Loading...
HomeMy WebLinkAboutReso - PC - 2021.10.12 - 8EDocuSig n Envgbpe lD : 7 i 4427 6C-21 6E.4AF9-ACA5- 1 A0 1 E30AB5DE RECORDING REQUESTED BY: Planning Department City of Burlingame WHEN RECORDED MAIL TO: COMMUNITY DEVELOPMENT DEPARTMENT CITY OF BURLINGAME 501 PRIMROSE ROAD BURLINGAME, CA 94010 2021-167384 1:15 pm 12tOlt21 R1 Fee; NO FEE ^ Count of pages 4xecorded in Official Records County of San Mateo , Mark Church c flu/ru|iltil//ru ruil/ull{til[/il/Iil ///ti 1 Resolution No. 2021-1 0. 1 2.21 -8e 1204 EL CAI4INO REAL 026-096-180 TITLE OF DOCUMENT I hereby certify this to be a full, true and correct copy of the document it purports to be, the original of which is on file in my office. October 2021 k,^r'ru TY !ruC*E Date: Kevin Gardiner, AICP, Community Development i RESOLUTION APPROVING CATEGORICAL EXEM PTION, COMM ERCIAL DESIGN REVI EW, AND PARKING VARIANCE RESOLVED, by the Planning Commission of the City of Burlingame that: WHEREAS, a Categorical Exemption has been prepared and application has been made for Commercial Desion Review for exterior facade chanqes to an existinq commercial buildinq and Parkino Variance for a chanqe in use from an automobile repair shop to retail at 1204 El Camino Real, Zoned C-1. Broadwav CommercialArea. 1480 Broadwav Propertv LLC. propertv owner. APN: 026-096-180: WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on October 12, 2021, at which time it reviewed and considered the staff report and all other written materials and testimony presented at said hearing; NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that: 1. On the basis of the lnitial Study and the documents submitted and reviewed, and comments received and addressed by this Commission, it is hereby found that there is no substantial evidence that the project set forth above will have a significant effect on the environment, and categorical exemption, per CEQA Section 15301 - Existing facilities, Class 1(a) of the CEQA Guidelines, which states that interior or exterior alterations involving such things as interior partitions, plumbing, and electrical conveyances are exempt from environmental review, is hereby approved. 2. Said Commercial Design Review and Parking Variance are approved subject to the conditions set forth in Exhibit "A" attached hereto. Findings for such Commercial Design Review and Parking Variance are set forth in the staff report, minutes, and recording of said meeting. 3. lt is further directed that a certified copy of this the County of San Mateo. be C ?. uAros Secretary of the Planning Commission of the hereby certify that the foregoing resolution was introduced and adopted at a Planning Commission held on the 12th dav of October, 2021 by t, official records of City of Burlingame, do regular meeting of the the following vote: 1204 ELCAMINO REAL - RESO 2021-10.12€eAYES: COMAROTO, LARIOS, SGHMID, TSENOES: NONE ABSENT GAUL, LOMS RECUSED: TERRONES Secretary EXHIBIT "A" Conditions of Approval for Categorical Exemption, Variance 1204 El Camino Real Effective Oclober 22, 2021 Page 1 Commercial Design Review, and parking 1 that the project shall be built as shown on the plans submitted to the Planning Division date stamped September 20, 202'l , sheets A0.0 through A3.1 ; that prior to issuance of a building permit, the applicant shall apply for and obtain anencroachment permit from the Department of rransportation for any work proposed in thestate right-of-way; that documentation with exhibits showing detailLd project constructionplans including work on the sidewalk, curb and planter s[rip, shall be submitted to theDepartment of rransportation for review and approvar of an encioachment permit; that the landscaping, located in the planter boxes and troughs on private property and in theplanter strip within the state right-of-way, shall be irrigated a-nd maintained in dooo -oer; that prior to issuance of a b-uilding p_ermit, the project applicant shall pay the public lmpactFees in the amount of $7,6s9.81 in fult, payable to the city of Burlingame and submitted tothe Planning Division; that any changes to the size or envelope of the building, which would include changing oradding exterior walls or parapet walls, sharr require an amlndment to this permit; that any changes to building materials, exterior finishes, windows, architectural features, roofheight or pitch, and amount or type of hardscape materials shall be sublect to-iiinningDivision or Planning commission review (Fyl or amendment to be determined by planning staff); that demolition or removal of the existing structures and any grading or earth moving on thesite shall not occur until a building permit has been issued and luch site work inr u"required to comply with all the regulations of the Bay Area Air euality Management District; that prior to issuance of a building permit for construction of the project, the project construction plans shall be modified to include a cover sheet listing all conditions of ajprovatadopted by-the Planning commission, or city council on appeal; ,inich snall r"rrin J6"rt otall sets of -approved plans throughout rhe construciion process. compliance with allcorditions of approval is required; the_ conditions of approval shall not be mod'ified or cirangeowithout the approval of the planning Commission, or City Council on appeal; that the project shall comply with the construction and Demolition Debris RecyclingOrdinance which requires affected demolition, new construction and alteration prol"itr tosubmit a waste Reduction . pran and meet recycring requirements; any far[iar' or turrdemolition of a structure, interior or exterior, sharr require a demorition permit;' that the applicant shall comply with ordinance 1503, the city of Burlingame storm waterManagement and Discharge Control Ordinance; that the project shall meet all the requirements of the California Building and Uniform Firecodes, in effect at the time of buitding permit submittat, as amenaEJ uv tn"- Citv otBurlingame; 2 4 5 b 7 R o 10 11 EXHIBIT'A" conditions'of Approval for categorical Exemption, commercial Design Review, and parking Variance 1204 El Camino Real Effective Oclober 22, 2021 Page 2 THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION: 12. that prior to scheduling the framing inspection, the project architect, engineer or other licensed professional shall provide architectural certification that the architectural details such as window locations and bays are built as shown on the approved plans; if there is no licensed professional involved in the project, the property owner or contractor shall provide the certification under penalty of perjury. Certifications shall be submitted to the Building Department; and 13.that prior to final inspection, Planning Division staff will inspect and note compliance of the architectural details (trim materials, window type, etc.) to verify that the project has been built according to the approved Planning and Building plans.