Loading...
HomeMy WebLinkAboutReso - PC - 2021.11.08 - 8ADocuSign Envelope D: 26539A68-3030-41 FA-85C7 4g450410D284 RECORDING REQUESTED BY: Planning Department City of Burlingame WHEN RECORDED MAIL TO: COMMUNITY DEVELOPMENT DEPARTMENT CIry OF BURLINGAME 501 PRIMROSE ROAD BURLINGAME, CA 94010 2022-014165 1:25 pm 02l'16122 R1 Fee: NO FEE Count of Pages 3 Recorded in Official Records County of San Mateo Mark Church r mu r ililfminfliifiitfrtilfiiilfi ifliliilflnilTiflitil I I lr rlr*$R0003?i 481+S;" Resolution No. 2021-1 1.08-8A 2829 LAS PIEDRAS DRIVE APN 025-072-190 TITLE OF DOCUMENT I hereby certify this to be a full, true and conect copy of the document it purports to be, the original of which is on file in my office. 2022 BL$ffiL$$.{ffi.#-MHc at l, s)?H J a rIUNH Date: Kevin Gardiner, AICP, !rr^it" hrhrut / RESOLUTION APPROVING CATEGORICAL EXEMPTION AND HILLSIDE AREA CONSTRUCTION PERMIT RESOLVED, by the Planning Commission of the City of Burlingame that: WHEREAS, a Categorical Exemption has been proposed and application has been made for a Hillside Area Construction Permit for a first floor addition to an existinq sinqle familv dwellino at 2829 Las Piedras Drive, zoned R-1: Mark and Emilv Karbarz. propertv owners, APN: 025-072- 1 90: WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on November 8.2021.at which time it reviewed and considered the staff report and all other written materials and testimony presented at said hearing; NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that: It is hereby found that the project set forth above is Categorically Exempt from environmental review pursuant to the California Environmental Quality Act (CEQA), per Section 15301 (eX1) of the CEQA Guidelines, which states that additions to existing structures are exempt from environmental review, provided the addition will not result in an increase of more than 50% of the floor area of the structures before the addition. 2. Said Hillside Area Construction Permit is approved subject to the conditions set forth in Exhibit "A" attached hereto. Findings for such Hillside Area Construction Permit are set forth in the staff report, minutes, and recording of said meeting 3. lt is further directed that a certified copy of this be in the official records of the County of San Mateo.\ Chairperson RrQ( tcd2los Secretary of the Planning Commission of the City of 1 Budin$ame, do hereby certify th regular meeting of the Planning following vote: at the foregoing resolution was introduced and adopted at a Commission held on the 8th dav of November, 2021 by the 2E2lt tAS ptFpRAS DR - RESO 2021-11.0S{AAYES: COilAROTO, GAUL, UnUOS, r_OmS, SGHTID, TERRONES, TSENOES: NONE ABSENT: NONE REGUSED: NONE I EXHIBIT "A" Conditions of approval for Categorical Exemption and Hillside Area Construction Permit 2829 Las Piedras Drive Effective November 18, 2021 Page 1 1 that the project shall be built as shown on the plans submitted to the Planning Division date stamped September 13, 2021 , sheets A-0.0 through A-3.1 , and that any changes to the footprint or envelope of the building shall require an amendment to this permit; that any recycling containers, debris boxes or dumpsters for the conslruction project shall be placed upon the private property, if feasible, as determined by the Community Development Director; that demolition or removal of the existing structures and any grading or earth moving on the site shall not occur until a building permit has been issued and such site work shall be required to comply with all the regulations of the Bay Area Air euality Management District; that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single termination and installed on the portions of the roof not visible from the street; and that these venting details shall be included and approved in the construction plans before a Building permit is issued; that the project shall comply with the Construction and Demolition Debris Recycling Ordinance which requires affected demolition, new construction and alteration projects to submit a Waste Reduction plan and meet recycling requirements; any partial or full demolition of a structure, interior or exterior, shall require a demolition permit; and that the project shall meet all the requirements of the California Building and Uniform Fire Codes, in effect at time of building permit submittal, as amended by the City of Burlingame. 4 3 (