RESOLUTION NO 056-2022
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BURLINGAME APPROVING
THE FY 2022-23 STREET RESURFACING PROJECT TO COMPLY WITH
SENATE BILL 1
WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter
5, Statutes of 2017) was passed by the Legislature and signed into law by the Governor in April
2017 to address the significant multi -modal transportation funding shortfalls statewide; and
WHEREAS, SB 1 includes accountability and transparency provisions that will ensure the
residents of Burlingame are aware of the projects proposed for funding in the community and
which projects have been completed each fiscal year; and
WHEREAS, the City must adopt by resolution a list of projects proposed to receive fiscal
year funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1,
which must include a description and the location of each proposed project, a proposed schedule
for the project's completion, and the estimated useful life of the improvement; and
WHEREAS, the City, will receive an estimated $658,699 in RMRA funding in Fiscal Year
2022-23 from SB 1; and
WHEREAS, this is the sixth year in which the City is receiving SB 1 funding, which will
enable the City to continue essential road maintenance and rehabilitation projects, safety
improvements, repairing and replacing aging bridges, and increasing access and mobility options
for the traveling public that would not have otherwise been possible without SB 1; and
WHEREAS, the City has undergone a robust public process to ensure public input into
the community's transportation priorities/project list as part of the capital improvements program;
and
WHEREAS, the City used a Pavement Management System to develop the SB 1 project
list to ensure revenues are being used on the most high -priority and cost-effective projects that
also meet the community's priorities for transportation investment; and
WHEREAS, the funding from SB 1 will help the City maintain and rehabilitate 9 streets
throughout Burlingame this year; and
WHEREAS, the 2018 California Statewide Local Streets and Roads Needs Assessment
found that the City's streets and roads are in "good" condition, and this revenue will help increase
the overall quality of the road system and over the next decade will keep the streets and roads in
"good" condition; and
WHEREAS, the SB 1 project list and overall investment in our local streets and roads
infrastructure with a focus on basic maintenance and safety, will have significant positive benefits
to the residents of Burlingame.
DocuSign Envelope ID: 6BB48008-4C40-4D7A-9B8F-F98764F10B06
NOW, THEREFORE IT IS HEREBY RESOLVED, ORDERED AND FOUND by the City Council
of the City of Burlingame, State of California, as follows:
1. The foregoing recitals are true and correct.
2. The 2023 Street Resurfacing Project will be funded in part with the Fiscal Year 2022-23
Road Maintenance and Rehabilitation Account revenues.
3. The particulars of the project are as follows:
Project Title: 2023 Street Resurfacing Project.
Project Description: The work consists of street base failure repair and resurfacing on
various streets within the city limit. Construction activities will include asphalt concrete
"dig -out" repairs, surface milling, asphalt concrete overlay, traffic markings, traffic striping,
concrete improvements, and other related work.
Project Location: The project streets include Adeline Drive, Airport Boulevard, Bayshore
Highway, Broadway, Burlingame Avenue, Donnelly Avenue, Guittard Road, Gilbreth
Road, and North Carolan Avenue, as depicted on the map attached hereto as Exhibit A.
Estimated Project Schedule: Start construction July of 2023 and completion in March of
2024 with the construction phase of the project funded by RMRA funds.
Estimated Project Useful Life: The City's Pavement Management System calculates a
new useful life of 24 years for these resurfaced roadways.
4. The City Council of the City of Burlingame hereby approves the FY 2022-23 Street
Resurfacing Project to comply with Senate Bill 1.
Ricardo Ortiz, Mayor
I, Meaghan Hassel -Shearer, City Clerk of the City of Burlingame, do hereby certify that the
foregoing Resolution was introduced at a regular meeting of the City Council held on the 6t" day
of June, 2022, and was adopted thereafter by the following vote:
AYES: COUNCILMEMBERS: BEACH, BROWNRIGG, COLSON, O'BRIEN KEIGHRAN, ORTIZ
NOES: COUNCILMEMBERS: NONE
ABSENT: COUNCILMEMBERS: NONE
Meaghan Hassel -Shearer, City Clerk
DocuSign Envelope ID: 6BB48008-4C40-4D7A-9B8F-F98764F10B06
2023 STREET RESURFACING PROJECTS
PROJECT MAP
% \ 5
R
vggq \\
EDO WAY
TOWN OF HILLBOROUGH
PROJECT STREET TO BE RESURFACED
■■■■■■■■■■■ PAVEMENT SECTION REPAIRS ONLY
SAN FRANCISCO BAY
�ORrBLVo- A�RPORt9L
PRIVATEROAD—
�qy �
m
MANNEL-- l
Bq VSI{ORf
FRE 54NCHE2 CREEKOH4NNEL
— ROL-ARD _ _A EFRE__ \\
�FN � cy0
4� \
N.T.S.
File: H:\140-Burlingame\140-079 Burlinggame 2022 Street Resurface\Engineering\Exhibits\2023 PROJECT MAP.dwg Plotted: 5-05-22 @ 01:09:35 PM By: pbusinger