HomeMy WebLinkAboutReso - PC - 2021.03.22 - 8B"
DocuSigq Envelope lD: 7 14276C-2tOe+efg-RCn5-1A01 E3OABSDE
RECORDING REQUESTED BY
Planning Department
City of Burlingame
WHEN RECORDED MAIL TO:
COMMUNITY DEVELOPMENT DEPARTMENT
CITY OF BURLINGAME
501 PRIMROSE ROAD
BURLINGAME, CA 94010
2021-166104
1:43 pm 12l03l2'l Rl Fee: NO FEE
Count of Pages 4
Recorded in Official Records
County of San Mateo
Mark Church
Assessor-County Clerk-Recorder
r illl il il]ilil ilil ilil ilil ililililililililililil ]ilililil ilil ll]* $ R 0 0 0 3 1 8 2 3 q-o- s"'f-'
,$
Resolution No. 2021 -03.22-8b
1327 BENITO AVENUE
APN 027-194-020
TITLE OF DOCUMENT
I hereby certify this to be a full, true and correct copy of the
document it purports to be, the original of which is on file in my
office.
October 2021
&.,ritn" hrkwr
bri,UHE
Date:
Kevin Gardiner, AICP, Community Development
RESOLUTION APPROVING CATEGORICAL EXEMPTION, DESIGN REVIEW, & SPECIAL PERMIT
RESOLVED, by the Planning Commission of the City of Burlingame that:
WHEREAS, a Categorical Exemption has been prepared and application has been made for Desiqn
Review and Special Permit for buildino heioht for a new. two-storv sinsle familv dwellinq and detached
garaqe at 1327 Benito Avenue, Zoned R-1. Joseph Hassoun and Mavssoun Alhariri, propertv owners,
APN: 027-194-020;
WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on March
22,2021, atwhich time it reviewed and considered the staff report and all otherwritten materials and
testimony presented at said hearing;
NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that:
1. On the basis of the lnitial Study and the documents submitted and reviewed, and comments
received and addressed by this Commission, it is hereby found that there is no substantial
evidence that the project set forth above will have a significant effect on the environment, and
categorical exemption, per CEQA Section 15303 (a), which states that construction of a limited
number of new, small facilities or structures including one single family residence or a second
dwelling unit in a residential zone is exempt from environmental review. ln urbanized areas, up
to three single-family residences may be constructed or converted under this exception, is
hereby approved.
2. Said Design Review and Special Permit are approved subject to the conditions set forth in
Exhibit "A" attached hereto. Findings for such Design Review and Special Permit are set forth
in the staff report, minutes, and recording of said meeting.
3. lt is further directed that a certified copy of this resolution be recorded in the official records of
the County of San Mateo
Chairperson
5-SC,T+MID Secretary of the Planning Com mtssron of the City of Burlingame, dot,
hereby certify that the foregoing resoluti
Planning Commission held on the
on was introduced and adopted at a regular meeting of the
22nd dav of March, 2021 by the following vote:
132J BEi{!TOAVE - RESO 2021{r3.22{bAYES: COilAROTO, eruU+Omq SARGENL
SGHTID, TERRo]tIEs, TSENOES: NONE
ABSENT: NONE
REGUSED: NONE
4
6
8.
I
that any recycling containers, debris boxes or dumpsters for the construction project shall be
placed upon the private property, if feasible, as determined by the Community Development
Director; that demolition or removal of the existing structures and any grading or earth
moving on the site shall not occur until a building permit has been issued and such site work
shall be required to comply with all the regulations of the Bay Area Air Quality lvlanagement
District:
that prior to issuance of a building permit for construction of the project, the project
construction plans shall be modified to include a cover sheet listing all conditions of approval
adopted by the Planning Commission, or City Council on appeal; which sha remain a part of
all sets of approved plans throughout the construction process. Compliance with all
conditions of approval is required; the conditions of approval shall not be modified or
changed without the approval of the Planning Commission, or City Council on appeal;
7
that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single
termination and installed on the portions of the roof not visible from the street; and that these
venting details shall be included and approved in the construction plans before a Building
permit is issued;
that the project shall meet all the requirements of the California Buitding and Uniform Fire
Codes, in effect at time of building permit submittal, as amended by the City of Burlingame;
EXHIBIT "A"
Conditions ofApprovalfor Categorical Exemption, Design Review, and Special Permit
1327 Benito Avenue
Effective April l, 2021
Page 'l
'1. that the project shall be built as shown on the plans submitted to the Planning Division date
stamped March 15, 2021, sheets A.1 through A.9, N.1, L.1, and survey;
2. that any changes to building materials, exterior finishes, windows, architectural features, roof
height or pitch, and amount or type of hardscape materials shall be subject to Planning
Division or Planning Commission review (FYl or amendment to be determined by Planning
staff);
3. that any changes to the size or envelope of the first or second floors, or garage, which would
include adding or enlarging a dormer(s), shall require an amendment to this permit;
that the project shall comply with the Construction and Demolition Debris Recycling
Ordinance which requires affected demolition, new construction and alteration projects to
submit a Waste Reduction plan and meet recycling requirements, any partial or full
demolition of a structure, interior or exterior, shall require a demolition permit;
that demolition for removal of the existing structures and any grading or earth moving on the
site shall not occur until a building permit has been issued and such site work shall be
required to comply with all the regulations of the Bay Area Air Quality Management District;
EXHIBIT "A"
Conditions ofApproval for Categorical Exemption, Design Review, and Special Permit
1327 Benito Avenue
Effective April 1, 2021
Page 2
THE FOLLOWNG CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION
PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION:
10.that prior to scheduling the framing inspection the applicant shall provide a certification by the
project architect or residential designer, or another architect or residential design
professional, that demonstrates that the project falls at or below the maximum approved floor
area ratio for the property;
11
12
13
14
that prior to scheduling the foundation inspection, a licensed surveyor shall tocate the
property corners, set the building footprint and certify the firslfloor elevation of the new
structure(s) based on the elevation at the top of the form boards per the approved plans; this
survey shall be accepted by the c y Engineer:
prior to scheduling the framing inspectaon the project architect or residential designer, or
another architect or resadential design professional, shall provide an architectural certiflcation
that the architectural details shown in the approved design which should be evident at
framing, such as window locations and bays, are built as shown on the approved plans;
architectural certification documenting framing compliance with approved design shall be
submitted to the Building Division before the finalframing inspection shall be scheduted;
prior to scheduling the framing inspection the project architect or residential designer, or
another architect or residential design professional, shall provide an architectural certification
that the architectural certification that the architectural details shown in the approved design
which should be evadent at framing, such as window locations and bays, are built as shown
on the approved plans; architectural certification documenting framing compliance with
approved design shall be submitted to the Building Division before the final framing
inspection shall be scheduled; and
that prior to final inspection, Planning Division staff will inspect and note comptiance of the
architectural details (trim materials, window type, etc.) to verify that the project has been built
according to the approved Planning and Bullding plans.