HomeMy WebLinkAboutReso - CC - 057-1980I
RESOLUTION NO. 57 - 80
AUTHORIZING EXECUTION OF COST SHARING
AGREEMENT
1133 DOUGLAS
RESOLVED, by the CITY COUNCIL of the City of Burlingame
California, and this Council does hereby FIND, ORDER AND DETER-
MINE as follows:
1. The public interest and convenience require execu-
tion of the agreement cited in the title above.
2. The City Manager be, and he is hereby, authorized
to sign said agreement for and on behalf of the City of
Burlingame.
3. The City Clerk is hereby ordered and instructed to
attest such signature,
ayor
I, EVELYN H. HILL, City Clerk of the City of
Burlingame, do hereby certify that the foregoing Resolution was
introduced at a regular meeting of the City Council held on the
15th day of September , 1980, and was adopted thereafter
by the following vote:
AYES: COUNCILMEN: Amstrup-Barton-Crosby-Mangini-Martin
NOES:
{ ABSENT:
COUNCILMEN: None
COUNCILMEN: None
✓ 7/ I/_
City Clerk
COST SHARING AGREEMENT
1133 DOUGLAS
THIS AGREEMENT, entered into this 15th day of September,
1980, by and between the CITY OF BURLINGAME, hereinafter referred
to as "City," and 1133 DOUGLAS ASSOCIATES, a limited partnership,
S. LOGAN OWENS, JR., General Partner, hereinafter referred to as
"Associates,"
W I T N E S S E T H:
WHEREAS, Associates is the owner of certain property
fronting upon Douglas Avenue in Burlingame; and
WHEREAS, it is the desire of City to participate with
Associates in the construction of a new water main to serve the
property at 1133 Douglas Avenue, Burlingame, and others abutting
the main, thereby providing adequate water supply to serve the
proposed development of Associates; and
WHEREAS, Associates is the owner of the following
properties located on Douglas Avenue:
and
1133 Douglas Avenue; Assessor's Parcels
Nos. 029-133-030 and 029-133-040;
WHEREAS, Associates desires to construct its project
as soon as possible, and said project's fire protection demands
exceed the capacity of the existing water main; and
WHEREAS, City cannot provide design engineering
services within the construction schedule of Associates; and
WHEREAS, Associates desires to record the Final Parcel
Map for the division of a portion of Lots 4, 6 and 7, Block 4,
9/3/80 1
9/10/80
"Map No. 2 of the Property of the Burlingame Land Co." filed
in Map Book 3 at page 22, prior to installation of the new
water main; and
WHEREAS, it is the desire of the parties to contri-
bute to the total costs to install the new water main as
hereinafter set forth;
NOW. THEREFORE, it is AGREED by the parties hereto
as follows:
1. Associates or their contractors or agents will
prepare plans and specifications for the construction of a water
main to be placed in Douglas Avenue from Primrose Road to the
northerly line of the project site; said plans and specifications
shall be approved by the City Engineer. Associates or their
contractors or agents will construct and complete said water
main as a part of building improvements taking place upon said
property and prior to issuance of a building occupancy permit.
Associates shall obtain a minimum of three bids for the construc-
tion and installation of the water main improvements as set forth
in the approved plans and specifications. Associates shall accept
only such bid as may be approved by the Director of Public Works
of City. The Director of Public Works shall have the right to
reject all bids.
2. Associates shall file with the City, along with this
agreement, cash, surety bond, or other security approved by
City in a sum equal to the estimated cost of said improvements,
including contingencies and engineering, as estimated by the
City Engineer and amounting to the sum of thirty thousand
dollars ($30,000.00) as surety for the faithful performance of
the terms of this agreement.
3. It is agreed that City shall pay one hundred
percent (100%) of the construction costs and Associates shall
2
pay all engineering costs and costs related to preparation of
plans, specifications, estimates and soliciting and receiving
bids and awarding the contract. City shall pay all of the con-
struction costs upon submission of monthly bills by Associates
and approval by the Director of Public Works.
"Construction" shall include, but shall not be limited
to materials, installation, inspection, compaction testing, and
any work incidental to the construction of the main and replace-
ment of existing water connections. Any new water connection
costs for Associates' project shall be paid by Associates.
4. Associates, and any persons awarded the contract
for the construction of the improvements, shall be an independent
contractor and shall not under any circumstances be deemed to be
the agent or servant of City or any other party to this agreement.
5. Upon completion of construction, and inspection, and
acceptance the the City, Associates shall furnish a one (1) year
maintenance bond in favor of the City in the amount of ten percent
(10%) of the construction costs of the water line. After the expira-
tion of said one (1) year maintenance period. Associates shall be
released and relieved by City from all further responsibility for
maintenance, repair or replacement of said improvements, and City
shall assume all further responsibility therefor, and shall defend
and indemnify Associates from all claims or liability arising
thereafter related to design and/or construction of the water line
improvements.
IN WITNESS WHEREOF, the parties hereto have executed
this agreement as of the day and year above written.
CITY OF BURLINGAME,
a mu . . al corporation
By
City Nafidger
ATTEST: / V
ty Clerk
1133 DOUGLAS ASSOCIATES,
a limited partnership
By
S. LoTgan Owens, Jr.
General Partner