Loading...
HomeMy WebLinkAboutReso - PC - 2021.05.10 - 7ADoc'Sign Envelope lD : 7 1 4427 6C-21 6E-4AF9-ACA5- 1 A0 1 E30AB5DEt- RECORDING REQUESTED BY: Planning Department City of Burlingame WHEN RECORDED MAIL TO: COMMUNITY DEVELOPMENT DEPARTMENT CITY OF BURLINGAME 501 PRIMROSE ROAD BURLINGAME, CA 94010 2A21-1661 13 1:43 Pm 12l}3t2'l R1 Fee: NO FEE Count of Pages 4 Recorded in Official Records CountY of San Mateo Mark Church r11il lt ilrfi[rntiirr[flqffifinqlfli ur;tltUttt U tUr Resolution No. 2021-05. 1 0-7 a 7 LA MESA COURT 027-022-430 TITLE OF DOCUMENT I hereby certify this to be a full, true and conect copy of the document it purports to be, the original of v*rich is on file in my office. October 2021 h^^ir" htknu Date: Kevin Gardiner, AICP, Community Development Director { .IUNE RESOLUTION APPROVING CATEGORICAL EXEMPTION, DESTGN REVIEW, HILLSIDE AREA CONSTRUCTION PERMIT, SPECIAL PERMIT, AND VARIANCE RESOLVED, by the Planning Commission of the City of Burlingame that: WHEREAS, a Categorical Exemption has been prepared and application has been made for Desiqn Review, Hillside Area Construction Permit, Special Permit, and Side Setback Variance to add new attached oaraoe and first floor addition to an existino sinqle familv dwellino at 7 La Mesa Court, Zoned R-1. Tamara Romanek and Ben Patch. propertv owners. APN: 027-022-430; WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on Mav 10, 2021, at which time it reviewed and considered the staff report and all other written materials and testimony presented at said hearing; NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that: 1. On the basis of the lnitial Study and the documents submitted and reviewed, and comments received and addressed by this Commission, it is hereby found that there is no substantial evidence that the project set forth above will have a significant effect on the environment, and categorical exemption, per CEQA Section 15301 (eX1) of the CEQA Guidelines, which states that additions to existing structures are exempt from environmental review, provided the addition will not result in an increase of more than 50% of the floor area of the structures before the addition, is hereby approved. Said Design Review, Hillside Area Construction Permit, Special Permit, and Side Setback Variance are approved subject to the conditions set forth in Exhibit "A" attached hereto. Findings for such Design Review, Hillside Area Construction Permit, Special permit, and Side Setback Variance are set forth in the staff report, minutes, and recording of said meeting. 3. lt is further directed that a certified copy of this resolution the County of San Mateo. Chairperson h.LftRt0s 2 hereby certify that the foregoi Planning Commission held on the 10th dav of Mav, 2021 by cial records of City of Burlingame, do regular meeting of thethe following vote: Secretary of the Planning Commission of the ng resolution was introduced and adopted at a 7 LA ilESA CT - RESO 202t{t5.t0-7aAYES: COilAROTO, GAUL, LAR|OS, LOFT|S, SCHMID, TERRONESNOES: NONE ABSEI{T NONE REGUSED: TSE EXHIBIT "A" Conditions of Approval for Categorical Exemption, Design Review, Hillside Area Construction Permit, Special Permit, and Side Setback Variance 7 La Mesa Gourt Effective May 20, 2021 Page 1 1 that the project shall be built as shown on the plans submitted to the Planning Division date stamped April 8,2021, sheets A001 through 4202; that any changes to building materials, exterior finishes, windows, architectural features, roof height or pitch, and amount or type of hardscape materials shall be subject to planning Division or Planning Commission review (FYl or amendment to be determined by planning staff); that any changes to the size or envelope of the first or second floors, or garage, which would include adding or enlarging a dormer(s), shall require an amendment to this permit; that any recycling containers, debris boxes or dumpsters for the construction project shall be placed upon the private property, if feasible, as determined by the Community Development Director; that demolition or removal of the existing structures and any grading or earth moving on the site shall nol occur until a building permit has been issued and such site work shall be required to comply with all the regulations of the Bay Area Air euality Management District; that prior to issuance of a building permit for construction of the project, the project construction plans shall be modified to include a cover sheet listing all conditions of approval adopted by the Planning Commission, or City Council on appeal; which shall remain a part of all sets of approved plans throughout the construction process. Compliance with all conditions of approval is required; the conditions of approval shall not be modified or changed without the approval of the Planning Commission, or City Council on appeal; that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single termination and installed on the portions of the roof not visible from the street; and that these venting details shall be included and approved in the construction plans before a Building permit is issued; that the project shall comply with the Construction and Demolition Debris Recycling ordinance which requires affected demolition, new construction and alteration projects to submit a Waste Reduction plan and meet recycling requirements; any partial or full demolition of a structure, interior or exterior, shall require a demolition permit; that demolition for removal of the existing structures and any grading or earth moving on the site shall not occur until a building permit has been issued and such site work ihall be required to comply with all the regulations of the Bay Area Air euality Management District; that the project shall meet all the requirements of the California Building and Uniform Fire Codes, in effect at time of building permit submittal, as amended by the City of Burlingame; 2 ? 4 q b 7 t, I THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION PROGESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION: 10. that prior to scheduling the framing inspection the project architect or residential designer, or another architect or residential design professional, shall provide an architectural certification that the architectural details shown in the approved design which should be evident at framing, such as window locations and bays, are built as shown on the approved plans; architectural certification documenting framing compliance with approved design shall be submitted to the Building Division before the final framing inspection shall be scheduled; and 11.that prior to final inspection, Planning Division staff will inspect and note compliance of the architectural details (trim materials, window type, etc.) to verify that the project has been built according to the approved Planning and Building plans. EXHIBIT "A" Conditions of Approval for Categorical Exemption, Design Review, Hillside Area Construction Permit, Special Permit, and Side Setback Variance 7 La Mesa Gourt Effective May 20,2021 Page 2