Resolution No. 2021-09. 1 3.21 -8d
225 STANLEY ROAD
029-261-080
TITLE OF DOCUMENT
I hereby certify this to be a full, true and correct copy of the
document it purports to be, the original of which is on file in my
office.
October 2021
&rxiru hrkwt
qrUNE
ut*
Date:
Kevin Gardiner, AICP, Community Development Director
{
{
RESOLVED, by the Planning Commission of the City of Burlingame that
WHEREAS, a categorical Exemption has been proposed and application has been made for
for a stn le famil (retain existing detached garage) at
225 Stan lev Road.zoned R-1 Hieu Bui and C hristina Lee oertv owne rs APN:9-26 -0 80
WHEREAS, said matters were heard by the Planning commission of the city of Burlingame on
september '13, 2021 , at which time it reviewed and considered the staff report and all other
written materials and testimony presented at said hearing;
NOW, THEREFORE, it is RESOLVED and DETERMTNED by this ptanning Commission that:
1. lt is hereby found that the project set forth above is categorically Exempt from
environmental review pursuant to the california Environmental euality Act (cEeA), per
Section 15303 (a) of the CEQA Guidelines, which states that construction of a limited
number of new, small facilities or structures, including one single-family residence, or a
second dwelling unit in a residential zone, is exempt from environmental review. ln
urbanized areas, this exemption may be applied to the construction or conversion of up
to three (3) single-family residences as part of a project.
2. said Design Review is approved subject to the conditions set forth in Exhibit "A"
attached hereto. Findings for such Design Review are set forth in the staff report,
minutes, and recording of said meeting.
It is further directed that a certified copy of
records of the County of San Mateo.
M GUJV
is resolution in the official
t,
Burlingame, do hereby certify that th
regular meeting of the Planning Com
following vote:
ffi
SCHMID. TSENOES: NONE
ABSENT; LAR|OS, TERRO EsREGUSED: CO AROTo
Secretary of the Planning Commission of the City of
e foregoing resolution was introduced and adopted at a
mission held on the 13rh dav of September. 2021 by the
Chai
Secretary
RESOLUTION APPROVING CATEGORICAL EXEMPTION
AND DESIGN REVIEW
?
2
EXHIBIT "A"
Conditions of approval for Categorical Exemption and Design Review
225 Stanley Road
Effective September 23, 202'l
Page 1
1
6.
that the project shall be built as shown on the plans submitted to the Planning Division
date stamped August 25, 2021, sheets T.0 through LS.1;
that any changes to building materials, exterior finishes, windows, architectural features,
roof height or pitch, and amount or type of hardscape materials shall be subject to
Planning Division or Planning Commission review (FYl or amendment to be determined
by Planning staff);
that any changes to the size or envelope of the first floor or garage, which would include
adding or enlarging a dorme(s), shall require an amendment to this permit;
that any recycling containers, debris boxes or dumpsters for the construction project
shall be placed upon the private property, if feasible, as determined by the Community
Development Director;
that demolition for removal of the existing structures and any grading or earth moving on
the site shall not occur until a building permit has been issued and such site work shall
be required to comply with all the regulations of the Bay Area Air Quality Management
District;
that demolition for removal of the existing structures and any grading or earth moving on
the site shall not occur until a building permit has been issued and such site work shall
be required to comply with all the regulations of the Bay Area Air Quatity Management
District;
3.
4
5.
7
I
I
that the project shall meet all the requirements oI the California Buitding and Uniform Fire
Codes, in effect at time of building permit submittal, as amended by the City of
Burlingame;
10
that prior to issuance of a building permit for construction of the project, the project
construction plans shall be modified to include a cover sheet listing all conditions of
approval adopted by the Planning Commission, or City Council on appeal; which shall
remain a part of all sets of approved plans throughout the construction process.
Compliance with all conditions of approval is required; the conditions of approval shall
not be modified or changed without the approval of the Planning Commission, or City
Council on appeal;
that all air ducts, plumbing vents, and flues shall be combined, where possible, to a
single termination and installed on the portions of the roof not visible from the streett and
that these venting details shall be included and approved in the construction plans
before a Building permit is issued;
that the project shall comply with the Construction and Demolition Debris Recycling
Ordinance which requires affected demolition, new construction and alteration projects
to submit a Waste Reduction plan and meet recycling requirementsi any partial or full
demolition of a structure, interior or exterior, shall require a demolition permit;
EXHIBIT ..A"
Conditions of approval for Categorical Exemption and Design Review
225 Stanley Road
Effective September 23, 202{
Page 2
THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION
PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION:
11. that prior to scheduling the foundation inspection, a licensed surveyor shall locate the
property corners, set the building footprint and certify the first floor elevation of the new
structure(s) based on the elevation at the top of the form boards per the approved plans;
this survey shall be accepted by the City Engineer;
12 that prior to scheduling the framing inspection the project architect or residential
designer, or another architect or residential design professional, shall provide an
architectural certification that the architectural details shown in the approved design
which should be evident at framing, such as window locations and bays, are built as
shown on the approved plans; architectural certification documenting framing
compliance with approved design shall be submitted to the Building Division before the
final framing inspection shall be scheduled;
13.
14
that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the
height of the roof ridge and provide certification of that height to the Building Division;
and
that prior to final inspection, Planning Division staff will inspect and note compliance of
the architectural details (trim materials, window type, etc.) to verify that the project has
been built according to the approved Planning and Building plans.