HomeMy WebLinkAboutReso - PC - 2021.04.26 - 8BDocuSign Ee ;elope lD: 7 1 44276C-21 6E-4AF9-ACA5-1A01 E30AB5DE
RECORDING REQUESTED BY:
Planning Department
City of Burlingame
WHEN RECORDED MAIL TO:
COMMUNITY DEVELOPMENT DEPARTMENT
CITY OF BURLINGAME
501 PRIMROSE ROAD
BURLINGAME, CA 94010
2021-166112
1:43 pm 12t03t21 R1 Fee: NO FEE
Count of pages 4
Recorded in Official Records
County of San Mateo
Mark Church
t1lt1 ilflqtltiflfl
U
ilryflrryU fr
[r
ilqnrry tllr
Resolution No. 2021 -04.26-8b
1320 MILLS AVENUE
026-071-150
TITLE OF DOCUMENT
I hereby certify this to be a full, true and correct copy of the
document it purports to be, the original of which is on file in my
office.
October 2021
&r^rrr," hrktut s
du&r-E
Date:
Kevin Gard iner, AICP, Community Development Director
f
RESOLUTION APPROVING CATEGORICAL EXEMPTION AND DESIGN REVIEW
RESOLVED, by the Planning Commission of the City of Burlingame that:
WHEREAS, a Categorical Exemption has been prepared and application has been made for Desion
Review for a new, two-storv sinqle familv dwellinq (existinq detached qaraqe to remain) at 1320 Mills
Avenue, Zoned R-1, Robert Amiio and Yunqtinq Liao. propertv owners. APN: 026-071-150;
WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on
Aoril26th,2021, at which time it reviewed and considered the staff report and all other written materials
and testimony presented at said hearing;
NOW,
1.
hereby certify that the foregoi
Planning Commission held
2 Said Design Review is approved subject to the conditions set forth in Exhibit "A" attached
hereto. Findings for such Design Review are set forth in the staff report, minutes, and recording
of said meeting.
3. lt is further directed that a certified copy of this resolution be recorded in the official records of
the County of San Mateo.
rson
THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that:
On the basis of the lnitial Study and the documents submitted and reviewed, and comments
received and addressed by this Commission, it is hereby found that there is no substantial
evidence that the project set forth above will have a significant effect on the environment, and
categorical exemption, per Section 15303 (a), which states that construction of a limited
number of new, small facilities or structures including one single family residence or a second
dwelling unit in a residential zone is exempt from environmental review. ln urbanized areas, up
to three single-family residences maybe constructed or converted under this exemption, is
hereby approved.
f-s0,tlM tb Secretary of the Planning Commission of the City of Burlingame, do
ng resolution was introduced and adopted at a regular meeting of theon the 26th dav of April. 2021 by the following vote:
ll4utLLS AVE - RESO r02AYES: COilAROTO, CIUL l-OfffS, SARGET{I
SCHiIID, TSENOES: NONE
ABSENT NONE
REGUSED: TERRONES
Secretary
-t
EXHIBIT "A"
Conditions ofApprovalfor Categorical Exemptjon and Design Review
1320 Mills Avenue
Effective May 6, 2020
Page 1
2.
3
that the project 6hall be built as shown on the plans submitted to the Planning Division date
stamped March 24, 2021, sheets A101.1 through A105.1 and sheets A100 and 4101 date
stamped April 14, 2021;
that any changes to building materials, exterior finishes, windows, architectural features, roof
height or pitch, and amount or type of hardscape materials shall be subject to planning
Division or Planning Commission review (FYl or amendment to be determined by planning
stafO;
that any changes to the size or envelope of the basement, first or second floors, or garage,
which would include adding or enlarging a dormer(s), shall require an amendment to this
permit;
that any recycling containers, debris boxes or dumpsters for the construction project shall be
placed upon the private property, if feasible, as determined by the Community Development
Director:
that demolition for removal of the existing structures and any grading or earth moving on the
site shall not occur until a building permit has been issued and such site work ahall be
required to comply with all the regulations of the Bay Area Air Quality Management Districi;
that prior to issuance of a building permit for construction of the project, the project
construction plans shall be modified to include a cover sheet listing all conditions of approval
adopted by the Planning Commission, or City Council on appeal; which shall remain a pad ofall sets of approved plans throughout ihe construction process. Compliance with all
conditions of approval is required; the conditions of approval shall not be modified or
changed without the approval of the Planning Commission, or City Council on appeal;
that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single
termination and installed on the portions of the roof not visible from the street; and that these
venting details shall be included and approved in the construction plans before a Building
permjt is issued;
that the project shall comply with the Construction and Demolition Debris Recycling
Ordinance which requires affected demolition, new construction and alteration proje;ts t;
submit a Waste Reduction plan and meet recycling requirements; any partial or full
demolition of a structure, interior or exterior, shall require a demolition permit;
that the project shall meet all the requirements of the California Building and Uniform Fire
Codes, in effect at time of building permit submittal, as amended by the Cit of Burlingame;
4
6
7
8
I
THE FOLLOWNG CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION
PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION:
EXHIBIT "A"
Conditions ofApprovalfor Categorical Exemption and Design Review
1320 Mills Avenue
Effective May 6, 2020
Page 2
10
11
12
14
that prior to scheduling the framing inspection the applicant shall provide a certification by the
project architect or residential designer, or another architect or residential design
professional, that demonstrates that the project falls at or below the maximum approved floor
area ratio for the propertyi
that prior to scheduling the foundation inspection, a licensed surveyor shall locate the
property corners, set the building lootprint and certify the first floor elevation of the new
structure(s) based on the elevation at the top of the form boards per the approved plans; this
survey shall be accepted by the City Engineer:
that prior to scheduling the framing inspection the project architect or residential designer, or
another architect or residential design professional, shall provide an architectural certification
that the architectural details shown in the approved design which should be evident at
framing, such as window locations and bays, are built as shown on the approved plans;
architectural certification documenting framing compliance with approved design shall be
submitted to the Building Division before the final framing inspection shall be scheduled;
that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of
the roof ridge and provide certification of that height to the Building Division; and
that prior to final inspection, Planning Division staff will inspect and note compliance of the
architectural details (trim materials, window type, etc.) to verify that the project has been built
according to the approved Planning and Building plans.