Loading...
HomeMy WebLinkAboutReso - PC - 2021.08.09 - 8ADocuSign El:telope lb: 7 1 4427 6C-21 6E-4AF9-ACA5-1 A01 E3OABSDE RECORDING REQUESTED BY; Planning Department City of Burlingame WHEN RECORDED MAIL TO: COMMUNITY DEVELOPMENT DEPARTMENT CITY OF BURLINGAME 501 PRIMROSE ROAD BURLINGAME, CA 94O,IO 2021-166662 1:21 pm 12106121 R1 Fee: NO FEE Count of Pages 4 Recorded in Official Records County of San Mateo Mark Church I rilr r r ililfmin[iiilr ilfiifiilfi rnii ilili]nfi n ]il il il I ll*$R0003'1 83018$* +(Resolution No. 2021-08.09.21 -8a 833 MAPLE AVENUE 029-033-060 TITLE OF DOCUMENT I hereby certify this to be a full, true and correct copy of the document it purports to be, the original of which is on file in my office. October hxiu" hrktnu o x LTUNE Date: Kevin , AICP, Community Development Director RESOLUTION APPROVING CATEGORIGAL EXEMPTION AND DESIGN REVIEW RESOLVED, by the Planning Commission of the City of Burlingame that: WHEREAS, a Categorical Exemption has been prepared and application has been made for Desiqn Review for a new, two-storv sinqle familv dwellinq and a detached qaraqe at 833 Maple Avenue, Zoned R-1. David Lish, propertv owner, APN: 029-033-060; WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on Auqust 9. 2021, at which time it reviewed and considered the staff report and all other written materials and testimony presented at said hearing; NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that. 1. On the basis of the lnitial Study and the documents submitted and reviewed, and comments received and addressed by this Commission, it is hereby found that there is no substantial evidence that the project set forth above will have a significant effect on the environment, and categorical exemption, per CEQA Section 15303 (a) of the CEQA Guidelines, which states that construction of a limited number of new, small facilities or structures including one single family residence or a second dwelling unit in a residential zone is exempt from environmental review, is hereby approved. 2. Said Design Review is approved subject to the conditions set forth in Exhibit "A" attached hereto. Findings for such Design Review are set forth in the staff report, minutes, and recording of said meeting. 3. lt is further directed that a certified copy of this resolution the County of San Mateo. official records of irman 8.. t AiAtDS Secretary of the Planning Commission of the City of Burlingame, do hereby certify that the foregoing resolution was introduced and adopted at a regular meeting of the Planning Commission held on the 9th dav of Auqust. 2021 by the following vote: 833 MAPLE AVE - RESO 2021{t8.09{a AYES: COilAROTO, LARIOS, LOffiS, SGHUID, TERROI'IES NOES: NONE ABSENT GAUL,TSE RECUSED: NONE I EXHIBIT "A" Conditions of Approval for Categorical Exemption and Design Review 833 Maple Avenue Effective August 19, 2021 Page 1 1 that the project shall be built as shown on the plans submitted to the Planning Division date stamped July 28,2021, sheets T.0, BMP.1, DM.1, SP.'t, PW.1, pW.2, L.1, A.1 through A.5, G.1 through c.3, and AD.2; that any changes to building materials, exterior finishes, windows, architectural features, roof height or pitch, and amount or type of hardscape materials shall be subject to planning Division or Planning commission review (FYl or amendment to be determined by planning staff); that any changes to the size or envelope of the basement, first or second floors, or garage, which would include adding or enlarging a dormer(s), shall require an amendmenito this permit; that any recycling containers, debris boxes or dumpsters for the construction project shall be placed upon the private property, if feasible, as determined by the community tievelopment Director; that demolition for removal of the existing structures and any grading or earth moving on the site shall not occur until a building permit has been issued and iuch site work inatt ue required to comply with all the regulations of the Bay Area Air euality Management District; that prior to issuance of a building permit for construction of the project, the project construction plans shall be modified to include a cover sheet listing all conditions of approval adopted by the Planning commission, or city council on appeal; which shall remain a part ofall sets of approved plans throughout the construction process. compliance with allconditions of approval is required; the conditions of approval shall not be modified or changed without the approval of the planning Commission, or City Council on appeal; that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single termination and installed on the portions of the roof not visible from the sireet; and that thele venting details shall be included and approved in the construction plans before a Building permit is issued; that the project shall comply with the construction and Demolition Debris Recycling ordinance which requires affected demolition, new construction and alteration proleits tosubmit a waste Reduction plan and meet recycling requirements; any partial'or full demolition of a structure, interior or exterior, shall require a demolition permit; that the project shall meet all the requirements of the California Building and Uniform Firecodes, in effect at time of building permit submittal, as amended by the cit-y of Burlingame; b 2 a 4 7 8 I THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION: INSPECTION EXHIBIT "A" Conditions of Approvalfor Categorical Exemption and Design Review 833 Maple Avenue Effective August 19, 2021 Page 2 10 11 12. '13. '14. that prior to scheduling the framing inspection the applicant shall provide a certilication by the project architect or residential designer, or another architect or residential design professional, that demonstrates that the project falls at or below the maximum approved floor area ratio for the property; that prior to scheduling the foundation inspection, a licensed surveyor shall locate the property corners, set the building footprint and certify the first floor elevation of the new structure(s) based on the elevation at the top of the form boards per the approved plans; this survey shall be accepted by the City Engineer: that prior to scheduling the framing inspection the project architect or residential designer, or another architect or residential design professional, shall provide an architectural cerlification that the architectural details shown in the approved design which should be evident at framing, such as window locations and bays, are built as shown on the approved plansi architectural certification documenting framing compliance with approved design shall be submitted to the Building Division before the finalframing inspection shall be scheduled; that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of the roof ridge and provide certification of that height to the Building Division; and that prior to final inspection, Planning Division staff will inspect and note compliance of the architectural details (trim materials, window type, etc.) to verify that the project has been built according to the approved Planning and Building plans.