Loading...
HomeMy WebLinkAboutReso - PC - 090-2001 RECORDING REQUESTED BY: Plamiing`Department 091936 Cityof Burlingame �0�: � .�0 0 2— 05/09/2002 12.18P R1 Fee:NC WHEN RECORDED MAIL TO: Page 1 of 9 PLANNING DEPARTMENT Recorded in official Records County of San Mateo CITY OFBURLINGAME Warren Slocum 501 PRIMROSE ROAD Assessor-County Clerk-Recorder BURLINGAME,CA 94010 Recorded iBy �! I ` � II I It I 11 i I �I� �� �I � II Resolution No. 90-2001 1219 VANCOUVER AVENUE; APN: 027-340-170 TITLE OF DOCUMENT 3 I hereby certify this to be a full,true and correct copy of the document it purports to be,the original of which is on file in my office. Date: 11.05.01 Margatr t Monrod, City Planner r RESOLUTION APPROVING CATEGORICAL EXEMPTION, DESIGN REVIEW AND SPECIAL PERMIT RESOLUTION—90-2001 RESOLVED,by the Planning Commission of the City of Burlingame that: WHEREAS, a categorical exemption has been proposed and application has been made for design review and special permit for height for a new two-story single family dwelling and detached garage at 1219 Vancouver Avenue, zoned R-1,Ramin and Natalie Forood, property owners, APN: 027-340-170; WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on October 9,2001, at which time it reviewed and considered the staff report and all other written materials and testimony presented at said hearing; NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that: 1. On the basis of the Initial Study and the documents submitted and reviewed, and comments received and addressed by this commission, it is hereby found that there is no substantial evidence that the project set forth above will have a significant effect on the environment, and categorical exemption, per CEQA Article 19. Categorically Exempt per Section: 15303 - Class 3 -construction and location of limited numbers of new, small facilities or structures including(a) single-family residences not in conjunction with the building of two or more such units, is hereby approved. 2. Said design review and special permit are approved, subject to the conditions set forth in Exhibit"A" attached hereto. Findings for such design review and special permit are as set forth in the minutes and recording of said meeting. 3. It is further directed that a certified copy of this resolution be recorded in the official records of the County of San Mateo. 4HAIRMAN I, Joseph Bojues ,Secretary of the Planning Commission of the City of Burlingame,do hereby certify that the foregoing resolution was introduced and adopted at a regular meeting of the Planning Commission held on the 9th day of October, 2001 ,by the following vote: AYES: COMMISSIONERS: Auran, Bojues,Keighran, Key Mink, Osterling and Vistica NOES: COMMISSIONERS: NONE ABSENT: COMMISSIONERS: NONE I � IIIIIIIII�IIIIIIIIIIIIIIIIIIIIII�IIIIIIIIIIIIIIiIIIIIII P1 Page,Zoom—OS 0022 0091 93F SEC f EXHIBIT "A" Conditions of approval for categorical exemption, design review, and special permit. 1219 Vancouver Avenue effective October 16, 2001 1. that the project shall be built as shown on the plans submitted to the Planning Department date stamped August 7, 2001, sheets L-1, Al.l —A1.3,A2.1 —A2.3, and A3.1 —A3.3, and that any changes to the footprint or floor area of the building shall require and amendment to this permit; 2. that any changes to the size or envelope of the first or second floors, which would include adding or enlarging a dormer(s), moving or changing windows and architectural features or changing the roof height or pitch, shall be subject to design review; 3. that the conditions of the Chief Building Official's, Fire Marshal's, City Engineer's, and Recycling Specialist's July 9, 2001, memos shall be met; and 4. that the project shall meet all the requirements of the California Building Code and California Fire Code, 1998 edition, as amended by the City of Burlingame. IIIIIIIIIIIII1�IiIIIIIIIIIIIIIII�IIII�II�III�IIi�Illlll 05/0912002 3 o09P193� ROUTING FORM DATE: July 9, 2001 TO: _City Engineer hief Building Official Fire Marshal _Recycling Specialist Sr. Landscape Inspector _City Attorney FROM: Planning Staff SUBJECT: Request for design review and special permit for height for a new two-story single family dwelling at 1219 Vancouver Avenue, zoned R-1, APN: 027-340-170. STAFF REVIEW: Monday, July 9, 200�1jQ PX 76 /s O Sle OP L TH - S14o1 '0100 05/09/200 II!TIT III IIIII IT IN 20022 12 90 R1 Page: �3F AA�Reviewed By: Date of Comments: ROUTING FORM DATE: July 9, 2001 TO: _City Engineer _Chief Building Official _dire Marshal Recycling Specialist _Sr. Landscape Inspector _City Attorney FROM: Planning Staff SUBJECT: Request for design review and special permit for height for a new two-story single family dwelling at 1219 Vancouver Avenue, zoned R-1, APN: 027-340-170. STAFF REVIEW: Monday,July 9, 2001 0Q aAzo!�t '36 v 12 I-&_t N i M o 1A- C.b�,)a"Vucpzy.3 CC-WW_-(Z iytfvfl� _1�1` � IIIIIIIIIIIIIIIIIIIIII�IIIIIIIIIIIIIIIIIIIIIIIIIIiI!II� 2@0 05 0091 936 ReviewedjB :j"0_) Date of Comments: 9— d J ROUTING FORM DATE: July 9, 2001 TO: _City Engineer IIIIIIIIIIIIIIIIIIIII�IIIIIIIIIIIIIIIIIII II I�IIIIIII� 05/09i2002 12 18P g36 Chief Building Official _Fire Marshal Recycling Specialist.. Sr. Landscape Inspector _City Attorney FROM: Planning Staff SUBJECT: Request for design review and special permit for height for a new two-story single family dwelling at 1219 Vancouver Avenue, zoned R-1, APN: 027-340-170. STAFF REVIEW: Monday,July 9, 2001 Co rJs�r" Reviewed By: Date of Comments: D ROUTING FORM DATE: July 9, 2001 TO: City_Engineer _Chief Building Official Fire Marshal Recycling Specialist _Sr. Landscape Inspector _City Attorney FROM: Planning Staff SUBJECT: Request for design review and special permit for height for a new two-story single family dwelling at 1219 Vancouver Avenue, zoned R-1, APN: 027-340-170. STAFF REVIEW: Monday,July 9, 2001 1111111IillIIIIIIIIIiIIIIIIIIIIIIIIIIIIliHill1III�II1 ?00z� o00 936 Reviewed By: Gl�'tyy Date of Comments: O PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION PLANNING REVIEW COMMENTS _ Project Name: Project Address: 1/A+Z V-w The following requirements apply to the project 1 V A property boundary survey shall be preformed by a licensed land surveyor. The survey shall show all property lines, property corners, easements, topographical features and utilities. (Required prior to the / building permit issuance.) 2 ✓ The site and roof drainage shall be shown on plans and should be made to drain towards the Frontage Street. (Required prior to the building permit issuance.) 3. The applicant shall submit project grading and drainage plans for approval prior to the issuance of a Building permit. 4 The project site is in a flood zone,the project shall comply with the City's flood zone requirements. 5 A sanitary sewer lateral test is required for the project in accordance with the City's standards. (Required prior to the building permit issuance.) 6. The project plans shall show the required Bayfront Bike/Pedestrian trail and necessary public access improvements as required by San Francisco Bay Conservation and Development Commission. 7. Sanitary sewer analysis is required for the project. The sewer analysis shall identify the project's impact to the City's sewer system and any sewer pump stations and identify mitigation measures. 8 Submit traffic trip generation analysis for the project. 9. Submit a traffic impact study for the project. The traffic study should identify the project generated impacts and recommend mitigation measures to be adopted by the project to be approved by the City Engineer. 10. The project shall file a parcel map with the Public Works Engineering Division. The parcel map shall show all existing property lines, easements, monuments,and new property and lot lines proposed by the map. IIIIIIIIIIIilllllllllllll{I{IIIIIIIIII{{Ililllillllllll 05@022;09P 93� Page I of 3 UAprivate developmenAPLANNING REVIEW COMMENTS.doc IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII R1/0 Page: 009f 12 1 936 PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION 11. A latest preliminary title report of the subject parcel of land shall be submitted to the Public Works Engineering Division with the parcel map for reviews. 12 Map closure/lot closure calculations shall be submitted with the parcel map. 13 The project shall submit a condominium map to the Engineering Divisions in accordance with the requirements of the Subdivision Map Act. 14 The project shall, at its own cost, design and construct frontage public improvements including curb, gutter, sidewalk and other necessary appurtenant work. 15 The project shall, at its own cost, design and construct frontage streetscape improvements including sidewalk, curb, gutters, parking meters and poles, trees, and streetlights in accordance with streetscape master plan. 16 By the preliminary review of plans, it appears that the project may cause adverse impacts during construction to vehicular traffic, pedestrian traffic and public on street parking. The project shall identify these impacts and provide mitigation measure acceptable to the City. 17 The project shall submit hydrologic calculations from a registered civil engineer for the proposed creek enclosure. The hydraulic calculations must show that the proposed creek enclosure doesn't cause any adverse impact to both upstream and downstream properties. The hydrologic calculations shall accompany a site map showing the area of the 100-year flood and existing improvements with proposed improvements. 18 Any work within the drainage area, creek, or creek banks requires a State Department of Fish and Game Permit and Army Corps of Engineers Permits. 19 / No construction debris shall be allowed into the creek. 20 ✓ The project shall comply with the City's NPDES permit requirement to prevent storm water pollution. 21 The project does not show the dimensions of existing driveways, re- submit plans with driveway dimensions. 22 The plans do not indicate the slope of the driveway, re-submit plans showing the driveway profile with elevations, 4w4- Page 2 of 3 UAprivate developmentTLANNING REVIEW COMMENTS.doc