HomeMy WebLinkAboutReso - CC - 014-1951RESOLUTION NO. 14-51
AUTHORIZING AND DIRECTING THE EXPENDITURE
OF FUNDS IUR ADETTIONAL WORK TO BE DONE AT
THE SEWAGE DISPOSAL PIANT.
WHEREAS, the consulting engineer and the city engineer
have recommended to the City Council that certain adcl tions
to the Sewage Plant enlargement be provided for mhile the work
is in progress and,
WHEREAS, it appears that the cost of doing the extra
work will come well within the fluids provided for carrying
on the extension improvement;
NOW, therefore, be it r esolved and it is hereby
directed that the additional work be done as suggested by the
consulting engineer and the city engineer as an extra to the
contract, and that the same be paid for out of the avEi lable
funds set apart for the entire project;
Be it further resolved that the work herein referred
to is set forth in the attached exhibit made a part hereof.
,-,�194tX 4 C- L
Dan R—move, Jr. -117layor
I, HERBERT K. WHITE, City Clerk, do hereby certify
.t the forel-oing resolution was introduced and adopted
a regular meeting of the City Council held on the 5th
of February, 1951, by the following vote:
AYES: COUNCIL1,MT: Atwater -Byrd -Hunt -Love -Simonds
NOES: COUNCIIIEN: None
ABSENT COUNCILP�N: None
Her er K. te, Cry Clerk
SUP01ARY
EXTRA F'ZYM-T-AISLITIONS
SEWAGE PLANT EXPA3 SION Job #50-41
1TE:i: DESCRIPTION
COST
STATUS
REIw1ARKS
Contract
4118,411.00
Approved
Alternate bid was de -
Sewage pump
1,500.00
"
ducted from contract
price 0119,911.;fur-
nished by City.
Extra #1 Sludge bed (relocate)
10971.00
Approved
L.S. bid w/extra
cost for fill Sc pay.
Extra #2 Grit collector (replace) 5,567.00 Approved L.S. bid for labor
plus 15% of cost to
contractor. City pays
for mechanism.
Extra
#3
Trestle (install)
Rejected
Not essential
Extra
#4
Tie Down Rods (replace)
1,760.00
Approved
L. S. bid
Extra
#5
Pump Station Paving
Rejected
Too expensive
Extra
#6
Worm gear (alternate)
421.00
Approved
L. S. Bid
Extra
#7
Fence (relocate & extend)
Rejected
Possible later
Extra
#8
Paint exist. building
954.00
Approved
L. S. Bid
Extra
#9
Electrical. conduit
Rejected
Not essential
Extra
#10
Paving plant (alternate)
Rejected
Possible later
Extra
#11
12" gate valve (alternate)
Rejected
Not essential
Extra
#12
Air gap device (install)
11400.00--
Approved
L. S. bid -required
by State
Extra #13 Cleanouts (install) 935.00
Extra #14 Sewage By-pass (install) 3,768.00
Extra #15 Digester Independent
operation (alternate) 1,340.00
138,047.00
Engineering & Inspection 2,000.00
Total Cost 140,047.00
Amount budgeted 142,000.00
Approved
Approved
Approved
L. S. bid
L. S. bid
L. S. bid
Tate Titg of -gnrIinpm-P
SAN MATEO COUNTY
CALIFORNIA
February 5, 1951
Honorable City Council,
City of Burlingame
Burlingame, California
Gentlemen: Re: Recommended Additions to the Sewage
Viorks Enlargements
Submitted herewith for your approval is a summary of nine ad-
ditional proposed jobs to be added to the above mentioned con-
tract. The total amount of cost involved from preliminary
estimates of the additional work orders amounts to y18,135.00.
As you will note from the summary attached, the total amount
budgeted is 0142, 000., of which the State matches vvi th 4"71, 000
under Chapter 20 funds. 'with these additions, if approved,
the total cost of the project will amount to approximately
°140,000.
Kr. Harry N. Jenks, Consulting Sanitary Engineer, and myself
have made a study of these recommended additions and have come
to an agreement on their advantages. Also submitted is a
statement from Tdr. Jenks verifying his approval.
Respectfully submitted,
G . J. 1;iarr
Director of iublic '14orks
BJ1:m