HomeMy WebLinkAboutReso - PC - 2021.03.22 - 8ADocuSign.Svelope iD: 7 1 44276}-216E4AF9-AoA5-1 Aol E30AB5DE
RECORDING REQUESTED BY:
Planning Department
City of Burlingame
WHEN RECORDED MAIL TO:
COMMUNITY DEVELOPMENT DEPARTMENT
CITY OF BURLINGAME
501 PRIMROSE ROAD
BURLINGAME, CA 94010
2A21-166103
1:43 pm 12103121 R1 Fee: NO FEE
Count of Pages 4
Recorded in Official Records
County of San Mateo
Mark Church
Assessor-Cou nty Clerk-Recorder
ililil ililIilil ililll]il ilil lilll ililillill illll lllll llll llil l l lll llll*$R0003182345$*
Resolution No. 2021 -03.22-8a
509 BURLINGAME AVENUE
APN 029-254-040
TITLE OF DOCUMENT
I hereby certify this to be a full, true and correct copy of the
document it purports to be, the original of which is on file in my
office.
October 25 2021
&r.r,^rtn hrkut
B!'ftrrrsss.ME
irUNE
Date:
Kevin Gardiner, AICP, Community Development Director
{
RESOLUTION APPROVING CATEGORICAL EXEMPTION AND DESIGN REVIEW
RESOLVED, by the Planning Commission of the City of Burlingame that:
WHEREAS, a Categorical Exemption has been prepared and application has been made for Desion
Review for a first and second storv addition to an existinq sinqle familv dwellino at 50g Burlinqame
Avenue. Zoned R-1. Brian Ament and Sara Ponzio. propertv owners. APN: 029-2S4-O4O;
WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on
March 22. 2021, at which time it reviewed and considered the staff report and all other written materials
and testimony presented at said hearing;
NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that:
1. On the basis of the lnitial Study and the documents submitted and reviewed, and comments
received and addressed by this Commission, it is hereby found that there is no substantial evidence
that the project set forth above will have a significant effect on the environment, and categorical
exemption, per CEQA Section 15301 (eX2), which states that additions to existing structures
are exempt from environmental review, provided the addition will not result in an lncrease of
more than 10,000 SF in areas where all public services and facilities are available and the area
in which the project is located is not environmentally sensitive, is hereby approved.
2. Said Design Review is approved subject to the conditions set forth in Exhibit "A" attached
hereto. Findings for such Design Review are set forth in the staff report, minutes, and recording
of said meeting.
3. lt is further directed that a certified copy of this resolution be recorded in the official records of
the County of San Mateo
ChairmanI SCT+I4 ID Secretary of the Planning Commission the City of Burlingame, do
hereby certify that the foregoing
Planning Commission held o
resolution was introduced and adopted at a regular meeting of then the 22nd dav of March, 2021.by the following vote
809 BURLIN9AIEAvE - REso 202i{t3.22{aAYES: COi|AROTO, GAUL, rcfnS
SGHIID, TERRONES, TSENOES: NONE
ABSENT NONE
RECUSED: SARGEI{T
Secretary
EXHIBIT "A"
Conditions of Approval for Categorical Exemption and Design Review
509 Burlingame Avenue
Effective Aptil 1, 2021
Page 1
1 that the project shall be built as shown on the plans submitted to the Planning Division date
stamped February 9, 2021, sheets A-1 through A-6 and L-1;
that any changes to building materials, exterior finishes, windows, architectural features, roof
height or pitch, and amount or type of hardscape materials shall be subject to Planning Division
or Planning commission review (Fyl or amendment to be determined by planning staifl;
that any changes to the size or envelope of the first or second floors, or garage, which would
include adding or enlarging a dormer(s), shall require an amendment to thii pei-nit;
that the conditions of the Building Division's February 23, 2021 memo, the parks Division'sFebruary 23, 2021 memo, the Engineering Divisionrs February 1l, 2021 memo, and the
Stormwater Division's February 24,2021 memo shall be met;
that any recycling containers, debris toxes or dumpsters for the construction project shall beplaced upon the private property, if feasible, as determined by the communiiy 6evelopment
Director;
that demolition or removal of the existing structures and any grading or earth moving on thesite shall not occur until a building permit has been issued and iuch s-ite work shalt be iequiredto comply with all the regulations of the Bay Area Air euarity Management Districl - -
that prior to issuance of a building permit for construction of the project, the project constructionplans shall be modified to include a cover sheet listing all conditioni ot rppriirai
"Jopt"J oy tn"Planning commission, or city council on appeal; wnich snall remain'a part oi arr sets otapproved. plans throughout the construction process. Compliance with';lL conOitions otapproval is required, the conditions of approval shall not be modified o1. cn"nleo ,ritnout tt"approval of the Planning Commission, or City Council on appeal;
that all air ducts, plumbing vents, and flues sha be combined, where possible, to a singletermination and installed on the portions of the roof not visible from the rir""t;-.no-in"t tn"."venting details shall be incruded and approved in the construction prans before a Buirdingpermit is issued;
that the project shall comply with the Construction and Demolition Debris Recycling ordinancewhich requires affected demolition, new construction and alteration pro1""t. to',ro"r[ a=wasteReduction plan and meet recycling requirements; any partial or fuli oemotition oi a structure,interior or exterior, shall require a demolition permit; ' '
that the project shall meet all the requirements of the California Building and Uniform Firecodes, in effect at time of buirding permit submittar, as amended uy tnJ City"oieurri"g";",
2
4
7
o
o
10
EXHIBIT "A"
Conditions of Approval for Categorical Exemption and Design Review
509 Burlingame Avenue
Effective April 1, 2021
Page 2
11. that prior to scheduling the framing inspection the applicant shall provide a certification by the
project architect or residential designer, or another architect or residential design professibnal,
that demonstrates that the project falls at or below the maximum approved floor area ratio for
the property;
12. prior to scheduling the framing inspection the project architect or residential designer, or
another architect or residential design professional, shall provide an architectural certification
that the architectural details shown in the approved design which should be evident at framing,
such as window locations and bays, are built as shown on the approved plans, architecturil
certification documenting framing compliance with approved design shall be submitted to the
Building Division before the final framing inspection shall be scheduled;
13 that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of
the roof ridge and provide certification of that height to the Buirding bivision; and
14. that.prior to final inspection, Planning Division staff will inspect and note compliance of the
architectural details (kim materials, window type, etc.) to verify that the project has been built
according to the approved Planning and Building plans.
THE FOLLOWNG CONDITIONS SHALL BE MET DURING THE BUILDING INSPEGTION PROCESS
PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION: