Loading...
HomeMy WebLinkAboutReso - PC - 2021.11.08 - 8BI DocuSign Envelope lD: 1 73F4EE4-1 4EF 4MB-n8B-D598D41 5FE4E RECORDING REQUESTED BY Planning Department City of Burlingame WHEN RECORDED MAIL TO: COMMUNITY DEVELOPMENT DEPARTMENT CIry OF BURLINGAME 501 PRIMROSE ROAD BURLINGAME, CA 94010 2022-A,I4154 1 :25 pm 02116122 R1 Fee: NO FEE Count of Pages 4 Recorded in Official Records CountY of San Mateo Mark Church I lur r l rilfl milfliifiiiliiiiliXfi llnlnlfi]ffinltl tt ttt illi';-$ R- o-o o 3 z 1 4 I o '1 $ * +{Resolution No. 2021-1 1.08.-88 2701 H!LLSIDE DRIVE APN 027-194-010 TITLE OF DOCUMENT I hereby certify this to be a full, true and conect copy of the document it purports to be, the original of which is on file in my office. 7 2022 h*iru hrliwy @dUNE a: Date: Kevin Development Director RESOLUTION APPROVING CATEGORICAL EXEMPTION, DESIGN REVIEW AND SPEGIAL PERMIT RESOLVED, by the Planning commission of the city of Burlingame that: WHEREAS, a Categorical Exemption has been proposed and application has been made for Desion Review and Special Permit for buildinq heiqht for a new. two-storv sinole familv dwellinq and detached qaraoe at 2701 Hillside Drive, zoned R-1: Alain and Mffi owners, APN: 027-1 94-01 0: WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on November 8, 2021, at which time it reviewed and considered the staff report ind all other written materials and testimony presented at said hearing; NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that: 1. lt is hereby found that the project set forth above is Categorically Exempt from environmental review pursuant to the California Environmental Quality nct (CEaA), per Section 15303 (a) of the CEQA Guidelines, which states that construction of a timiied number of new, small facilities or structures, including one single-family residence, or asecond dwelling unit in a residential zone, is exempt from environmental review. ln urbanized areas, this exemption may be applied to the construction or conversion of up to three (3) single-family residences as part of a project. 2. 3 said Design Review and special Permit are approved subject to the in Exhibit "A" attached hereto. Findings for such Design Review and set forth in the staff report, minutes, and recording of said meeting. It is further directed that a certified copy of th records of the County of San Mateo. conditions set forth Special Permit are in the official Secretary ame, do hereby certify that the foregoing regular meeting of the Planning Com mission he following vote: of the Planning Commission of the City of resolution was introduced and adopted at a ld on the 8th dav of November. 2021 by the 2701 HILLS|DE DR - RESO 2021-11.08€BAYES: COMAROTO, GAUL, LARIGS, LOFTIS, SCHUID, TERRONES, TSENOES: NONE ABSENT NONE REGUSED: NONE lutio t, EXHIBIT "A" 1 Conditions of approval for Categorical Exemption, Design Review and Special permit 2701 Hillside Drive Effective November 18, 2021 Page 1 that the project shall be built as shown on the plans submitted to the planning Division date stamped October 6, 2021, sheets A.1 through A.7, N.1, AC, L1.1, L2.1 and topographic survey plan; that any changes to building materials, exterior finishes, windows, architectural features, roof height or pitch, and amount or type of hardscape materials shall be subject to Planning Division or Planning commission review (Fyl or amendment to be determined by Planning staff); 2 ? 4 o that any changes to the size or envelope of the basement, first or second floors, orgarage, which would include adding or enlarging a dormer(s), shall require an amendment to this permit; that any recycling containers, debris boxes or dumpsters for the construction project shall be placed upon the private property, if feasible, as determined by the community Development Director; that demolition for removal of the existing structures and any grading or earth moving onthe site shall not occur until a building permit has been issuet and such site work ihall be required to comply with all the regulations of the Bay Area Air euality Management District; that prior to issuance of a building permit for construction of the project, the project construction plans shall be modified to include a cover sheet listing iI conditions ofapproval adopted by the Planning commisslon, or city council on appeal; which shallremain a part of all sets of approved plans throughout the constiuction process. compliance with all conditions of approval is required; the conditions of approval shallnot be..modified or changed without the approval of the planning commission, or cityCouncil on appeal; that all air.ducts, plumbing vents, and flues shall be combined, where possible, to a single termination and installed on the portions of the roof not visible from the streei; anJthat thes-e venting details shall.be included and approved in the construction iranibefore a Building permit is issued; that the project shall comply with the construction and Demolition Debris Recyclingordinance which requires affected demolition, new construction and atteration pi6ffi to submit a waste Reduction. plan and meet recycling requirements; any parti;l o'ifulldemolition of a structure, interior or exterior, shall requirl a demolition permii; that the project shall meet all the requirements of the california Building and UniformFire codes, in effect at time of buirding permit submittar, as amended ly tne city ofBurlingame; 7 o I EXHIBIT "A" Conditions of approval for Categorical Exemption, Design Review and Special permit 2701 Hillside Drive Effective November 18, 2021 Page 2 THE FOLLOWNG CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION: 10. that prior to scheduling the framing inspection the applicant shall provide a certification by the project architect or residential designer, or another architect or residential design professional, that demonstrates that the project falls at or below the maximum approved floor area ratio for the property; 12. 13 14. that prior to scheduling the foundation inspection, a licensed surveyor shall locate the property corners, set the building footprint and certify the first floor elevation of the new structure(s) based on the elevation at the top of the form boards per the approved plans; this survey shall be accepted by the City Engineer; that prior to scheduling the framing inspection the project architect or residential designer, or another architect or residential design professional, shall provide an architectural certification that the architectural details shown in the approved design which should be evident at framing, such as window locations and baG, are built isshown on the approved plans; architectural certification documenting framing compliance with approved design shall be submitted to the Building Division before th6 final framing inspection shall be scheduled; that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of the roof ridge and provide certification of that height to th; Building Division; and that prior to final inspection, Planning Division staff will inspect and note compliance of the architectural details (trim materials, window type, etc.) to verify that the pioject has been built according to the approved planning and Building plans. 11.