HomeMy WebLinkAboutReso - PC - 033-1995 RECORDING REQUESTED BY:
Planning Department
City of Burlingame
WHEN RECORDED MAIL TO: I OFFICIAL RECORDS OF SAN MATEO COUNTY
I ASSESSOR-COUNTY CLERK-RECORDER
PLANNING DEPARTMENT I WARREN SLOCUM
CITY OF BURLINGAME
501 PRIMROSE ROAD I Recorded at Request of
BURLINGAME,CA 94010 I CITY OF BURLINGAME
96-057601 05/13/96 10:27
Recording TMEDINA
Fee:
Resolution No. 33-95
550 EL CAMINO REAL; APN: No. 029-111-250
TITLE OF DOCUMENT
m
0
cm
V
C"
O
I hereby certify this to be a full, true
and correct copy of the document it purports
to be, the original of which is on file in
my office.
Date: 1.3.96
Margaret Monroe, City Planner
RESOLUTION NO.� �
RESOLUTION APPROVING NEGATIVE DECLARATION
CONDOMINIUM PERMIT AND LANDSCAPING VARIANCE
RESOLVED, by the Planning Commission of the City of Burlingame that:
WHEREAS, a negative declaration has been proposed and application has been made for a
condominium permit for a new three story, 12 unit residential condominium with underground garage
at 550 El Camino Real zoned R-3 APN: 029-111-250 ; property owner: Stuart B. Aronoff, 2659
Pierce Street, San Francisco ; and
WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on
December 11. 1995 , at which time it reviewed and considered the staff report and all other written
materials and testimony presented at said hearing;
NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that:
1. On the basis of the Initial Study and the documents submitted and reviewed, and comments
received and addressed by this commission, it is hereby found that there is no substantial evidence that
the project set forth above will have a significant effect on the environment, and Negative Declaration
Refer to new Negative Declaration 476-P and previous negative declaration ND 463-P attached to this
staff report, is hereby approved.
2. Said condominium permit and landscaping variance is approved subject to the conditions
set forth in Exhibit "A" attached hereto. Findings for such condominium permit and landscaping variance
are as set forth in the minutes and recording of said meeting.
3. It is further directed that a certified copy of this resolution be recorded in the official
records of the County of San Mateo.
ni,l,t.
CHAIRMAN
I, Karen Key , Secretary of the Planning Commission of the City of Burlingame, do hereby
certify that the foregoing resolution was introduced and adopted at a regular meeting of the Planning
Commission held on the 11th day of December , 1995 , by the following vote:
AYES: COMMISSIONERS: DEAL, ELLIS, GALLIGAN, KEY, MINK AND WELLFORD
NOES: COMMISSIONERS: NONE
ABSENT: COMMIS:-IONERS: JACOBS
7
SECRETARY
�,. a.•
EXHIBIT "A"
Conditions of approval negative declaration condominium permit and landscaping variance
550 EL CAMINO REAL
effective JANUARY 2, 1996
1 . that the project shall be built as shown on the plans submitted to the Planning Department
and date stamped November 17, 1995 , Sheets DD1 , DD2, DD3 & DD4;
2 . that the conditions set forth in the Fire Marshal's July 30, 1993 memo, the City
Engineer' s August 17, 1993 memo and the Park Director's July 30 and August 2, 1993
memo and the Senior Building Official' s November 20, 1995 memo shall be met;
3 . that a security system with and intercom to each unit shall be provided for access to the
designated guest parking in the garage and a mirror shall be installed half way down the
garage ramp for vehicles exiting the garage to see on coming cars;
4. that a total of 3 guest parking stalls shall be designated and marked on the final map and
plans, and not assigned to any unit, but shall be owned and maintained by the
condominium association;
5 . that the final inspection shall be completed and a certificate of occupancy issued before
the close of escrow on the sale of each unit;
6. that the developer shall provide the initial purchaser of each unit and to the board of
directors of the condominium association , and owner purchaser manual which shall
contain the name and address of all contractors who perform work on the project, copies
of all warranties or guaranties of appliances and fixtures and the estimated life
expectancy of all depreciable component parts of the property, including but not limited
to the roof, painting, common area carpets, drapes and furniture;
7. that the parking garage shall be designed to city standards and shall be managed and
maintained by the condominium association with one space assigned to each unit, three
(3) designated guest parking spaces and the remaining spaces rented for a nominal fee
by the association only to the residents with two cars; and no portion of the parking area
and aisles shall be converted to any other use than parking or used for any support
activity s«ch as storage unit, utilities or other non-parking use;
8 . that the furnaces and water heaters shall be shown in a legal compartment outside of the
required parking and landscaping and in conformance with zoning and Uniform Building
Code and Uniform Fire Code requirements before a building permit is issued;
EXHIBIT "A"
Conditions of approval negative declaration condominium permit and landscaping variance
550 EL CAMINO REAL
effective JANUARY 2, 1996
page -2-
9. that for the protection of pedestrians a silent auto warning system shall be installed at the
ingress/egress area to the underground parking garage;
10. that the location of trash receptacles shall be approved by the City Engineer;
11. that the exhaust system shafts for the underground garage shall be located to avoid
landscaping and walkways;
12. that the maximum elevation at the top of the roof ridge and parapet wall shall not exceed
elevation 74.33' (74'-4") as measured from the average elevation at the top of the curb
along El Camino Real for a maximum height of 35'-0", and that the top of each floor
and final roof ridge shall be surveyed and approved by the City Engineer as the framing
proceeds and prior to final framing and roofing inspections. Should any framing exceed
the stated elevation at any point it shall be removed or adjusted so that the final height
of the structure with roof shall not exceed the above stated specifications; and
13. that the project including egress and access requirements, shall meet all the requirements
of the municipal code and Uniform Building and Uniform Fire Codes as amended by the
City of Burlingame.
ROUTING FORM
DATE: O • (?3
TO: CITY ENGINEER
CHIEF BUILDING INSPECTOR
✓ FIRE MARSHAL
PARRS DIRECTOR
CITY ATTORNEY
FROM: CITY PLANNER/ZONING )TECHNICIAN
SUBJECT: REQUEST FOR CnI17do fen rna D� n o, c�e�
J
AT 55v
SCHEDULED PLANNING COMMISSION ACTION MEETING: e I , 3 , Igg3
REVIEWED BY STAFF IN MEETING ON MONDAY :
THANKS,
Jane/Sheri/Leah 7- 310 -23 Date Of Comments
FOA-
SQr� �Ks�L syr r��ti , j&7
�N !�(Vi.�''`l '( � R f- � ✓j.N�
7-14,Rl" 6 Ti4 _ N4 � 0 . :✓O>
gl 9 /9 3 bx/r,
ROUTING FORM
DATE: l Zv 9
TO: x CITY ENGINEER
CHIEF BUILDING INSPECTOR
FIRE MARSHAL
PARKS DIRECTOR
CITY ATTORNEY
FROM: CITY PLANNER/PLANNER
SUBJECT: REQUEST FOR
AT /��
c. a
SCHEDULED PLANNING COMMISSION ACTION MEETING:_ ;
REVIEWED BY STAFF MEETING ON MONDAY:
THANKS,
Jane/Sheri/Leah 1 V U 3d Date of Comments
� y R
MEMORANDUM
TO: PLANNING DEPARTMENT
FROM: CITY ENGINEER
DATE: AUGUST 17, 1993
RE: CONDOMINIUM PERMIT - RESUBDIVISION OF A PORTION OF LOTS
7 AND 8, BLOCK 8, MAP NO. 2 OF THIS BURLINGAME LAND CO -
550 EL CAMINO REAL, PM 93-5
PLANNING COMMISSION QUESTIONS
At their meeting of August 9, 1993, the Commission asked the
following questions regarding traffic:
Following are Engineering staff answers.
1. Question: Is the circular driveway needed?
Answer: Architect's letter of August 11, 1993 gives reasons
for this driveway. It may help reduce accident potential if a
split driveway is utilized as planned one in and one out.
2. Question: What is the assumption of 5 trips per day based on?
Answer: The July 10, 1993 "Residential Condominium Trip
Generation" study from the Traffic Engineer RKH indicates that
nationally recognized trip generation studies were the basis
of the computations.
CONDOMINIUM PERMIT
I have reviewed the August 2, 1993 resubmittal.
I have the following conditions that should be attached to any
approvals.
I GENERAL•
1. All roof and site drainage shall go to street by gravity.
Show direction of drainage on adjacent property to confirm
that no drainage enters this site or else that drainage needs
to be included in the on-site system.
2. Confirm prior to issuance of any Building Permit that the
proposed drainage system meets the State Department of
Transportation's approval.
3. Provide the required seven foot (71) minimum clearances at
parking garage floor areas. Provide room for all pipings,
ducts and fire sprinklers. Disabled parking shall have access
and parking area at eight feet two inches (81211) clear.
-1-
4 . All utilities to this site shall be installed underground.
5 . New curb, gutter and sidewalk fronting this site shall be
designed by a civil engineer, approved by the City Engineer,
and installed by this development.
II SITE LANDSCAPES AND PLANS:
1. Caltrans must review and approve all E1 Camino Real accesses.
They have had major questions in the past for double driveways
as well as spacing between a new driveway and an adjacent
property' s driveway. Applicant must receive approval prior to
issuance of a Building Permit.
2 . Transformer is not shown on site? All transformers needed for
this project will be conditioned to be installed on this site
either underground or behind the front setback.
3 . All irrigation systems and planting shall follow City's water
conservation guidelines.
4 . Permanent signs and markings shall be placed and maintained
indicating entrance and exit directions on the circular
driveway.
III PARKING•
1. Underground and at-grade parking slab elevations and slopes
shall be shown on Final Plans. Maximum slope in any parking
space is 5%. Finished floor elevations and drainage pattern
shall also be shown.
2 . All on site drainage inlets or the sump pump basin for the
underground garage with a petroleum absorbent system for all
drainage flows from the automobile parking areas.
3 . Columns that are on the side of parking spaces are to be clear
of vehicle' s side door access and should be at least two feet
(21 ) clear of the rear of the stalls to facilitate
maneuvering.
4. The underground garage walls clearances at property line shall
be calculated by the Civil Engineer or Surveyor and shown on
Building Permit Plans. Show how the walls are going to be
constructed without easements on adjacent property? Final
plans shall show how excavation is to be made on property with
room and for back of wall drainage.
5 . Plans shall show a driveway profile with a 2% slope from top
of curb (6" high minimum) to back of sidewalk and transition
to a high point, on site or at property line, at 12" above
flow line of street. Transitions at top of driveway and at
bottom are required for approval of the City Engineer.
IV ARCHITECTURAL PLANS:
1. Final Plans shall provide all unit dimensions and exterior
dimensions. -2-
2 . The Design of the trashroom shall indicate size of
receptacles, including receptacles for recycling. Confirm
sizes needed with BFI .
3 . The Parking Level Plan and First Floor (Site) Plans , shall
show adjacent site and street elevations for reference .
4 . Elevator sump drainage shall go to sanitary sewer and is to be
separate from groundwater system which shall go to the storm
drainage system.
5 . All building sections shall show site elevations and adjacent
site elevations and show them to scale to give the
relationship.
6 . Individual unit climate controls as well as separate shut-offs
for gas , electric and water are required.
Frank C. Erbacher
City Engineer
pa
cc: owner, Architect
-3-
ROUTING FORM
DATE : 2 3
TO : CITY ENGINEER
CHIEF BUILDING OFFICIAL
FIRE MARSHAL
PARRS DIRECTOR
CITY ATTORNEY
FROM : CITY PLANNER/ZONING TECHNICIAN
SUBJECT : REQUEST FOR &'yv\,J
_
0&L ' Tl o ;
AT _ 15 "s- 0 2-- � c1`-
SCHEDULED PLANNING COMMISSION ACTION MEETING : 01
n A 1
REVIEWED BY STAFF IN MEETING ON MONDAY :
THANKS ,
Jane/ Sheri/Leah 730 -9� Date of Comments
+ � � 3
0
�� ;-� wQ� �� sen-� ��� � � 17oo ✓
O Av
A--
G
ROUTING FORM
DATE: 1� Jte7l' S
TO: CITY ENGINEER
— CHIEF BUILDING INSPECTOR
FIRE MARSHAL
PARKS DIRECTOR
CITY ATTORNEY
FROM: CITY PLANNER/PLANNER
SUBJECT: REQUEST FOR
AT Lo
SCHEDULED PLANNING COMMISSION ACTION MEETING: /0"eac
REVIEWED BY STAFF MEETING ON MONDAY: )")111.
THANKS ,
Jane/Sheri/Leah Date of Comments
/w G %7
145�w4o;�wl ".'r
AOKI 9
7 7AI
��