HomeMy WebLinkAboutReso - PC - 2021.10.12 - 8CDocuSign Envelope lD:'i'l 44276C-21 6E-4AF9-ACA5-1A0't E30AB5DE
RECORDING REQUESTED BY:
Planning Department
City of Burlingame
WHEN RECORDED MAIL TO:
COMMUNITY DEVELOPMENT DEPARTMENT
CITY OF BURLINGAME
501 PRIMROSE ROAD
BURLINGAME, CA 94010
2021-167382
1:15 Pm ntA7l21 R1 Fee: NO FEE
Count of Pages 4
Recorded in Official Records
CountY of San Mateo
Mark Church
r1lr 11 il l1imiil[tililfi [f il{Xfinfi iry[[fli [t ti t
1t
tt t Llr
Resolution No. 2021-10.1 2.21-8c
3 VICTORIA ROAD
029-304-130
TITLE OF DOCUMENT
I hereby certify this to be a full, true and conect copy of the
document it purports to be, the original of which is on file in my
office.
October 2021
k*u,
"IT'DE"
Date:
Kevin Gardiner, AICP, Community Development
4{
RESOLUTION APPROVING CATEGORICAL EXEMPTION AND DESIGN REVIEW
RESOLVED, by the Planning Commission of the City of Burlingame that:
WHEREAS, a Categorical Exemption has been prepared and application has been made for Desion
Review for a new. two-story sinqle familv dwellinq and detached oaraqe at 3 Victoria Road. Zoned R-1,
James Kwan. propertv owner. APN: 029-304-130:
WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on October
12, 2021, at which time it reviewed and considered the staff report and all other written materials and
testimony presented at said hearing;
NOW,
1.
2.
THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that:
On the basis of the lnitial Study and the documents submitted and reviewed, and comments
received and addressed by this Commission, it is hereby found that there is no substantial evidence
that the project set forth above will have a significant effect on the environment, and categorical
exemption, per CEQA Section 15303 (a) of the CEQA Guidelines, which states that construction of a
limited number of new, small facilities or structures, including one single-family residence, or a
second dwelling unit in a residential zone, is exempt from environmental review. ln urbanized areas,
this exemption may be applied to the construction or conversion of up to three (3) single-family
residences as part of a project, is hereby approved.
Said Design Review is approved subject to the conditions set forth in Exhibit "A" attached
hereto. Findings for such Design Reviewis set forth in the staff report, minutes, and recording of
said meeting.
3. lt is further directed that a certified copy of this resolution
the County of San Mateo.
l, R. l.Aietos , secretary of the Plann ing Commission of
hereby certify that the foregoing resolution was introduced and adopted
Planning Commission held on the 1 2th dav of October. 2021
al records of
rperson
the City of Burlingame, do
at a regular meeting of theby the following vote:
3 V|CTORIA RD - RESO 2021-',10.12{c
AYES: COiIAROTO, LARIOS,
SGHMID, TERRONES, TSE
NOES: NONE
ABSENT: GAUL, LOFTIS
REGUSED: NONE
-1
EXHIBIT "A"
Conditions of Approvalfor Categorical Exemption and Design Review
3 Victoria Road
Effeclive October 22, 2021
Page 11. that the project shall be built as shown on the plans submitted to the planning Division date
stamped September 22, 2021, sheets T.0, BMP.1,Sp.1, pW.1, DM.1, A.1 through A.9 and
AD.2l
2. that any changes to building materials, exterior finishes, windows, architectural features, roof
height or pitch, and amount or type of hardscape materials shall be subject to planning
Division or Planning Commission review (Fyl or amendment to be determjned by planning
stafD;
3. that any changes to the size or envelope of the basement, first or second floors, or garage,
which would include adding or enlarging a dormer(s), shall require an amendment to this
permit;
4. that any recycling containers, debris boxes or dumpsters for the construction project shall be
placed upon the private property, if feasible, as determined by the Community Development
Director;
5. that demolition for removal of the existing structures and any grading or earth moving on the
site shall not occur untit a building permit has been issued and such site work ihall be
requjred to comply with all the regulations ofthe Bay Area Air euality Management District;
6. that prior to issuance of a building permit for construction of the project, the pro.iect
construction plans shall be modified to include a cover sheet listing all conditions of approval
adopted by the Planning Commission, or City Council on appeal; which shall remain a part ofall sets of approved plans throughout the construction process. Compliance with all
conditions of approval is required; the conditions of approval shall not be modified or
changed without the approval of the planning Commission, or City Council on appeal;
7. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single
termination and installed on the portions of the roof not visible from the streelr and that th;se
venting details shall be included and approved in the construction plans before a Building
permit is issued;
8 !"!. the project shall compty with the Construction and Demotition Debris Recycling
Ordinance which requires affected demolition, new construction and alteration pro;e&s t6submit a Waste Reduction plan and meet recycling requirementsi any partial-or full
demolition of a structure, interior or exterior, shall require a demolition permiti
9. that the project sharr meet a[ the requirements of the carifornia Buirding and uniform FireCodes, in effect at time of buitding permit submittal, as amended by the Cit of Burtingame;
THE FOLLOWNG CONDITIONS SHALL BE i'ET DURING THE BUILDING INSPECTION
PROCESS PRIOR TO THE INSPECTTONS NOTED tN EACH CONDtTtONi
10. that prior to scheduring the framing inspection the appricant shal provide a certification by theproject architect or residential designer, or another architect or residential d;signprofessional, that demonstrates that the project falls at or below the maximum approved flo-or
area ratio for the property;
EXHIBIT "A"
Conditions of Approvalfor Categorical Exemption and Design Review
3 Victoria Road
Ellective Oclober 22, 2021
Page 211. that prior to scheduling the foundation inspection, a licensed surveyor sha locate the
property corners, set the building footprint and certify the first floor elevation of the new
structure(s) based on the elevation at the top of the form boards per the approved plans; this
survey shall be accepted by the City Engineer;
12 that prior to scheduling the framing inspection the project architect or residential designer, or
another architect or residential design professional, shall provide an architectural certification
that the architectural details shown in the approved design which should be evident at
framing, such as window locations and bays, are built as shown on the approved plans;
architectural certification documenting framing compliance with approved design shall be
submitted to the Building Division before the final framing inspection sha be scheduled;
13.that prior to scheduling the roof deck inspection, a licensed surveyor sha shoot the height of
the roof ridge and provide certification of that height to the Building Division; and
14.that prior to final inspection, Planning Division staff will inspect and note compliance of the
architectural details (trim materials, window type, etc.) to verify that the project has been built
according to the approved Planning and Building plans.