HomeMy WebLinkAboutReso - PC - 2021.02.22 - 8ADocuSign Envelooc lD: 7 1 44276C-21 6E-4AF9-ACA5-1 A01 E30AB5DE
RECORDI NG REQUESTED BY:
Planning Department
City of Burlingame
WHEN RECORDED MAIL TO:
COMMUNITY DEVELOPMENT DEPARTMENT
CITY OF BURLINGAME
501 PRIMROSE ROAD
BURLINGAME, CA 94010
2021-165592
2:29 pm 12li2l2'l R1 Fee: NO FEE
Count of Pages 4
Recorded in Official Records
County of San Mateo
Mark Church
Assessor-Cou nty Clerk-Recorder
i lllil l illlill ilffiilflililil illiliilil]lillilillill ]ililil il 11ililt*$R0003181747$*
4f
Resolution No. 2021 -02.22-Ba
1037 CORTEZ AVENUE
APN 026-166-030
TITLE OF DOCUMENT
I hereby certify this to be a full, true and correct copy ofthe
document it purports to be, the original of which is on file in my
office.
October 2021
hr.iru
€trfiry.oqs$.ifE
rrUNE o
Date:
Kevin Gardiner, Al , Community Development
RESOLUTION APPROVING CATEGORICAL EXEMPTION AND DESIGN REVIEW
RESOLVED, by the Planning Commission of the City of Burlingame that:
WHEREAS, a Categorical Exemption has been prepared and application has been made for Desiqn
Review for a new, two-storv sinqle familv dwellino and detached oaraoe at 1037 Cortez Avenue, Zoned
R-1, Elizabeth and Keith Tavlor, propertv owners. APN: 026-166-030;
WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on
Februarv 22, 2021, at which time it reviewed and considered the staff report and all othJr written
materials and testimony presented at said hearing;
NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that:
On the basis of the lnitial Study and the documents submitted and reviewed, and comments
received and addressed by this Commission, it is hereby found that there is no substantial evidence
that the project set forth above will have a significant effect on the environment, and categorical
exemption, per CEQA Section 15303 (a) of the CEQA Guidelines, which statei that
construction of a limited number of new, small facilities or structures including one single family
residence or a second dwelling unit in a residential zone is exempt from environmental review,
is hereby approved.
2. Said Design Review is approved subject to the conditions set forth in Exhibit "A" attached
hgreto. Findings for such Design Review are set forth in the staff report, minutes, and recording
of said meeting.
1
3. lt is further directed that a certified copy of this resolution be
the County of San Mateo.
-r.>e}{ut5
in the official records of
irman
hereby certify that the foregoi
Planning Commission held
Secretary of the Planning Commission of the
ng resolution was introduced and adopted at aon the 22nd dav of February, 2021 by
City of Burlingame, do
regular meeting of the
the following vote:
1037 CORTEZAVE - RESO 2021{t2.22€aAYES: COilAROTO, GAUL, LOffS
SCHMID, TERRoTiIES, TSENOES: NONE
ABSENT SARGENT
RECUSED: NONE
EXHIBIT "A"
Conditions of Approvalfor Categorical Exemption and Design Review
,037 Cortez Avenue
Effective March 4, 2021
Page 1
I that the pro.ject shall be built as shown on the plans submitted to the planning Division date
stamped February 10, 2021, sheets A0 through A4, Ll and C1.0; and that the Certified
Arborist report for the street tree shall be submitted to the Building Division for review and
approval by the City Arborjst prior to the removal of any street treesl
2 that any changes to building materials, exterior finishes, windows, architectural features, roof
height or pitch, and amount or type of hardscape materiats shall be subject to planning
Division or Planning Commission review (FYl or amendment to be determined by planning
staff);
that any changes to the size or envelope of the basement, first or second floors, or garage,
which would include adding or enlarging a dorme(s), shall require an amendment to this
permit;
that any recycling containers, debris boxes or dumpsters for the construction project shall be
placed upon the private property, if feasible, as determined by the Community Development
Director:
that demolition for removal of the existing structures and any grading or earth moving on the
site shall not occur until a building permit has been issued and such site work shall be
required to comply with all the regulations ofthe Bay Area Ajr euality Management District;
that prior to issuance of a building permit for construction of the project, the project
construction plans shall be modified to include a cover sheet listing all conditions of approval
adopted by the Planning Commission, or City Council on appeal; which shall remain a part ofall sets of approved plans throughout the construction process. Compliance with all
conditions of approval is required; the conditions of approval shall not be modified or
changed without the approval ofthe Planning Commission, or City Council on appeal;
that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single
termination and installed on the portions of the roof not visible from the street; and that thele
venting details shall be included and approved in the construction plans before a Building
permit is issued;
that the project shall comply with the Conslruction and Demolition Debris Recycling
Ordinance which requires affected demolition, new construction and alteration projects to
submit a Waste Reduction plan and meet recycling requirements; any partial or full
demolition of a structure, interior or exterior, shall require a demolition permit;
that the project shall meet all the requirements of the California Buitding and Uniform Fire
Codes, in effect at time of building permit submittal, as amended by the City of Burlangame;
3
4.
5
6
7
I
9
EXHIBIT "A"
Conditions of Approval for Categorical Exemption and Design Review
1037 Cortez Avenue
Effective March 4, 2021
Page 2
THE FOLLOWNG CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION
PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION:
10. that prior to scheduling the framing inspection the applicant sha provide a certification by the
project architect or residential designer, or another architect or residential design
professional, that demonstrates that the project falls at or below the maximum approved floor
area ratio for the propertyi
11
12
13
14
that prior to scheduling the foundation inspection, a licensed surveyor shall locate the
property corners, set the building footprint and certify the first floor elevation of the new
structure(s) based on the elevation at the top of the form boards per the approved plans; this
survey shall be accepted by the City Engineeri
that prior to scheduling the framing inspection the project architect or residential designer, or
another architect or residential design professional, shall provide an architectural certification
that the architectural details shown in the approved design which should be evident at
framing, such as window locations and bays, are built as shown on the approved plans;
architectural certification documenting framing compliance with approved design shall be
submitted to the Building Division before the final framing inspection shall be scheduled;
that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of
the roof ridge and provide certification of that height to the Buitding Division; and
that prior to final inspection, Planning Division staff will inspect and note compliance of the
architectural details (trim materials, window type, etc.) to verify that the project has been built
according to the approved Planning and Building plans.