HomeMy WebLinkAboutReso - PC - 090-2001 RECORDING REQUESTED BY:
Plamiing`Department 091936
Cityof Burlingame �0�: � .�0 0 2—
05/09/2002 12.18P R1 Fee:NC
WHEN RECORDED MAIL TO: Page 1 of 9
PLANNING DEPARTMENT Recorded in official Records
County of San Mateo
CITY OFBURLINGAME Warren Slocum
501 PRIMROSE ROAD Assessor-County Clerk-Recorder
BURLINGAME,CA 94010 Recorded iBy
�! I ` � II I
It
I 11 i
I �I� ��
�I
� II
Resolution No. 90-2001
1219 VANCOUVER AVENUE; APN: 027-340-170
TITLE OF DOCUMENT
3
I hereby certify this to be a full,true
and correct copy of the document it purports
to be,the original of which is on file in
my office.
Date: 11.05.01
Margatr t Monrod, City Planner r
RESOLUTION APPROVING CATEGORICAL EXEMPTION,
DESIGN REVIEW AND SPECIAL PERMIT
RESOLUTION—90-2001
RESOLVED,by the Planning Commission of the City of Burlingame that:
WHEREAS, a categorical exemption has been proposed and application has been made for design
review and special permit for height for a new two-story single family dwelling and detached garage at 1219
Vancouver Avenue, zoned R-1,Ramin and Natalie Forood, property owners, APN: 027-340-170;
WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on
October 9,2001, at which time it reviewed and considered the staff report and all other written materials and
testimony presented at said hearing;
NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that:
1. On the basis of the Initial Study and the documents submitted and reviewed, and comments
received and addressed by this commission, it is hereby found that there is no substantial evidence that the
project set forth above will have a significant effect on the environment, and categorical exemption, per
CEQA Article 19. Categorically Exempt per Section: 15303 - Class 3 -construction and location of limited
numbers of new, small facilities or structures including(a) single-family residences not in conjunction with
the building of two or more such units, is hereby approved.
2. Said design review and special permit are approved, subject to the conditions set forth in
Exhibit"A" attached hereto. Findings for such design review and special permit are as set forth in the minutes
and recording of said meeting.
3. It is further directed that a certified copy of this resolution be recorded in the official records
of the County of San Mateo.
4HAIRMAN
I, Joseph Bojues ,Secretary of the Planning Commission of the City of Burlingame,do hereby certify
that the foregoing resolution was introduced and adopted at a regular meeting of the Planning Commission
held on the 9th day of October, 2001 ,by the following vote:
AYES: COMMISSIONERS: Auran, Bojues,Keighran, Key Mink, Osterling and Vistica
NOES: COMMISSIONERS: NONE
ABSENT: COMMISSIONERS: NONE
I �
IIIIIIIII�IIIIIIIIIIIIIIIIIIIIII�IIIIIIIIIIIIIIiIIIIIII
P1 Page,Zoom—OS
0022 0091 93F SEC
f
EXHIBIT "A"
Conditions of approval for categorical exemption, design review, and special permit.
1219 Vancouver Avenue
effective October 16, 2001
1. that the project shall be built as shown on the plans submitted to the Planning Department
date stamped August 7, 2001, sheets L-1, Al.l —A1.3,A2.1 —A2.3, and A3.1 —A3.3, and
that any changes to the footprint or floor area of the building shall require and amendment
to this permit;
2. that any changes to the size or envelope of the first or second floors, which would include
adding or enlarging a dormer(s), moving or changing windows and architectural features
or changing the roof height or pitch, shall be subject to design review;
3. that the conditions of the Chief Building Official's, Fire Marshal's, City Engineer's, and
Recycling Specialist's July 9, 2001, memos shall be met; and
4. that the project shall meet all the requirements of the California Building Code and
California Fire Code, 1998 edition, as amended by the City of Burlingame.
IIIIIIIIIIIII1�IiIIIIIIIIIIIIIII�IIII�II�III�IIi�Illlll
05/0912002 3 o09P193�
ROUTING FORM
DATE: July 9, 2001
TO: _City Engineer
hief Building Official
Fire Marshal
_Recycling Specialist
Sr. Landscape Inspector
_City Attorney
FROM: Planning Staff
SUBJECT: Request for design review and special permit for height for a new two-story single family
dwelling at 1219 Vancouver Avenue, zoned R-1, APN: 027-340-170.
STAFF REVIEW: Monday, July 9, 200�1jQ PX
76
/s O Sle OP L
TH -
S14o1 '0100
05/09/200
II!TIT III IIIII IT IN 20022 12 90 R1 Page: �3F
AA�Reviewed By: Date of Comments:
ROUTING FORM
DATE: July 9, 2001
TO: _City Engineer
_Chief Building Official
_dire Marshal
Recycling Specialist
_Sr. Landscape Inspector
_City Attorney
FROM: Planning Staff
SUBJECT: Request for design review and special permit for height for a new two-story single family
dwelling at 1219 Vancouver Avenue, zoned R-1, APN: 027-340-170.
STAFF REVIEW: Monday,July 9, 2001
0Q aAzo!�t
'36
v 12 I-&_t N i M o 1A- C.b�,)a"Vucpzy.3
CC-WW_-(Z iytfvfl� _1�1` �
IIIIIIIIIIIIIIIIIIIIII�IIIIIIIIIIIIIIIIIIIIIIIIIIiI!II� 2@0 05 0091 936
ReviewedjB :j"0_) Date of Comments: 9— d J
ROUTING FORM
DATE: July 9, 2001
TO: _City Engineer IIIIIIIIIIIIIIIIIIIII�IIIIIIIIIIIIIIIIIII II I�IIIIIII� 05/09i2002 12 18P
g36
Chief Building Official
_Fire Marshal
Recycling Specialist..
Sr. Landscape Inspector
_City Attorney
FROM: Planning Staff
SUBJECT: Request for design review and special permit for height for a new two-story single family
dwelling at 1219 Vancouver Avenue, zoned R-1, APN: 027-340-170.
STAFF REVIEW: Monday,July 9, 2001
Co rJs�r"
Reviewed By: Date of Comments: D
ROUTING FORM
DATE: July 9, 2001
TO: City_Engineer
_Chief Building Official
Fire Marshal
Recycling Specialist
_Sr. Landscape Inspector
_City Attorney
FROM: Planning Staff
SUBJECT: Request for design review and special permit for height for a new two-story single family
dwelling at 1219 Vancouver Avenue, zoned R-1, APN: 027-340-170.
STAFF REVIEW: Monday,July 9, 2001
1111111IillIIIIIIIIIiIIIIIIIIIIIIIIIIIIliHill1III�II1 ?00z� o00 936
Reviewed By: Gl�'tyy Date of Comments: O
PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION
PLANNING REVIEW COMMENTS _
Project Name:
Project Address: 1/A+Z V-w
The following requirements apply to the project
1 V A property boundary survey shall be preformed by a licensed land
surveyor. The survey shall show all property lines, property corners,
easements, topographical features and utilities. (Required prior to the
/ building permit issuance.)
2 ✓ The site and roof drainage shall be shown on plans and should be made to
drain towards the Frontage Street. (Required prior to the building permit
issuance.)
3. The applicant shall submit project grading and drainage plans for
approval prior to the issuance of a Building permit.
4 The project site is in a flood zone,the project shall comply with the City's
flood zone requirements.
5 A sanitary sewer lateral test is required for the project in accordance with
the City's standards. (Required prior to the building permit issuance.)
6. The project plans shall show the required Bayfront Bike/Pedestrian trail
and necessary public access improvements as required by San Francisco
Bay Conservation and Development Commission.
7. Sanitary sewer analysis is required for the project. The sewer analysis
shall identify the project's impact to the City's sewer system and any
sewer pump stations and identify mitigation measures.
8 Submit traffic trip generation analysis for the project.
9. Submit a traffic impact study for the project. The traffic study should
identify the project generated impacts and recommend mitigation
measures to be adopted by the project to be approved by the City
Engineer.
10. The project shall file a parcel map with the Public Works Engineering
Division. The parcel map shall show all existing property lines, easements,
monuments,and new property and lot lines proposed by the map.
IIIIIIIIIIIilllllllllllll{I{IIIIIIIIII{{Ililllillllllll 05@022;09P 93�
Page I of 3
UAprivate developmenAPLANNING REVIEW COMMENTS.doc
IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII R1/0
Page: 009f 12 1 936
PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION
11. A latest preliminary title report of the subject parcel of land shall be
submitted to the Public Works Engineering Division with the parcel map
for reviews.
12 Map closure/lot closure calculations shall be submitted with the parcel
map.
13 The project shall submit a condominium map to the Engineering Divisions
in accordance with the requirements of the Subdivision Map Act.
14 The project shall, at its own cost, design and construct frontage public
improvements including curb, gutter, sidewalk and other necessary
appurtenant work.
15 The project shall, at its own cost, design and construct frontage streetscape
improvements including sidewalk, curb, gutters, parking meters and poles,
trees, and streetlights in accordance with streetscape master plan.
16 By the preliminary review of plans, it appears that the project may cause
adverse impacts during construction to vehicular traffic, pedestrian traffic
and public on street parking. The project shall identify these impacts and
provide mitigation measure acceptable to the City.
17 The project shall submit hydrologic calculations from a registered civil
engineer for the proposed creek enclosure. The hydraulic calculations
must show that the proposed creek enclosure doesn't cause any adverse
impact to both upstream and downstream properties. The hydrologic
calculations shall accompany a site map showing the area of the 100-year
flood and existing improvements with proposed improvements.
18 Any work within the drainage area, creek, or creek banks requires a State
Department of Fish and Game Permit and Army Corps of Engineers
Permits.
19 / No construction debris shall be allowed into the creek.
20 ✓ The project shall comply with the City's NPDES permit requirement to
prevent storm water pollution.
21 The project does not show the dimensions of existing driveways, re-
submit plans with driveway dimensions.
22 The plans do not indicate the slope of the driveway, re-submit plans
showing the driveway profile with elevations,
4w4-
Page 2 of 3
UAprivate developmentTLANNING REVIEW COMMENTS.doc