Loading...
HomeMy WebLinkAboutReso - PC - 2021.10.12 - 8BDocuSign Envetope to: 71i276c-2'ioe<Rrg-Rcn5-1A01 E3oAB5DE RECORDING REQUESTED BY: Planning Department City of Burlingame WHEN RECORDED MAIL TO: COMMUNIry DEVELOPMENT DEPARTMENT CITY OF BURLINGAME 501 PRIMROSE ROAD BURLINGAME, CA 94010 2021-167381 1:15 pm 12tolt21 R1 Fee: NO FEE Count of pages 4 Recorded in Official Records County of San Mateo Mark Church ifl rti ltiliiljltiflfl U ilU ilifln[rffifiiflnrr1 rrrlr Resolution No. 2021-10.1 2.21-8b 1617 CHAPIN AVENUE 028-284-060 4( TITLE OF DOCUMENT I hereby certify this to be a full, true and conect copy of the document it purports to be, the original of which is on file in my office. October 2021 !r^^ito hrkwy TY rrUNE 1i: Date: Kevin Gardiner, AICP,nity Development RESOLUTION APPROVING CATEGORICAL EXEMPTION, DESIGN REVIEW, SPECIAL PERMIT AND VARIANCES RESOLVED, by the Planning Commission of the City of Burlingame that WHEREAS, a Categorical Exemption has been prepared and applicat ion has been made for Desion Review. Soeci al Permit for attached qa raqe, and Front and Side Setback Variances for a new attached WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on October 12.2021, at which time it reviewed and considered the staff report and all other written materials and testimony presented at said hearing; NOW, THEREFORE, it is RESOLVED and DETERMINED by this ptanning Commission that: addition to an in famil dwelli at Cha in Aven ed R-1 Karl Bakhtia . orooertv own ers APN'8 -284-060 on the basls of the lnitial study and the documents submitted and reviewed, and comments received and addressed by this Commission, it is hereby found that there is no substantial evidence that the project set forth above wlll have a significant effect on the environment, and categorical exemption, per CEQA Section '15301 (e)(1) of the CEQA Guidelines, which states that additions to existing structures are exempt from environmental review, provided the addition will not result in an increase of more than 50% of the floor area of the structures before the addition, is hereby approved. 1 2 Said Design Review, Special Permit, and Variances are approved subject to the conditions set forth in Exhibit "A" attached hereto. Findings for such Design Review, special permit, and Variances are set forth in the staff report, minutes, and recording of said meeting. It is further directed that a certified copy of this resolution be recorded in the official records of x 3 the County of San Mateo c I, R.TERRoA(E.S , Secretary of the ptanning Commission of the of Burlingame, do hereby certify that the foregoing resolution was introduced and adopted at regular meeting of the the following vote:Planning Commission held on the 12th d av of October , 2021 by ffi scHx D, TSEOES: NOI{E ABSEI{T: GAUL, Loms RECUSEO: TERRONES EXHIBIT "A" conditions of Approval for categorical Exemption, Design Review, special permit, and variances l617 Ghapin Avenue Effective Octobet 22, 202/l Page 11. that the project shall be built as shown on the plans submitted to the Planning Division date stamped September 30, 2021, sheets T1.0, cN, CG, SW, FAR, sheet 1 topographic survey, A1 .0, A1.1 , AR, PH, AB2.0 through A3.3, A5.0, ME2.0 and ME3.0; 2. that any changes to building materials, exterior finishes, windows, architectural features, roof height or pitch, and amount or type of hardscape materials shall be subject to planning Division or Planning Commission review (FYl or amendment to be determined by plannin! staff); 3 that any changes to the size or envelope of the basement, first or second floors, or garage, which would include adding or enlarging a dormer(s), shall require an amendmenito t-hispermit; 4. that any recycling containers, debris boxes or dumpsters for the construction project shall beplaced upon the private property, if feasible, as determined by the Community tjevelopment Director; 5. that demolition for removal of the existing structures and any grading or earth moving on thesite shall not occur until a building permit has been issued and iuch site work inatt berequired to comply with all the regulations of lhe Bay Area Air Quality Management District; 6. that prior to issuance_ of a building permit for construction of the project, the project construction plans shall be modified to include a cover sheet listing all conditions of approvaladopted by the Planning Commission, or City Council on appeal; r,ihich shal remain a part ofall sets of approved. plans throughout the construction' process. Compliance with allconditions of approval is required; the conditions of approval shall not be modified orchanged without the approval of the planning commission, or city counciL on ippeal; 7. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a slngletermination and installed on the portions of the roof not visible from the rir"Li; ,no that theseventing details shall be included and approved in the construction ptani U"for" , Buildingpermit is issued; 8 that the project shall comply with the construction and Demolition Debris RecyclingOrdinance which requires affected demolition, new construction and alteration projects tosubmit a waste Reduction pran and meet recycring requirements; any partiat or rudemolition of a structure, interior or exterior, shall require-a demorition p"irit;' '- 9 tlat the project shall meet all the requirements of the California Building and Uniform Firecodes, in effect at time of building permit submittal, as amended oy tne cily oi aurringame; THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTIONPROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION: '10 that prior to scheduling the framing inspection the applicant shall provide a certification by theproiect architect or residential designer, or another archiiect or. ,esiJentiat oesignprofessional, that demonstrates that the project falls at or below tne maximum approved floorarea ratio for the property; EXHIBIT "A" Conditions of Approval for Categorical Exemption, Design Review, Special permit, and Variances l617 Chapin Avenue Effective Octobet 22, 2021 Page 211. that prior to scheduling the framing inspection the project architect or residential designer, or another architect or residential design professional, shall provide an architectural certification that the architectural details shown in the approved design which should be evident at framing, such as window locations and bays, are built as shown on the approved plans; architectural certification documenting framing compliance with approved design shall be submitted to the Building Division before the final framing inspection shall be scheduled; 12. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of the roof ridge and provide certification of that height to the Building Division; and '13. that prior to final inspection, Planning Division staff will inspect and note compliance of the architectural details (trim materials, window type, etc.) to verify that the project has been built according to the approved Planning and Building plans.