HomeMy WebLinkAboutReso - PC - 2021.05.10 - 8BDocuSign Envelope lD.q 1442769-21 6E-4AF9-ACA5-1A01 E3oABSDE
RECORDING REQUESTED BY:
Planning Department
City of Budingame
WHEN RECORDED MAIL TO:
COMMUNITY DEVELOPMENT DEPARTMENT
CITY OF BURLINGAME
501 PRIMROSE ROAD
BURLINGAME, CA 94010
2021-166648
1:'19 pm 12lOOl21 Rl Fee: NO FEE
Count of Pages 4
Recorded in Official Records
County of San Mateo
Mark Church
r mr r r rilflmiilfliiili iliilfi iXfi tnii ilfr i]flilit illt I I lt lt]t$R0003'1 83003$*
Resolution No. 2021-05. 1 0-8b
1110 & 1112 BERNAL AVENUE
026-182-250
+{
I hereby certify this to be a full, true and conect copy of the
document it purports to be, the original of which is on file in my
office.
October 2021
&rr,rt" Arl,i,rrt*
TITLE OF DOCUMENT
.rUNE b
Date:
Kevin Gardiner, AICP, Community Director
RESOLUTION APPROVING CATEGORICAL EXEMPTION, DESIGN REVIEW, CONDITIONAL USE
PERMIT, AND LOT COMBINATION
RESOLVED, by the Planning Commission of the City of Burlingame that:
WHEREAS, a Categorical Exemption has been prepared and application has been made for Desiqn
Review, Conditional Use Permit for re-emerqinq lots, and Lot Combination to create two new lots for
two new two-storv sinqle familv dwellinqs and detached oaraqes at 1110 and 1112 Bernal Avenue.
Zoned R-1.1110 BernalAvenue LLC , propertv owner. APN: 026-182-250:
WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on Mav 10,
2021, at which time it reviewed and considered the staff report and all other written materials and
testimony presented at said hearing;
NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that:
1. On the basis of the lnitial Study and the documents submitted and reviewed, and comments
received and addressed by this Commission, it is hereby found that there is no substantial evidence
that the project set forth above will have a significant effect on the environment, and categorical
exemption, per CEQA Section 15303 (a) of the CEQA Guidelines, which states that
construction of a limited number of new, small facilities or structures including one single family
residence or a second dwelling unit in a residential zone is exempt from environmental review
and in urbanized areas, this exemption may be applied to the construction or conversion of up
to three (3) single-family residences as part of a project, is hereby approved.
2. Said Design Review, Conditional Use Permit and Lot Combination are approved subject to the
conditions set forth in Exhibit "A" attached hereto. Findings for such Design Review,
Conditional Use Permit and Lot Combination are set forth in the staff report, minutes, and
recording of said meeting.
3. lt is further directed that a certified copy of this resoluti
the County of San Mateo.
be recorded records of
t,
Chairm
R.rHh[os Secretary of the Planning Commission of the City of Burlingame, do
hereby certify that the foregoing resolution was introduced and adopted at a regular meeting of the
Planning Commission held on the 10th dav of Mev, 2021 by the following vote:
1110 & 1tr2 BERNALAVE - RESO 2021{15.10{bAYES: COilAROTO,GAUL,I-ARIOS,LOFTISi,
SCHMID, TERRONES, TSENOES: NONE
ABSEI{T: NONE
REGUSED: NONE I
EXHIBIT "A"
Conditions of Approval for Categorical Exemption, Design Review, Conditional Use Permit and Lot
Combination
I I 10 and { I l2 Bernal Avenue
Effective May 20, 2021
Page 1
1 that the project shall be built as shown on the plans submitted to the Planning Division and
date stamped April 20, 2021, sheets A1.0 through A9.0, L'1.0 through L2.5, and Boundary
and Topographic Survey dated October 29,2020 for Lot 16, 1110 Bernal Avenue; and date
stamped April 20, 2021, sheets A1.0 through A9.0, L1.0 through L2.5, and Boundary and
Topographic Survey dated October 29, 2020lor Lol 17 , 1112 Bernal Avenue;
that prior to issuance of a building permit, the applicant shall submit an FYI to include an
updated landscape plan and matching site plan for the project which shows landscaping
along the right side property line for 1110 Bernal Avenue that is agreed upon by the
owner/applicant and by the owner of '1980 Carmelita Avenue;
that any changes to building materials, exterior finishes, windows, architectural features, roof
height or pitch, and amount or type of hardscape materials shall be subject to Planning
Division or Planning Commission review (FYl or amendment to be determined by Planning
staff);
that any changes to the size or envelope of the basement, first or second floors, or garage,
which would include adding or enlarging a dormer(s), shall require an amendment to this
permit;
that any recycling containers, debris boxes or dumpsters for the construction project shall be
placed upon the private property, if feasible, as determined by the Community Development
Director;
that demolition for removal of the existing structures and any grading or earth moving on the
site shall not occur until a building permit has been issued and such site work shall be
required to comply with all the regulations of the Bay Area Air Quality Management District;
that prior to issuance of a building permit for construction of the project, the project
construction plans shall be modified to include a cover sheet listing all conditions of approval
adopted by the Planning Commission, or City Council on appeal; which shall remain a part of
all sets of approved plans throughout the construction process. Compliance with all
conditions of approval is required; the conditions of approval shall not be modified or
changed without the approval of the Planning Commission, or City Council on appeal;
that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single
termination and installed on the portions of the roof not visible from the street; and that these
venting details shall be included and approved in the construction plans before a Building
permit is issued;
2
4
I
b
7
8.
that the project shall comply with the Construction and Demolition Debris Recycling
Ordinance which requires affected demolition, new construction and alteration projects to
submit a Waste Reduction plan and meet recycling requirements; any partial or full
demolition of a structure, interior or exterior, shall require a demolition permit;
EXHIBIT "A"
Conditions of Approval for Categorical Exemption, Design Review, Conditional Use Permit and Lot
Combination
1l{0 and lll2 Bernal Avenue
Effective May 20,2021
Page 2
10.that the project shall meet all the requirements of the California Building and Uniform Fire
Codes, in effect at time of building permit submittal, as amended by the City of Burlingame;
THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION
PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION:
11. that prior to scheduling the framing inspection the applicant shall provide a certification by the
project architect or residential designer, or another architect or residential design
professional, that demonstrates that the project falls at or below the maximum approved floor
area ratio for the property;
12 that prior to scheduling the foundation inspection, a licensed surveyor shall locate the
property corners, set the building footprint and certify the first floor elevation of the new
structure(s) based on the elevation at the top of the form boards per the approved plans; this
survey shall be accepted by the City Engineer;
14 that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of
the roof ridge and provide certification of that height to the Building Division; and
15.that prior to final inspection, Planning Division staff will inspect and note compliance of the
architectural details (trim materials, window type, etc.) to verify that the project has been built
according to the approved Planning and Building plans.
13. that prior to scheduling the framing inspection the project architect or residential designer, or
another architect or residential design professional, shall provide an architectural certification
that the architectural details shown in the approved design which should be evident at
framing, such as window locations and bays, are built as shown on the approved plans;
architectural certification documenting framing compliance with approved design shall be
submitted to the Building Division before the final framing inspection shall be scheduled;