, LOffiS, SCHMID, TERROilES, TSE NOES: NONE ABSENT NONE REGUSED: PFAFF l, EXHIBIT "A" Conditions ofApproval for Categorical Exemption, Design Review, and Special Permit 1357 Bernal Avenue Effective February 3, 2022 Page I 1 that the project shall be built as shown on the plans submitted to the Planning Division date stamped January 04, 2022, sheets A'1.1-A3.'1, A5.1, G1, SF, L1-L3 and revised sheets date stamped January 12, 2022, sheets A4.1 and A4.2; that any changes to building materials, exterior finishes, windows, architectural features, roof height or pitch, and amount or type of hardscape materials shall be subjectto Planning Division or Planning Commission review (FYl or amendment to be determined by Planning staf0; that any changes to the size or envelope of the basement, first or second floors, or garage, which would include adding or enlarging a dormer(s), shall require an amendment to this permit; that any recycling containers, debris boxes or dumpsters for the construction project shall be placed upon the private property, if feasible, as determined by the Community Development Director: that demolition for removal of the existing structures and any grading or earth moving on the site shall not occur until a building permit has been issued and such site work shall be required to comply with all the regulations of the Bay Area Air Quality lranagement District; that priorto issuance of a building permitfor construction ofthe project, the project construction plans shall be modified to include a cover sheet listing all conditions of approval adopted by the Planning Commission, or City Council on appeal; which shall remain a part of all sets of approved plans throughout the construction process. Compliance with all conditions of approval is requiredi the conditions of approval shall not be modified or changed without the approvalofthe Planning Commission, or City Councilon appeal; that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single termination and installed on the portions ofthe roof not visible from the street; and that these venting details shall be included and approved in the construction plans before a Building permit is issued; 8. that the project shall comply with the Construction and Demolition Debris Recycting Ordinance which requires affected demolition, new construction and alteration projects to submit a Waste Reduction plan and meet recycling requirements; any partial or full demolition of a structure, interior or exterior, shall require a demolition permit; 9. that the project shall meet all the requirements of the California Building and Uniform Fire Codes, in effect at time of building permit submittal, as amended by the City of Burliogame; THE FOLLOWNG CONDITIONS SHALL BE i'ET DURING THE BUILDING INSPECTION PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION: 10. that prior to scheduling the framing inspection the applicant shall provide a certification by the project architect or residential designer, or another architect or residential design professional, that demonstrates that the project falls at or below the maximum approved floor area ratio for the property; 2. 4. 5. 7. 11 EXHIBIT "A" Conditions of Approval for Categorical Exemption, Design Review, and Special Permit 1357 Bernal Avenue Effective F ebruary 3, 2022 Page 2 that prior to scheduling the foundation inspection, a licensed surveyor shall locate the property corners, set the building footprint and certify the first-floor elevation of the new structure(s) based on the elevation at the top of the form boards per the approved plans; this survey shall be accepted by the City Engineer; 13 that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of the roof ridge and provide certification of that height to the Building Division; and 14 that prior to final inspection, Planning Division staff will inspect and note compliance of the architectural details (trim materials, window type, etc.) to verify that the project has been built according to the approved Planning and Building plans. 12. that prior to scheduling the framing inspection the project architect or residential designer, or another architect or residential design professional, shall provide an architectural certification that the architectural details shown in the approved design which should be evident at framing, such as window locations and bays, are built as shown on the approved plans; architectural certification documenting framing compliance with approved design shall be submitted to the Building Division before the final framing inspection shall be scheduled;