Loading...
HomeMy WebLinkAboutReso - PC - 2021.10.25 - 7BDocuSign Envelope lD: 26539468-3030-41 FA-BSC7 4945041 0D284 RECORDING REQUESTED BY: Planning Department City of Burlingame WHEN RECORDED MAIL TO: COMMUNITY DEVELOPMENT DEPARTMENT CITY OF BURLINGAME 50,1 PRIMROSE ROAD BURLINGAME, CA 94010 2022-014161 1:25 pm Ail16122 R1 Fee: NO FEE Count of Pages 4 Recorded in Official Records County of San Mateo Mark Church Assessor-Cou nty Clerk-Recorder r ll]rliililfl rilflil lllilililililtifli ilfli]ilt ilil ililt ill II ilt ll]* $ R 0 0 0 3 ? 1 4 S 0 9-$ i- Resolution No. 2021 -10.25-78 520 HOWARD AVENUE 029-254-200 { TITLE OF DOGUMENT I hereby certify this to be a full, true and correct copy ofthe document it purports to be, the original of which is on file in my office. Date: February 3, 2022 &r^^,ru hrkatr Byffihrffirys,mffi +rUltlg @ Kevin Development Director a RESOLUTION APPROVING CATEGORIGAL EXEMPTION AND DESIGN REVIEW RESOLVED, by the Planning Commission of the City of Burlingame that: WHEREAS, a Categorical Exemption has been prepared and application has been made for Desion Review for a first and second storv addition to an existinq sinqle familv dwellinq at 520 Howard Avenue, Zoned R-1. David Hackos and Lauren Conv. propertv owners, APN: 029-254-200; WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on October 25. 2021, at which time it reviewed and considered the staff report and all other written materials and testimony presented at said hearing; NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that: 1. On the basis of the lnitial Study and the documents submitted and reviewed, and comments received and addressed by this Commission, it is hereby found that there is no substantial evidence that the project set forth above will have a significant effect on the environment, and categorical exemption, per CEQA Section 15301 (eX1) of the CEQA Guidelines, which states that additions to existing structures are exempt from environmental review, provided the addition will not result in an increase of more than 50o/o of the floor area of the structures before the addition are exempt from environmental review, is hereby approved. 2. Said Design Review is approved subject to the conditions set forth in Exhibit "A" attached hereto. Findings for such Design Review are set forth in the staff report, minutes, and recording of said meeting. 3. lt is further directed that a certified copy of this resolution be the County of San Mateo. records of Cha trman l'l 6wl/Secretary of the Planning Commission of the City of Burlingame, do hereby certify that the foregoing resolution was introduced and adopted at a regular meeting of the Planning Commission held on the 25th dav of October, 2021 by the following vote: 520 HOWARD AVE - RESO 2021-10.25-78 AYES: GAUL, SCHMID, TERRONES, TSE NOES: NONE ABSENT COMAROTO,LARIOS RECUSED: LOFTIS EXHIBIT "A' Conditions ofApproval for Categorical Exemption and Design Review 520 Howard Avenue Effective November,l, 2021 Page 1 1 2 3. 4 5. that the project shall be built as shown on the plans submitted to the Planning Division and date stamped September 23, 202'1, sheets A0.0 through A4.0, L1.0 through L2.5, and October 18, 2021, sheets 401.1, 44.'1, andA5.0; that any changes to building materials, exterior finishes, windows, architectural features, roof height or pitch, and amount or type of hardscape materials shall be subject to Planning Division or Planning Commission review (FYl or amendment to be determined by Planning staff); that any changes to the size or envelope of the basement, first or second floors, or garage, which would include adding or enlarging a dormer(s), shall require an amendment to this permit; that any recycling containers, debris boxes or dumpsters for the construction project shall be placed upon the private property, if feasible, as determined by the Community Development Director; that demolition for removal ofthe existing structures and any grading or earth moving on the site shall not occur until a building permit has been issued and such site work shall be required to comply with all the regulations of the Bay Area Air Quality Management District; that prior to issuance of a building permit for construction of the project, the project construction plans shall be modified to include a cover sheet listing all conditions of approval adopted by the Planning Commission, or City Council on appeal; which shall remain a part of all sets of approved plans throughout the construction process. Compliance with all conditions of approval is required; the conditions of approval shall not be modified or changed without the approval of the Planning Commission, or City Council on appeal; that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single termination and installed on the portions of the roof not visible from the street; and that these venting details shall be included and approved in the construction plans before a Buibing permit is issued: that the project shall comply with the Construction and Demolition Debris Recycling Ordinance which requires affected demolition, new construction and alteration projects to submit a Waste Reduction plan and meet recycling requirements; any partial or full demolition of a structure, interior or exterior, shall require a demolition permit; that the project shall meet all the requirements of the California Building and Uniform Fire Codes, in effect at time of building permit submittal, as amended by the City of Burlingame; THE FOLLOWNG CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION: 6. 7 8 9 that prior to scheduling the framing inspection the applicant shall provide a certification by the project architect or residential designer, or another architect or residential design professional, that demonstrates that the project falls at or below the maximum approved floor area ratio for the property; '10 Conditions of Approval for Categorical Exemption and Design Review 520 Howard Avenue Effective November 4, 2021 Page 2 11. 12. 13 that prior to scheduling the foundation inspection, a licensed surveyor shall locate the property corners, set the building footprint and certify the first floor elevation of the new structure(s) based on the elevation at the top of the form boards per the approved plans; this survey shall be accepted by the City Engineer: that prior to scheduling the framing inspection the project architect or residential designer, or another architect or residential design professional, shall provide an architectural certification that the architectural details shown in the approved design which should be evident at framing, such as window locations and bays, are built as shown on the approved plans; architecturil certification documenting framing compliance with approved design shall be submitted to the Building Division before the final framing inspection shall be scheduled; and that prior to final inspection, Planning Division staff will inspect and note compliance of the architectural details (trim materials, window type, etc.) to verify that the project has been built according to the approved Planning and Building plans. EXHIBIT ..A"