Loading...
HomeMy WebLinkAboutReso - PC - 2021.05.24 - 8CDocuSign Envelope.tD: 7 1 44276C-216E4AF9-ACAS-1 A0i E3OABsDE RECORDING REQUESTED BY: Planning Department City of Burlingame WHEN RECORDED MAIL TO: COMMUNITY DEVELOPMENT DEPARTMENT CITY OF BURLINGAME 501 PRIMROSE ROAD BURLINGAME, CA 94010 2021-166652 1:19 pm 1206t21 Rl Fee: NO FEE Count of pages 4 Recorded in Official Records County of San Mateo Mark Church i tltii I i iilffl i][ii[r illtfliiltI i]il ilminfiiilil jlil I ill llr* $ R 0 0 0 3 1 S 3 o-o-a-s f- Resolution No. 2021 -05.24-8c 1804 DEVEREUX DRIVE 025-212-170 +( TITLE OF DOCUMENT I hereby certify this to be a full, true and conect mpy of the document it purports to be, the original of which is on file in my office. 0ctober 25,2021 irUNE ,j: Date: Kevin Gardiner, AICP, Community Development Director I b-rrntn" htkuu RESOLUTION APPROVING CATEGORICAL EXEMPTION AND DESIGN REVIEW RESOLVED, by the Planning Commission of the City of Burlingame that: WHEREAS, a Categorical Exemption has been prepared and application has been made for Desion Review for a first and second floor addition to an existinq sinqle family dwellinq at 1804 Devereux Drive. Zoned R-1. Hillarv and Chris Milks, property owners. APN: 025-212-170; WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on Mav 24, 2021, at which time it reviewed and considered the staff report and all other written materials and testimony presented at said hearing; NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that: 1. On the basis of the lnitial Study and the documents submitted and reviewed, and comments received and addressed by this Commission, it is hereby found that there is no substantial evidence that the project set forth above will have a significant effect on the environment, and categorical exemption, per Section 15301 (eX1) of the CEQA Guidelines, which states that additions to existing structures are exempt from environmental review, provided the addition will not result in an increase of more than 50% of the floor area of the structures before the addition, is hereby approved. Said Design Review is approved subject to the conditions set forth in Exhibit "A" attached hereto. Findings for such Design Review are set forth in the staff report, minutes, and recording of said meeting. 2 3. lt is further directed that a certified copy of this resolutio the County of San Mateo. I records of the City of Burlingame, do at a regular meeting of theby the following vote: hereby ce Planning Secretary of the Planning Commission of rtify that the foregoing resolution was introduced and adopted Commission held on the 24th dav of Mav. 2021 1g04_DEVEREUI DR - RESO 202'{rs.24{cAYES: cAUl- UnrOS, r_Offi-- SGHiIID, TSENOES: NONE ABSET{T COTAROTO,TERRONES REGUSED: NONE I l EXHIBIT "A" Conditions of Approval for Categorical Exemption and Design Review 1804 Devereux Drive Effective June 3, 2021 Page 1 1 that the project shall be built as shown on the plans submitted to the Planning Division date stamped May 12, 2021 , sheets A0.0 through A4.0; that the column on the right side of the porch shall match the other porch columns in size, material and shape; that any changes to building materials, exterior finishes, windows, architectural features, roof height or pitch, and amount or type of hardscape materials shall be subject to planning Division or Planning commission review (FYl or amendment to be determined by planning staff); that any changes to the size or envelope of the basement, first or second floors, or garage, which would include adding or enlarging a dormer(s), shall require an amendmenito this permit; that any recycling containers, debris boxes or dumpsters for the construction project shall beplaced upon the private property, if feasible, as determined by the community tievelopment Director; that demolition for removal of the existing structures and any grading or earth moving on the site shall not occur until a building permit has been issued and such site work Ina oe required to comply with all the regulations of the Bay Area Air euality Management District; that prior to issuance of a building permit for construction of the project, the project construction plans shall be modified to include a cover sheet listing all conditions of approval adopted by the Planning commission, or city council on appeal; whicn shalt remain a part ofall sets of approved plans throughout the construction process. compliance with allconditions of approval is required; the conditions of approval shall not be modified or changed without the approval of the planning commission, or city council on appeal; that all air ducts, plumbing vents, and flues shall be combined, where possible, to a singletermination and installed on the portions of the roof not visible from the street; and that theseventing details shall be included and approved in the construction plans before a Buildingpermit is issued; that the project shall comply with the construction and Demolition Debris Recyclingordinance which requires affected demolition, new construction and alteration prolects tosubmit a waste Reduction plan and meet recycling requirements; any partiri'oi ruttdemolition of a structure, interior or exterior, sharl require-a demolition permit;' that the project shall meet all the requirements of the California Building and Uniform Firecodes, in effect at time of building permit submittal, as amended by the cily or griiingar"; 2 3 4 5 b 7 o I IU EXHIBIT "A" Conditions of Approval for Categorical Exemption and Design Review 1804 Devereux Drive Effective June 3, 202't Page 2 THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION: 11. that prior to scheduling the framing inspection the applicant shall provide a certification by the project architect or residential designer, or another architect or residential design professional, that demonstrates that the project falls at or below the maximum approved floor area ratio for the property; 12.that prior to scheduling the foundation inspection, a licensed surveyor shall locate the property corners, set the building footprint and certify the first floor elevation of the new structure(s) based on the elevation at the top of the form boards per the approved plans; this survey shall be accepted by the City Engineer; 13.that prior to scheduling the framing inspection the project architect or residential designer, or another architect or residential design professional, shall provide an architectural certification that the architectural details shown in the approved design which should be evident at framing, such as window locations and bays, are built as shown on the approved plans; architectural certification documenting framing compliance with approved design shall be submitted to the Building Division before the final framing inspection shall be scheduled; 14 that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of the roof ridge and provide certification of that height to the Building Division; and 15 that prior to final inspection, Planning Division staff will inspect and note compliance of the architectural details (trim materials, window type, etc.) to verify that the project has been built according to the approved Planning and Building plans.