HomeMy WebLinkAboutReso - PC - 2021.12.13 - 8B,..
DocuSign Envelope lD: 26539A68-3030-41 FA-BSC7494SO41OD2B4
RECORDING REQUESTED BY:
Planning Department
City of Burlingame
WHEN RECORDED MAIL TO:
COMMUNITY DEVELOPMENT DEPARTMENT
CIry OF BURLINGAME
501 PRIMROSE ROAD
BURLINGAME, CA 94010
2022-014148
1:25 pm 02116122 Rl Fee: NO FEE
Count of Pages 4
Recorded in Official Records
County of San Mateo
Mark Church
Assessor-Cou nty Clerk-Recorder
I fiit I Iiltil iit !!iltilriil]ll rffi I[] illltlllil tillllllllllii lllllll*$R9003214784$*
Resolution No. 2021-12.13-88
9 VICTORIA ROAD
APN 029-304-120
TITLE OF DOCUMENT
I hereby certifo this to be a full, true and conect copy of the
document it purports to be, the original of which is on file in my
office.
Febru 2022Date:
Kevin AICP, Community Development
rrUhlE
RESOLUTION APPROVING CATEGORICAL EXEMPTION AND DESIGN REVTEW
RESOLVED, by the Planning Commission of the City of Burlingame that:
WHEREAS, a Categorical Exemption has been proposed and application has been made for
a first and storv addition to an existino s familv dwellino at
9 Victoria Road. zoned R-1: Grant Takamoto and Daisv Yu. orooertv owners. APN: 029-304-
1
2
120.
WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on
December 13. 2021, at which time it reviewed and considered the staff report and all other
written materials and testimony presented at said hearing;
NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that:
It is hereby found that the project set forth above is Categorically Exempt from
environmental review pursuant to the California Environmental Quality Act (CEQA), per
Section 15301 (eX2) of the CEQA Guidelines, which states that additions to existing
structures are exempt from environmental review, provided the addition will not result in
an increase of more than 10,000 SF in areas where all public services and facilities are
available and the area in which the project is located is not environmentally sensitive.
Said Design Review is approved subject to the conditions set forth in Exhibit "A"
attached hereto. Findings for such Design Review is set forth in the statf report, minutes,
and recording of said meeting.
3. lt is further directed that a certified copy of this official
records of the County of San Mateo.
Cha
Burlin do hereby ce
regular meeting of the Plann
following vote:
9 VICTOR]A RD - RESO 2021-12.13-88AYES: COMAROTO,GAUL,I_ARIOS,LOffiS,
SGHiIID, TERRONES, TSENOES: NONE
ABSENT NONE
RECUSED: NONE
t
EXHIBIT "A"
Conditions of approval for Categorical Exemption and Design Review
9 Victoria Road
Effective December 27, 202'l
Page 1
that the project shall be built as shown on the plans submitted to the Planning Division
date stamped December 1, 2021, sheets G0.01 through G0.04, A1.0 through A6.0, and
ME2,O;
that any changes to building materials, exterior finjshes, windows, architectural features,
roof height or pitch, and amount or type of hardscape materials shall be subject to
Planning Division or Planning Commission review (FYl or amendment to be determined
by Planning staff);
that any changes to the size or envelope of the basement, first or second floors, or
garage, which would include adding or enlarging a dorme(s), shall require an
amendment to this permit;
that any recycling containers, debris boxes or dumpsters for the construction project
shall be placed upon the private property, if feasible, as determined by the Community
Development Director;
that demolition for removal of the existing structures and any grading or earth moving on
the site shall not occur until a building permit has been issued and such site work shall
be required to comply with all the regulations of the Bay Area Air Quality Management
District;
that prior to issuance of a building permit for construction of the project, the project
construction plans shall be modified to include a cover sheet listing all conditions of
approval adopted by the Planning Commission, or City Council on appeal; which shall
remain a part of all sets of approved plans throughout the construction process.
Compliance with all conditions of approval is required; the conditions of approval shall
not be modified or changed without the approval of the Planning Commission, or City
Council on appeal;
that all air ducts, plumbing vents, and flues shall be combined, where possible, to a
single termination and installed on the portions of the roof not visible from the street; and
that these venting details shall be included and approved in the construction plans
before a Building permit is issued;
that the project shall comply with the Construction and Demolition Debris Recycling
Ordinance which requires affected demolition, new construction and alteration projects
to submit a Waste Reduction plan and meet recycling requirements; any partial or full
demolition of a structure, interior or exterior, shall require a demolition permit;
4
5.
6.
7
I that the project shall meet all the requirements of the California Building and Uniform
Fire Codes, in effect at time of building permit submittal, as amended by the City of
Burlingame;
2.
8.
EXHIBIT "A"
Conditions of approval for Categorical Exemption and Design Review
9 Victoria Road
Effective December 27, 2021
THE FOLLOWNG CONDITIONS SHALL BE MET DURING THE BUILDING INSPEGTION
PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION:
10. that prior to scheduling the framing inspection the applicant shall provide a certification
by the project architect or residential designer, or another architect or residential design
professional, that demonstrates that the project falls at or below the maximum approvid
floor area ratio for the property;
11.that prior to scheduling the framing inspection the project architect or residential
designer, or another architect or residential design professional, shall provide an
architectural certiflcation that the architectural details shown in the approved design
which should be evident at framing, such as window locations and bays, are built is
shown on the approved plans; architectural certification documenting framing
compliance with approved design shall be submitted to the Building Division before the
final framing inspection shall be scheduled;
12.
13.
that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the
height of the roof ridge and provide certification of that height to the Building Division;
and
that prior to final inspection, Planning Division staff will inspect and note compliance of
the architectural details (trim materials, window type, etc.) to verify that the pioject has
been built according to the approved Planning and Building plans.