HomeMy WebLinkAboutReso - PC - 2021.10.25 - 7CDocuSign Envetope tD: 26;39A68-3oio-+t rn-escz 4g4so41ol2l4
RECORDING REQUESTED BY:
Planning Department
City of Burlingame
WHEN RECORDED MAIL TO:
COMMUNITY DEVELOPMENT DEPARTMENT
CITY OF BURLINGAME
501 PRIMROSE ROAD
BURLINGAME, CA 94010
2022-014162
1:25 pm02t,l6t22 Rl Fee: NO FEE
Count of pages 14
Recorded in Official Records
County of San Mateo
Mark Church
t1lt i
it
il liiil[] tifl fl U
ilUili
U
i[
[r ff n
I
iiiqllr r1 ri r1r
Resolution No. 2021 -1 0.25-7 C
1870-1876 EL CAMINO REAL
025-150-1 60 & 02s-150-1 90
*(
TITLE OF DOCUMENT
I hereby certify this to be a full, true and conect copy of the
document it purports to be, the original of which is on file in my
office.
2022
!{
F
flB
UU}IE
Date:
Kevin Gardiner,
&rxit"
Development Di
RESOLUTION APPROVING CATEGORICAL EXEMPTION AND ONE YEAR EXTENSION
RESOLVED, by the Planning Commission of the City of Burlingame that:
WHEREAS, a Categorical Exemption has been prepared and application has been made for a One
Year Extension of a previouslv approved application for Desion Review, Densitv Bonus. Communitv
Benefits. and Recommendation for Approval of a Lot Merqer for construction of a ne
residential apartment development at 1870-1876 El Camino Real, Zoned NBMU, Bav Area Oil Supplv
lnc. with Prime Plaza LLC. propertv owners, APN: 025-150-160 and 025-150-190;
WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on
October 25. 2021, at which time it reviewed and considered the staff report and all other written
materials and testimony presented at said hearing;
NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that:
1. On the basis of the documents submitted and reviewed, and comments received and addressed
by this Commission, it is hereby found that there is no substantial evidence that the project set
forth above will have a significant effect on the environment, per CEQA Section 15183,
Consistency with the General Plan, is hereby approved.
2. Said Design Review, Density Bonus, Community Benefits, and Recommendation of Lot Merger
are approved subject to the conditions set forth in Exhibit "A" attached hereto. Findings for such
Design Review, Density Bonus, Community Benefits, and Recommendation of Lot Merger set
forth in the staff report, minutes, and recording of said meeting.
3. lt is further directed that a certified copy of this resolution be in records of
the County of San Mateo
Chai
M o M,)w Secretary of the Planning Commission of the City of Burlingame,
do hereby certify that the foregoing
Planning Commission held on
resolution was introduced and adopted at a regular meeting of thethe 25th dav of October. 2021. by the following vote:
SCHTID, TERRONES, rSENOES: NONE$!!!fr couARoro, LARtosREGUSED: NONE Secretary
t,
EXHIBIT "A"
Conditions of Approval for One Year Extension
1870-1876 El Camino Real
Effective November 4, 2021
Page 1
that the project shall include seventeen ("17) affordable units to households of "Moderate
lncome" category, as defined as earning a maximum oi 120% of the San Mateo County
Area Median lncome; the City Manager shall be authorized to execute an agreement
with the applicant and the applicant shall enter into an agreement for the administration
of the renting or leasing of the affordable units at least 120 days before the final
inspection;
that the required affordable dwelling units shall be constructed concurrently with marke!
rate units;
that the seventeen (17) moderate income restricted affordable units shall remain
restricted and affordable to the designated income group for a minimum period of fifty-
five (55) years (or a longer period of time if required by the construction or mortgage
financing assistance program, mortgage insurance program, or rental subsidy program);
that the seventeen (17) restricted affordable units shall be built on-site and be dispersed
within the development. The number of bedrooms of the restricted affordable units shall
be equivalent to the bedroom mix and average sizes of the non-restricted units in the
development; except that the applicant may include a higher proportion of restricted
affordable units with more bedrooms. The design and construction of the affordable
dwelling units shall be consistent with the design, unit layout, and construction of the
total project development in terms of appearance, exterior construction materials, and
unit layout;
that the applicant shall enter into a regulatory agreement with the City; the terms of this
agreement shall be approved as to form by the City Attorney's Office, and reviewed and
revised as appropriate by the reviewing City official; this agreement will be a form
provided by the City, and will include the following terms:
(a) The affordability of very low, lower, and moderate income housing shall be assured
in a manner consistent with Government Code Section 65915(c)(1);
4
6
7
8
1. that the project shall be built as shown on the plans submitted to the Planning Division
date stamped October 9, 2020, sheets 41.0 through A5.4, sheets T0.'1 through TM5.1,
sheets P.1 and sheets Ll through L12;
2. that prior to issuance of a building permit for construction of the project, the project
construction plans shall be modified to include a cover sheet listing all conditions of
approval adopted by the City Council; which shall remain a part of all sets of approved
plans throughout the construction process. Compliance with all conditions of approval is
required; the conditions of approval shall not be modified or changed without the
approval of the Planning Commission, or City Council on appeal;
3. that any changes to the size or envelope of the building, which would include expanding
the footprint or floor area of the structure, replacing or relocating windows or changing
the roof height or pitch, shall be subject to Planning Commission review (Fyl or
amendment to be determined by Planning staff);
EXHIBIT "A"
Conditions of Approval for One Year Extension
1870-1876 El Camino Real
Effective November 4, 2021
Page 2
(b)
(c)
An equity sharing agreement pursuant to Government Code Section 659i5(cX2);
The location, dwelling unit sizes, rental cost, and number of bedrooms of the
affordable units;
A description of any bonuses and incentives, if any, provided by the City; and
Any other terms as required to ensure implementation and compliance with this
section, and the applicable sections of the density bonus law;
d
e(
o that the above noted regulatory agreement regarding the seventeen (17) restricted
affordable units shall be binding on all future owners and successors in interest; the
agreement required by this Zoning Code Section 25.63.080 is hereby a condition of all
development approvals and shall be fully executed and recorded prior to the issuance of
any building or construction permit for the proposed project;
that the project shall include the Transportation Demand Management Measures as
proposed in the Transportation lmpact Analysis, prepared by TDM Specialist lnc., dated
September 16, 2019;
that a TDM annual report shall be prepared by a qualified, independent consultant and
paid for by the owner and submitted to the City of Burlingame annually; with the initial, or
baseline, commute survey report to be conducted and submitted one (1) year after the
granting of a certificate of occupancy for 75 percent or more of the project and annually
after that;
that the TDM annual report shall provide information about the level of alternative mode-
uses and in the event a 25 percent reduction in peak-hour vehicle trips and reduction in
overall parking demand is not met, the report shall explain how and why the goal has not
been reached; in such a circumstance the annual report shall identify a work plan, to be
approved by the City of Burlingame, which describes additional or alternative measures
for implementation that would be necessary to enhance the TDM program to attain the
TDM goal of 25 percent mode split;
that the city may consider whether the employer/tenant has made a good faith effort to
meet the TDM goals and may allow the owner a six-month "grace period" to implement
additional TDM measures to achieve the 25 percent vehicle trip reduction;
that prior to the issuance of building permits, a covenant agreement shall be recorded
office with the San Mateo County Assessor and Recorder's Office to provide
constructive notice to all future owners of the property of any ongoing programmatic
requirements that discloses the required Transportation Demand Management (TDM)
provisions and any conditions of approval related herein to compliance and reporting for
the TDM;
10
11.
12.
IJ
14
that the applicant shall prepare, and submit, a Construction Risk Management plan to
the San Mateo County Environmental Health's Groundwater protection program (Gpp)
for approval, prior to the issuance of a building permit. The Construction Risi
Management Plan shall address the possibility of encountering subsurface
contaminants, including groundwater, during construction activities, and the relevant
'15
EXHIBIT "4"
Conditions ofApprovalfor One Year Extension
1870-1876 El Camino Real
Effective November 4, 2021
Page 3
17
18
19
20
21
measures for identifying, handling, and disposing of subsurface contaminants. The
Construclion Risk Management Plan shall be submitted and approved by the San Mateo
County Environmental Health Department's Groundwater Protection program prior to
issuance of a building permit;
that the coniractor shall ensure the appropriate handling, storing, and sampling of any
soil to be removed from the subject property, as per the Construction Risk l\ranagement
Plan so as to eliminate potential health and safety risks to the pubtic, including
construction workers;
that in the event that groundwater, or other subsurface contaminants, are encountered
during excavation, grading, or any other demolition/construction activities at the project
site, the contractor shall ensure that the procedure for evaluating, handling, storing,
testing, and disposing of contaminated groundwater is implemented, as per the
Construction Risk Management Plan;
that workers handling demolition and renovation activities at the project site will be
trained in the safe handling and disposal of any containments with which they are
handling or disposing of on the project site;
that prior to issuance of a building permit for the project, the projecl applicant shall pay
the first half of the North Burlingame/Rollins Road Development Fee in the amount of
$88,505.35, made payable to the City of Burlingame and submitted to the planning
Division;
that prior to scheduling the final framing inspection, the project applicant shall pay the
second half of the North Burlingame/Rollins Road Development Fee in the amount of
$88,505.35, made payable 1o the City of Burlingame and submitted to the planning
Divisioni
that prior to final inspection or the date the certificate of occupancy is issued, whichever
occurs first, the project applicant shall pay the Public lmpact Fees in the amount of
$709,258.30 in full, payable to the City of Burlingame and submitted to the ptanning
Divisionl
that the public plaza shall be owned, operated, and maintained by the developer or
property manager in accordance with an approved maintenance plan to be reviewed and
approved by the Community Development Director;
22
that the public plaza shall be open to the public, without charge, each day of the year,
except for temporary closures for necessary maintenance or public safety;
that the conditions of the Building Division's October 29, 2Oj9 and January 28, 2O2O
memos, the Stormwater Division's OctoberlT, 2019 and January 24, 2020 memos, the
Park's Division's Octobell6,20'19 memo, Fire Division's August 16, 2019 and January
28, 2020 memos and the Public-Works Engineering Division's October j7,201|9 and
February 27.2020 memos related to the buitding permit submittal shafl be met:
24
EXHIBIT "A"
Conditions of Approval for One Year Extension
1870-1876 El Camino Real
Effective November 4, 2021
Page 4
25
26
27.
that the project shall be constructed in accordance with the December 2, 2019 "Request
for Alternate Materials or Methods of Construction" agreement between the applicant
(Studio T-Square Architecture or any future owner) and Central County Fire Department
which requires the following: 1) The building shall be a minimum of Type lllA
construction. This has already been stated on the Planning Department plan submittal;
2) Fire sprinklers at the garage level shall be of quick-response type; and 3) Two stair
enclosures extend to the roof level with standpipe test located immediately outside of the
roof level stair well doors and the positive pressures system within each stair enclosure
of smoke control;
prior to issuance of a building permit, the project sponsor shall verify that the August 23,
2019, FAA determination of no hazard to air navigation for the project is still current and
has not expired (212312'l) and if expired a new FAA determination of no hazard to air
navigation shall be submitted to the City of Burlingame prior to building permit issuance;
that that the project shall comply with the SFO Comprehensive Airport Land Use
Compatibility Plan (ALUCP), specifically in accordance with Safety Compatibitity Policy
SP-2 pertaining to land uses; and that any future tenants of the commercial and office
space comply with the Safety Compatibility Criteria for Safety Zone 2 as contained in
Table lV-2 of the SFO ALUCP; this table defines uses to avoid and uses that are
incompatible, summarized as follows:
lncompatible Uses- Use is not com patible in the indicated zones and cannot be
permitted:o Children's schools - Public and private schools serving preschool through
grade 12, excluding commercial services. Large child day care centers and noncommercial employer-sponsored
centers ancillary to a place of business - Commercial facilities defined in
accordance with Health and Safety Code, Section 1596-70, et seq., and licensed
to serve 15 or more children.o Hospitals, nursing homeso Hazardous uses - Uses involving the manufacture, storage, or processing of
flammable, explosive, or toxic materials that would substantially aggravate the
consequences of an aircraft accident. See Policy SP-3 of the SFO ALUCp for
additional detail.. Gritical public utilities - Facilities that, if disabled by an aircraft accident, could
lead to public safety or health emergencies. They include the following: electrical
power generation plants, electrical substations, wastewater treatment plants, and
public water treatment facilities.. Theaters (Live, and Movie or Similar), meeting halls, places of assembly
seating more than 300 people. Stadiums, arenas
that all new development shall be required to comply with the real estate disclosure
requirements of State law and General Plan as outlined in Policy lP-1 of the SFO
ALUCP. The following statement must be included in the notice of intention to offer the
property for sale or lease:
28
EXHIBIT "A"
Conditions of Approvalfor One Year Extension
1870-1876 El Camino Real
Effective November 4, 2021
Page 5
29
31
30
"Nolice of Airport in Vicinity
This property is presently located in the vicinity of an airport, within what is known as
an airport influence area. For that reason, the property may be subject to some of
the annoyances or inconveniences associated with proximity to airport operations
(for example: noise, vibration, or odors). lndividual sensitivities to those annoyances
can vary from person to person. You may wish to consider what airport annoyances,
if any, are associated with the property before you complete your purchase or lease
and determine whether they are acceptable to you.";
that during construction, the applicant shall provide fencing (with a fabric screen or
mesh) around the project site to ensure that all construction equipment, materials and
debris is kept on site;
that storage of construction materials and equipment on the street or in the public righf
of-way shall be prohibited;
that the applicant shall prepare a construclion staging and traffic control plan for the
duration of construction for review and acceptance by the City Engineer prior to the
issuance of a building permit; the construction staging plan shall include construction
equipment parking, construction employee parking, timing and duration of various
phases of construction and construction operations hours; the staging plan shall address
public safety and shall ensure that worker's vehicles and construction equipment shall
not be parked in public parking areas with exceptions for construction parking along the
street frontages of the project site;
that the project applicant and its construction contraclor(s) shall develop a construction
management plan for review and approval by the City of Burlingame. The plan must
include at least the following ltems and requirements to reduce, to the maximum extent
feasible, traffic and parking congestion during construction:
A set of comprehensive traffic control measures, including scheduling of major
truck trips and deliveries to avoid peak traffic hours, detour signs if required, lane
closure procedures, signs, cones for drivers, and designated construction access
routes;
ldentification of haul routes for movement of construction vehicles that would
minimize impacts on motor vehicular, bicycle and pedestrian traffic, circulation
and safety, and specifically to minimize impacts to the greatest extent possible
on streets in the project area;
Notification procedures for adjacent property owners and public safety personnel
regarding when major deliveries, detours, and lane closures would occur;
Provisions for monitoring surface streets used for haul routes so that any
damage and debris attributable to the haul trucks can be identified and corrected
by the project applicant; and
Designation of a readily available contact person for construction activities who
would be responsible for responding to any local complaints regarding traffic or
EXHIBIT "A"
34
35
Conditions of Approval for One Year Extension
{870-1876 El Camino Real
Effective November 4, 2021
Page 6
33
36
37
parking. This coordinator would determine the cause of the complaint and, where
necessary, would implement reasonable measures to conect the problem.
that if construction is done during the wet season (October 1 through April 30), that prior
to October 1 the developer shall implement a winterization program to minimize the
potential for erosion and polluted runoff by inspecting, maintaining and cleaning all soil
erosion and sediment control prior to, during, and immediately after each storm even;
stabilizing disturbed soils throughout temporary or permanent seeding, mulching
matting, or tarping; rocking unpaved vehicle access to limit dispersion of mud onto public
right-of-way; covering/tarping stored construction materials, fuels and other chemicals;
that trash enclosures and dumpster areas shall be covered and protected from roof and
surface drainage and that if water cannot be diverted from these areas, a self-contained
drainage system shall be provided that discharges to an interceptor;
that this project shall comply with the state-mandated water conservation program, and a
complete lrrigation Water Management and Conservation Plan together with complete
landscape and irrigation plans shall be provided at the time of building permit
application;
that all site catch basins and drainage inlets flowing to the bay shall be stenciled. All
catch basins shall be protected during construction to prevent debris from entering;
that this proposal shall comply with all the requirements of the Tree Protection and
Reforestation Ordinance adopted by the City of Burlingame in 1993 and enforced by the
Parks Department; complete landscape and irrigation plans shall be submitted at the
time of building permit application and the street trees will be protected during
construction as required by the City Arborist;
that a Protected Tree Removal Permit shall be required from the City of Burlingame
Parks Division to remove any existing protected size trees on the subject property and
that the project shall comply with the Tree Protection and Reforestation Ordinance
adopted by the City of Burlingame and enforced by the Parks Department; complete
landscape and irrigation plans shall be submitted at the time of building permit
40
38. that project approvals shall be conditioned upon installation of an emergency generator
to power the sump pump system; and the sump pump shall be redundant in all
mechanical and electrical aspects (i.e., dual pumps, controls, level sensors, etc.).
Emergency generators shall be housed so that they meet the City's noise requirement;
39. that prior to issuance of a building permit, the applicant shall prepare and submit to the
Department of Public Works - Engineering Division a sanitary sewer analysis that
assesses the impact of this project to determine if the additional sewage flows can be
accommodated by the existing sewer line. lf the analysis results in a determination that
the existing sewer line requires upgrading, the applicant shall perform the necessary
upgrades as determined by the Engineering Division;
43
44
45
EXHIBIT "A"
Conditions of Approval for One Year Extension
1870-1876 El Camino Real
Effective November 4, 202{
PageT
application and the street trees will be protected during construction as required by the
City Arborist;
41 that the project shall comply with the Construction and Demolition Debris Recycling
Ordinance which requires affected demolition, new construction and alteration projects
to submit a Waste Reduction plan and meet recycling requirements; any partial or full
demolition of a structure, interior or exterior, shall require a demolition permit;
42 that demolition or removal of the existing structures and any grading or earth moving on
the site shall not occur until a building permit has been issued and such site work shall
be required to comply with all the regulations of the Bay Area Air Quality Management
Diskict;
that the applicant shall comply with Ordinance 1503, the City of Burlingame Storm Water
Management and Discharge Control Ordinance;
that the project shall meet all the requirements of the California Building and Uniform
Fire Codes, as amended by the City of Burlingame;
that this project shall comply with Ordinance No. 1477, Exterior lllumination Ordinance;
46. that construction access routes shall be limited in order to prevent the tracking of dirt
onto the public right-of-way, clean off-site paved areas and sidewalks using dry
sweeping methods;
The following conditions shall be met during the Building lnspection process prior to the
inspections noted in each condition:
47- that prior to scheduling the foundation inspection a licensed surveyor shall locate the
property corners, set the building envelope;
48 that prior to scheduling the framlng inspection, the project architect, engineer or other
licensed professional shall provide architectural certification that the architectural details
such as window locations and bays are built as shown on the approved plans; if there is
no licensed professional involved in the project, the property owner or contractor shall
provide the certification under penalty of perjury. Certifications shall be submitted to the
Building Division;
that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the
height of the roof ridge and provide certification of that height to the Building Division;
that prior to final inspection, Planning Division staff will inspect and note compliance of
the architectural details (trim materials, window type, etc.) to verify that the project has
been built according to the approved Planning and Building plans;
49
50
EXHIBIT "A"
Conditions of Approval for One Year Extension
1870-1876 El Camino Real
Effective November 4, 2021
Page 8
The following condilions of approval are from applicable policies of the 2040 General
Plan or the Environmental lmpact Repoft prepared for the 2040 General Plan:
5'l . Policy HP-3:12: Project€pecific Construction Best Practices. The Project sponsor
shall ensure implementation of the following BMPs during Project construction, in
accordance with the BAAQMD's standard requirements:. All exposed surfaces (e.9., parking areas, staging areas, soil piles, graded areas,
unpaved access roads) shall be watered two times per day.. All haul trucks transporting soil, sand, or other loose material offsite shall be
covered.. All visible mud or dirt track-out onto adjacent public roads shall be removed using
wet-power vacuum street sweepers at least once per day. The use of dry-power
sweeping shall be prohibited.. All vehicle speeds on unpaved roads shall be limited to 15 mph.. All roadways, driveways, and sidewalks that are to be paved shall be paved as
soon as possible. Building pads shall be laid as soon as possible after grading,
unless seeding or soil binders are used.. ldling times shall be minimized, either by shutting equipment off when not in use or
reducing the maximum idling time to 5 minutes (as required by the California
Airborne Toxics Control Measure, Title t 3, Section 2485 of California Code of
Regulations). Clear signage shall be provided for construction workers at all
access points.. All construction equipment shall be maintained and properly tuned, in accordance
with manufacturer's specifications. All equipment shall be checked by a certified
mechanic and determined to be running in proper condition prior to operation.. A publicly visible sign with the name and telephone number of the person to
contact at the lead agency regarding dust complaints shall be posted. This person
shall respond and take corrective action within 48 hours. The BAAQMD's phone
number shall also be visible to ensure compliance with applicable regulations.
52 PSM-CUL-1: Undiscovered Archaeological Resources. A qualified archaeologist
shall conduct a pre-construction archaeological sensitivity training session for the
excavation crew. This training will include an overview of what cultural resources are and
provide information regarding why such resources are important, archaeological terms
(such as site, feature, deposit), project site history, the types of cultural resources that
are likely to be uncovered during excavation, the laws that protect cultural resources,
and the protocol for unanticipated discoveries (see below). An "Alert Sheet" shall be
posted in conspicuous locations on the project site to alert personnel to the procedures
and protocols to follow after discovery of potentially significant precontact archaeological
resources.
PSM-CUL-I: Undiscovered Archaeological Resources. ln the event that
archaeological resources are encountered during construction, work shall be halted
within '100 feet of the discovery and the area avoided until a qualified professional
53
EXHIBIT "A"
Conditions ofApprovalfor One Year Extension
1870-1875 El Camino Real
Effective Novembor 4, 2021
Page 9
54
55
56
57
58.
archaeologist has evaluated the situation and provided appropriate recommendations. lf
the find is determined to be potentially significant, the archaeologist, in consultation with
the Native American representative, shall develop a treatment plan, which could include
site avoidance, capping, or data recovery.
PSI'ICUL-l: Undiscovered Archaeological Resources. lf human remains are
unearthed during construction, pursuant to Section 50977.98 of the Public Resources
Code and Section 7050.5 of the State Health and Safety Code, there shall be no further
excavation or disturbance ofthe site or any nearby area reasonably suspected to overlie
adjacenl human remains. The county coroner shall be informed to evaluate the nature of
the remains. lf the remains are determined to be of Native American in origin, the lead
agency shall work with the NAHC and the applicant to develop an agreement for trealing
or disposing ofthe human remains.
PSM-CUL-l; Undiscovered Archaeological Reaources. lf archaeological resources
are identified, a final report summarizing the discovery of cultural materials shall be
submitted to the City's Community Development Director prior to issuance of building
permits. This reporl shall contain a description of the mitigation program that was
implemented and its results, including a description of lhe monitoring and testing
program, a list of the resources found and conclusion, and a description of the
disposition/curation of the resources.
CS4.7: Airport and Heliport Noise. Monitor noise impacts from aircrafr operations at
San Francisco lnternational Airport and Mills-Peninsula Medical Center, and implement
applicable noise abatement policies and procedures as outlined in the Airport Noise
Ordinance and Airport Land Use Compatibility Plan;
CS.1.8: Airport Noise Evaluation and Mitigation. Require project applicants to
evaluation potential airport noise impacts if the project is located within the 60 CNEL
contour line of San Francisco lnternational Airport (as mapped in the Airport Land Use
Compatibility Plan). All projects shall be required to mitigate impacts to comply with the
interior and exterior noise standards established by the Airport Land Use Compatibility
Plan;
CS4.l0: Proiect-Specific Construction Noise Control Measures. To reduce
construction noise impacts, the project contractor(s) shall implement the following
actions:. ln compliance with Chapter 18.07.'1 10 of the Municipal Code, construction
activities, including truck traffic coming to and from the construction site for any
purpose, shall be limited to the hours of 8:00 a.m. to 7:00 p.m., Monday to
Friday, and 9:00 a.m. to 6:00 p.m. on Saturdays, unless permission is granted
with a development permit or other planning approval.. Construction staging areas shall be established at locations that will create the
greatest distance between the construction-related noise sources and noise-
sensitive receptors nearest the project site during all project construction.
EXHIBIT "A"
Conditions of Approval for One Year Extension
{870-{876 El Camino Real
Effective November 4, 202{
Page 10
59
Avoid the use of circular saws, miter/chop saws, and radial arm saws near the
adjoining noise-sensitive receptors. Where feasible, shield saws with a solid
screen with material having a minimum surface density of 2 pounds per square
foot (e.9., such as 0.74 inch plywood).
Unnecessary idling of internal combustion engines shall be strictly prohibited.
Control noise from construction workers' radios to a point where they are not
audible at existing residences bordering the project site.
Maintain smooth vehicle pathways for trucks and equipment accessing the site
and avoid local residential neighborhoods as much as possible.
During final grading, substitute graders for bulldozers, where feasible. Wheeled
heavy equipment are quieter than track equipment and should be used where
feasible.
During interior construction, locate noise-generating equipment within the
building to break the line-of-sight to the adjoining receptors.
The contractor shall prepare a detailed construction plan identifying the schedule
for major noise-generating construc{ion activities. The construction plan shall
identify a procedure for coordination with adjacent residential land uses so that
construction activities can be scheduled to minimize noise disturbance.
Designate a "disturbance coordinator" who would be responsible for responding
to any complaints about construction noise. The disturbance coordinator will
determine the cause of the noise complaint (e.9. bad muffler, etc.) and will
require that reasonable measures be implemented to conect the problem.
Conspicuously post a telephone number for the disturbance coordinator at the
construction site and include it in the notice sent to neighbors regarding the
construction schedule.
Policy CS-4.12: Project€pecific Vibration Control Measures. To reduce construction
vibration impacts, the project contractor(s) shall implement the following actions:. A list of all heavy conslruction equipment to be used for the proposed project
known to produce high vibration levels (tracked vehicles, vibratory compaction,
jackhammers, hoe rams, etc.) shall be submitted to the City of Burlingame by the
contractor. This list shall be used to identify equipment and activities that would
potentially generate substantial vibration and to define the level of effort for
reducing vibration levels below the thresholds.. Operating equipment on the construction site shall be placed as far as possible
from vibration-sensitive receptors.. Smaller equipment shall be used where possible to minimize vibration levels
below the limits.. Vibratory rollers and tampers shall not be used within 20 feet of the 't860 El
Camino Real building.. Demolition methods not involving impact tools shall be used.. Alternative construction methods to reduce vibration levels below the limits shall
be identified and used.. Dropping of heavy objects or materials shall be avoided.. Neighbors within 100 feet of the construction site shall be notified of the
construction schedule and that there could be noticeable vibration levels during
project construction activities.
EXHIBIT "A"
Conditions of Approval for One Year Extension
1870-1876 El Camino Real
Effective November 4, 2021
Page 1 1
lf heavy construction is proposed within 20 feet of the 1860 El Camino Real
building, a construction vibration-monitoring plan shall be implemented prior to,
during, and after vibration generating construction activities located within these
setbacks. All plan tasks shall be undertaken under the direction of a licensed
Professional Structural Engineer in the State of California and be in accordance
with industry accepted standard methods. The construction vibration monitoring
plan should be implemented to include the following tasks:o Performance ofa photo survey, elevation survey, and crack monitoring
survey for the '1860 El Camino Real building. Surveys shall be performed
prior to and after completion of vibration generating construction activities
located within 20 feet of the structure. The surveys shall include internal
and external crack monitoring in the structure, settlement, and distress,
and shall document the condition of the foundation, walls and other
structural elements in the interior and exterior of the structure.o Conduct a post-survey on the 1860 El Camino Real building where either
monitoring has indicated high levels or complaints of damage. Make
appropriate repairs in accordance with the Secretary of the lnterior's
Standards where damage has occurred as a result of construction
activities.o The results of any vibration monitoring shall be summarized and
submitted in a report shortly after substantial completion of each phase
identified in the project schedule. The report will include a description of
measurement methods, equipment used, calibration certificates, and
graphics as required to clearly identify vibration-monitoring locations. An
explanation of all events that exceeded vibration limits will be included
together with proper documentation supporting any such claims.o Designate a person responsible for registering and investigating claims of
excessive vibration. The contact information of such person shall be
clearly posted on the construction site.
60 HP-5.2: Migratory Birds. Avoid construction activities that involve tree removal between
March and June, unless a bird survey has been conducted to determine that the tree is
unused during the breeding season by avian species protected under California Fish and
Game Codes 3503, 3503.5, and 351 1;
|lM 12-1: Paleontological Assessment. ln areas containing middle to late pleistocene-
era sediments where it is unknown if paleontological resources exist, prior to grading an
assessment shall be made by a qualified paleontological professional to establish the
need for paleontological monitoring. Should paleontological monitoring be required after
recommendation by the professional paleontologist and approval by the Community
Development Director, paleontological monitoring shall be implemented.
Paleontological Monitoring. A project that requires grading plans and is located in an
area of known fossil occurrence or that has been demonstrated to have fossils present in
a paleontological field survey or other appropriate assessment shall have all grading
monitored by trained paleontological crews working under the direction of a qualified
professional, so that fossils exposed during grading can be recovered and preserved.
61.
EXHIBIT "A"
Conditions of Approval for One Year Extension
1870.1876 El Camino Real
Effeciive November 4, 202'l
Page 12
Should any potentially unique fossils be encountered during development activities, work
shall be halted immediately within 50 feet of the discovery, the City of Burlingame
Planning Department shall be immediately notified, and a qualified paleontologist shall
be retained to determine the significance of the discovery.
Paleontological Recovery, ldentification, and Curation. The City and a project
applicant shall consider the mitigation recommendations of lhe qualified paleontologist
for any unanticipated discoveries. The City and the project applicant shall consult and
agree upon implementation of measures that the City and project applicant deem
feasible and appropriate. Such measures may include avoidance, preservation in place,
excavation, documentation, curation, data recovery, or other appropriate measures. The
project applicant shall be required to implement any mitigation necessary for the
proteetion of paleontological resources.
Paleontological Findings. Qualified paleontological personnel shall prepare a report of
tindings (with an itemjzed appendix of specimens) subsequent to implementation of
paleontological recovery, identification, and curation. A preliminary report shall be
submitted, subject to approval by the Community Development Director before granting
of building permits, and a final reporl shall be submitted, subject to approval by the
Community Development Director before granting of occupancy permits.